The situation of maintaining lapping zones asper the codal provisions will be difficult under situation of providing dowel bar for longer span beams,where we need to cast the beams later stage of project.The couplers are very useful under these situations. Also wastage of reinforcement bars will be higher for maintaining lapping zones asper IS codes.I prefer to cut the reinforcement bars of the following lengths 3m,4m,6m,8m
Don’t use 6m for your ease. Try using beam length 3.2m beam depth 450mm with 20mm rebars used as main rebars and 8mm as stirrups. Then you will realize the cons and its difficulty. Although whatever you said is true but sometimes in certain cases it is not feasible as the lapping zones seems to coincide almost within the same zones
Clear Height between plinth beam top and roof beam bottom-11 feets Zone-A-11/4=33 inches Zone-B-11*12-66=132 -66=66 inches There are 6 bars 16mm@4,12mm@2 At zone B top- 2 no of lappings At zone B middle(30 inch below top lapping points)-3 no of lapping At Zone B bottom (30 inch below middle lap point)-1 lapping Whether the above arrangement is allowble? Whether lintel tie beam can be provided any zone? What if lintel tie beam falls on zone-A top area?
But in our site the lift lobby area has a beam of 200×1240, which witdth to depth ratio is 0.161, is this a design mistake? or this rule can be break in some special cases, please give answer sir.
Sir for 20 feet span 6 no's 16 mm rod is used in beam for g+2 house .In between 20 feet distance pillar one small pillar of 4 no's 12 mm resting on underground beam also provided just 6 feet away from centre pillar ..it is ok or need to add more steel.?beam depth 14inch +6 inch slab thickness.column is 4 no's 16 mm &4 no's 12 mm
Hello Mr. Amitji , Please make videos on Excavation for deep foundations near adjacent structures, safety and shoring details , soil investigation , Control Blasting . Thanks.
सर यदि बीम का क्लियर स्पान 5 मीटर हो और बीम 700mm डेपथ हो और उसमें 20 एमएम का सरिया लग रहा है तो फिर उसमें किसी प्रकार की कोई जगह ही नहीं बचेगी। उस कंडीशन में क्या करेंगे
Sir beam top main lap center main aur beam bottom m side lap kyo dete hai aur yah bhi bataye ki Beam m top main s.f. aur b.m.kha aata hai aur bottom m kha aata hai aur as per is code. Aur 13920 ka 2016 revision hai aur aap 2003 ke according bta rhe h
If the 2d length fall beyond L/4 then what to do sir? I mean if 2 times of our beam depth is 40 inch and L/4 distance is less than 40 inch which one should we follow?
Sir aap jo Is code use kiya hai wo 2003 ka hai aur iska latest revision 2016 ks hai aapne is video m clearly nhi btaya hai ki beam bottom m kha pr aur top m kha pr lal dena chaiye so plz sir mera req hai ki aap video dobara banaye jisse muje bhot help miligi. Aur sir reply jarur dijiyega.
Some missing points.IS 13920 FOR BEAM CASE. 1.The Factored axial stress on the member under earthquake shall not exceed 0.1fck 2. The width of the member shall not be less then 200mm.
Please make a video for Overlap length kya lo gai for billing k liye. (One floor pr) 1)Over lap 32 Dia se reduce ho kr 25 mm ho gya . 2) over lap 25 Dia se increase ho kr 32 Dia ho gya .
Aise cases may always take d as your smaller Dia of bar and rest things are same .koi special Ld nahi Hoti hai bar ki dia. Change ho to refer IS 456 2000 U WILL HAVE BETTER KNOWLEDGE
Column में Bottom area में L की length कितनी होती है और क्यों???? Example Bottom mash dai 12mm both side Clear cover 50mm Footing depth 600mm Column bar 16mm Ld = 50d = 800mm So L = 800-(600-50)-24=226mm पर ये तो कम है।।।। और अगर आप 300mm कहना चाहते है तो क्यों??? हर जगह जवाब ढूंढा, नहीं मिला, पर आपसे उमीद है।।।
From bottom of beam to centre of main bar, If Cover 25mm & Main bar 20mm than 25mm + 10mm = 35mm effective cover, also if beam depth 600mm than effective depth of beam = 600mm - 35mm = 565mm, Clear
Clear Height between plinth beam top and roof beam bottom-11 feets Zone-A-11/4=33 inches Zone-B-11*12-66=132 -66=66 inches There are 6 bars 16mm@4,12mm@2 At zone B top- 2 no of lappings At zone B middle(30 inch below top lapping points)-3 no of lapping At Zone B bottom (30 inch below middle lap point)-1 lapping Whether the above arrangement is allowble? Whether lintel tie beam can be provided any zone? What if lintel tie beam falls on zone-A top area?
Further if you have any query / questions, Please comment
The situation of maintaining lapping zones asper the codal provisions will be difficult under situation of providing dowel bar for longer span beams,where we need to cast the beams later stage of project.The couplers are very useful under these situations.
Also wastage of reinforcement bars will be higher for maintaining lapping zones asper IS codes.I prefer to cut the reinforcement bars of the following lengths 3m,4m,6m,8m
No English here
Sir, video 8:48 clause 4.4.1 and other clause not mentioned which IS code please tell me it will help me.
Sir aapki sab video technical hai bahut achhi se samjate hai aap Please aap jyada se jyada video banate jao tx sir
Really sir, you have fantastic knowledge of this field, lovely video full of knowledge thx
Explicitly explained ,wow.
Best Deep Knowledge explaination
Very good explanation sir
Your trick is so good to explain anything .
🙏 great knowledge
Thank you sir,Kafi aacha samjha dia,Kafi kam time main...🙏🙏
Came to the right place to clear my doubts. Thanks
Great sir, your video is diff. Bcoz u always make video with ref to is codes
Good work friend
sir great information on great factual things on this uploaded video.regards.
Thanks for making this Vedio thanks
Nice video sir .good very good
Thank you so much sir, it's very important point
Don’t use 6m for your ease. Try using beam length 3.2m beam depth 450mm with 20mm rebars used as main rebars and 8mm as stirrups. Then you will realize the cons and its difficulty. Although whatever you said is true but sometimes in certain cases it is not feasible as the lapping zones seems to coincide almost within the same zones
Clear Height between plinth beam top and roof beam bottom-11 feets
Zone-A-11/4=33 inches
Zone-B-11*12-66=132 -66=66 inches
There are 6 bars 16mm@4,12mm@2
At zone B top- 2 no of lappings
At zone B middle(30 inch below top lapping points)-3 no of lapping
At Zone B bottom (30 inch below middle lap point)-1 lapping
Whether the above arrangement is allowble?
Whether lintel tie beam can be provided any zone?
What if lintel tie beam falls on zone-A top area?
But in our site the lift lobby area has a beam of 200×1240, which witdth to depth ratio is 0.161, is this a design mistake? or this rule can be break in some special cases, please give answer sir.
Excellent
Nice 👍 sir thank you 🙏
Super Sir
Maja aa gya sir
Narayan Bless 🙏 You
Good morning Sir, Is improper position of bottom bar lapping in beam can crack the underneath brick wall in future?
Great information sir thanks for sharing,what if one beam crossing perpendicular to each other but no column below junction
Dear Sir the Clause No. 4.4.1 you referred in the video is from which code ?
Plz tell
Sir ham 2d bina chode nhi kar sakty hai lapping.
Near by column m?
Kar sakte h, lekin stirupps / ring ka spacing 75mm c/c rakhna over all lap length par
@@FactualCivilEngineering thank for your reply sir.
Sir lapping zone of slab p v video banao plzz
Sir for 20 feet span 6 no's 16 mm rod is used in beam for g+2 house .In between 20 feet distance pillar one small pillar of 4 no's 12 mm resting on underground beam also provided just 6 feet away from centre pillar ..it is ok or need to add more steel.?beam depth 14inch +6 inch slab thickness.column is 4 no's 16 mm &4 no's 12 mm
You are god 🙏
Apne Kaha Beam Ki width or depth ka ration...... .3 or .4 ke bich me hona chhahiye... To beam ki depth with slab gini jayegi.... Ya without slab
Sir top me sare lapping center me hi hogaye..
Would love to have MEP rate analysis, Costing and measurement video from you.
Thanking you sir giving us to good knowledge....
So plz make video on mix designs
How to calculate cement sand and aggregates in 1m3
Sir where should laps be given in a beam resting on firm ground. For example a plinth beam resting on pcc.
Sir please clear last important point that you have said,you will clear in the next video, waiting for your video's
Hello Mr. Amitji ,
Please make videos on Excavation for deep foundations near adjacent structures, safety and shoring details , soil investigation , Control Blasting .
Thanks.
How to find development length at beam to beam for connecting
Thank you sir, you should open an institute for site engineers. I'll pay you 1Lakh for this knowledge 😁
Good evng sir, ek video aap false ceiling ke measurement per bhi banye, with cove and without cove.
👍👍👍
Dear friends can any one tell in the video 8:48 clause 4.4.1 which IS code..please reply me
Plz tell the is code name. I need it.
Please explain the in the beam of 14mtrs span
Plz explain lapping for slab n raft in same manner
Ye 1.3time kya hai sir
Sir if lap length fully cover inside column lapzone, it is safe
Yea it is safe we can say, but shouldn't be at joint face in any case as per is code
सर यदि बीम का क्लियर स्पान 5 मीटर हो और बीम 700mm डेपथ हो और उसमें 20 एमएम का सरिया लग रहा है तो फिर उसमें किसी प्रकार की कोई जगह ही नहीं बचेगी। उस कंडीशन में क्या करेंगे
Kya aap drawing ko share kar sakte h..my mail id is amit.ggn277@gmail.com, so that I can provide better solution / technical answer
Sir ur explanation is good
But please improve voice quality
Sir namaskar appka cellphone kya hai , share with me
Sir please tell me about lap zone in cantilever beam
Sir beam top main lap center main aur beam bottom m side lap kyo dete hai aur yah bhi bataye ki Beam m top main s.f. aur b.m.kha aata hai aur bottom m kha aata hai aur as per is code. Aur 13920 ka 2016 revision hai aur aap 2003 ke according bta rhe h
Can you make a video on Productivity of manpower engaged in various tasks on site ?
check it
Sir tell us about lap length for welding a steel bar.
If the 2d length fall beyond L/4 then what to do sir? I mean if 2 times of our beam depth is 40 inch and L/4 distance is less than 40 inch which one should we follow?
Did you get your answer bro
❤❤
U r taking 50% of moment at half of 2nd L/4 .how that?does -ve BM starts at exactly L/4 from the column face?
exactly
Sir aap jo Is code use kiya hai wo 2003 ka hai aur iska latest revision 2016 ks hai aapne is video m clearly nhi btaya hai ki beam bottom m kha pr aur top m kha pr lal dena chaiye so plz sir mera req hai ki aap video dobara banaye jisse muje bhot help miligi. Aur sir reply jarur dijiyega.
Some missing points.IS 13920 FOR BEAM CASE.
1.The Factored axial stress on the member under earthquake shall not exceed 0.1fck
2. The width of the member shall not be less then 200mm.
Please make a video for Overlap length kya lo gai for billing k liye. (One floor pr)
1)Over lap 32 Dia se reduce ho kr 25 mm ho gya .
2) over lap 25 Dia se increase ho kr 32 Dia ho gya .
Aise cases may always take d as your smaller Dia of bar and rest things are same .koi special Ld nahi Hoti hai bar ki dia. Change ho to refer IS 456 2000 U WILL HAVE BETTER KNOWLEDGE
sir,please upload about the Right Method for Placing of Lapzone in Column Reinforcement.regards
Sir top m jo lap dena hai uske bare m aapane details m nhi bataya h
At the end you said the spacing should be min 150 mm however acc to IS code it should be max 150mm
It's not exceeding 150mm. He said minimum 150mm by mistake.
less than 1.3Times below. What is this plzz explain
Sir 300mm ho tho
Drawing ke bare janna hai ditel se mughe nhiata hai
Amit ur friend
Column में Bottom area में L की length कितनी होती है और क्यों????
Example
Bottom mash dai 12mm both side
Clear cover 50mm
Footing depth 600mm
Column bar 16mm
Ld = 50d = 800mm
So
L = 800-(600-50)-24=226mm
पर ये तो कम है।।।।
और अगर आप 300mm कहना चाहते है तो क्यों???
हर जगह जवाब ढूंढा, नहीं मिला, पर आपसे उमीद है।।।
shear force and bending moment ke Aadhar per Aadhar per Diya Jata Hai Kisi Ek Aadhar per Kiya jata hai aapane pura spasht tarike se nahin bataya hai
Sar aap ka email id hi dijiye kam se kam apps per reply to kar denge
अपने बीम के टॉप बार के लेप के बारे में इसमें डिटेल में नहीं बताया है
Sir clause 4.4.1 jo l/4 ka explanation diya he vo samaj me nhi aaya thik se
Effective depth clear nhi samjaya bro
From bottom of beam to centre of main bar, If Cover 25mm & Main bar 20mm than 25mm + 10mm = 35mm effective cover, also if beam depth 600mm than effective depth of beam = 600mm - 35mm = 565mm, Clear
From bottom ki from top sir
Clear Height between plinth beam top and roof beam bottom-11 feets
Zone-A-11/4=33 inches
Zone-B-11*12-66=132 -66=66 inches
There are 6 bars 16mm@4,12mm@2
At zone B top- 2 no of lappings
At zone B middle(30 inch below top lapping points)-3 no of lapping
At Zone B bottom (30 inch below middle lap point)-1 lapping
Whether the above arrangement is allowble?
Whether lintel tie beam can be provided any zone?
What if lintel tie beam falls on zone-A top area?