(a) Determine the economic operating cost for this 3 units when delivering a total load of 850MW. The fuel cost for unit 1 is 1.1N/MBTU, unit 2 is 1.0N/MBTU and unit 3 is 1.0N/MBTU. (b). Assume the price of coal decrease to 0.9N/MBTU in the system (i) above. Determine the economic operating cost.
Capital cost Expenses for planning and designing Minimum 10 yrs of future req Land and preparation of site(road, rail) Building Plant equipment Testing of equipment Fixed cost Annual cost Interest Insurance Taxes
Very Nice Explanation given by Sir.
Mahesh
ICOER, Pune
(a) Determine the economic operating cost for this 3 units when delivering a total load of 850MW. The fuel cost for unit 1 is 1.1N/MBTU, unit 2 is 1.0N/MBTU and unit 3 is 1.0N/MBTU.
(b). Assume the price of coal decrease to 0.9N/MBTU in the system (i) above. Determine the economic operating cost.
Capital cost
Expenses for planning and designing
Minimum 10 yrs of future req
Land and preparation of site(road, rail)
Building
Plant equipment
Testing of equipment
Fixed cost
Annual cost
Interest
Insurance
Taxes