KOKOBEN PROJECT 1.3 | First Floor Block Work To Roofing Wooden Framework | Building In GHANA

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ต.ค. 2024
  • Continuation of Kokoben Project 1.2.
    This video gives a hint of our day-to-day operations at site/work and a walkthrough of both ground floor and first floor.
    It does throw light on the after effect of using the timber (wawa 1x12 boards) for the carpentry formwork for the slab.
    Floating stairs was well revealed, though it was hinted in 1.1.
    NB : The roof framework's formwork will be well covered in an upcoming video.
    A LOT OF EDUCATIONAL VIDEOS ABOUT BUILDING AND CONSTRUCTION ON THE WAY, SUBSCRIBE AND KEEP THE BELL ON JUST SO YOU DONT LOOSE AN EPISODE. THANK YOU.
    _____________________________________________________
    For more information reach us at:
    Tel : +233240020446 / +233269689144
    Email @webuild@gmail.com
    IG : @WebuildGhana
    FB: @WebuildGhana
    TikTok : @Webuild Ghana
    _____________________________________________________
    #webuild #ghana #webuildghana #construction #accra #kumasi #realestate #building #buildinginghana

ความคิดเห็น • 3