First installation / OROS SUN / HU

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ม.ค. 2025
  • First installation of the OROS SUN foldable sunflower header.
    Chapters:
    0:00 First installation of OROS SUN (foldable)
    0:49 Adjusting the header to working position
    1:49 Removing the transport frame
    3:15 Removing the transport parts
    4:21 Fixing the frame (combine specific!)
    5:08 Connecting the multi coupler (combine specific!)
    5:48 Removing the transport parts
    8:20 Adjusting the support stands into work position
    9:21 Adjusting the snouts
    11:08 Adjusting the snouts position
    12:09 Header folding (combine specific!)

ความคิดเห็น •