At 10.13 minutes....left side Tower Car shed will be dismantled for new platform purpose and now New Shed is constructing beside 1st platform, while entering from DMM side you can notice it.
Looks like New Platform & Station building at Anantapur will take more time than laying railway line. Rest of the works can be completed in about 3 months.
Yes Nene adiganu SM ni.... Existing 2 PFs and 3rd platform kothaga em undadu just extension of 2nd platform inkoncham Width increase chesthunaru and other side Entrance ki automatically inko platform vastunde... But thing is 4th platform width will be less bcz of already constructed Station buildings ( Too much place waste chesaru inka 10 feet vennaki construct chesundali Building. Anyway 4 PF's Pakka. Kani okka Stable line kuda ledu in case future lo ikkada nundi start aiyye trains ki useful ga.
@@ranadheerkumar3951 Looks to be 3 pfs only. It will be a wonder if it is 4 pfs. Too much of place has been wasted for station building . Trains have to start either from DMM or KLU only.
@@TheAravelli Tirumala Exp extended to Kadapa but watering kosam Kondapuram which is 80km from Kadapa... Ikkada Anantapur ki extend chesthe watering kosam just 27kms .... Narsapur Dmm extend cheyohu and Bangalore Cantonment - DMM Memu train kuda easy ga extend cheyohu watering tho pani ledu.
Please like, share the video and subscribe to my channel
Nice Captured Bro! ❤️
Thanks for watching
At 10.13 minutes....left side Tower Car shed will be dismantled for new platform purpose and now New Shed is constructing beside 1st platform, while entering from DMM side you can notice it.
I didn't notice it ,But thanks for watching
ధర్మవరం పాకాల రైల్వే లైన్ కరెంట్ లైన్ గురించి ఒక వీడియో తీయండి బ్రదర్
th-cam.com/video/8uJf-xplHl0/w-d-xo.html
Dharmavaram pakala eliteration CRS date brother
@@lavanyamekala3984 3 parts kinda Chestaaru
1) Dharmavaram Kadiri
2) Kadiri - Madanapalle
3 ) Madanapalle - Pakala out of 227 kms ,177km electrified
I think in future Prasannayapalli will be main station of Anantapur city
No ,Only for Freight loading Shifted
Nice.
Thanks for watching
@Bandi Ashok bro anantapur platform update icharu bro
4 ena
@@MyWayRailway idea ledhu bro
As always , thank you🙌. Will you be uploading PKD - DMM section too ?
Thanks for ur support, I already covered it previously ,but its progress is almost same so did not cover it now
రైల్వే సి ఆర్ ఎస్ అంటే అర్థం అన్నా
CRS ante Commissioner of Railway Safety .Veeru evarante edaina Railway project complete ayaka , Checking , Inspection chestaru kadha. vaalu approve chestene trains kotha track paina veltai
Looks like New Platform & Station building at Anantapur will take more time than laying railway line. Rest of the works can be completed in about 3 months.
Yes let's see
Bro meeru travel chesina train name
Yesvantpur- Hatia Express
Confirme ga 4 platforms na??
Okatanu chepparu ,He talked to SM of ATP
Yes Nene adiganu SM ni.... Existing 2 PFs and 3rd platform kothaga em undadu just extension of 2nd platform inkoncham Width increase chesthunaru and other side Entrance ki automatically inko platform vastunde... But thing is 4th platform width will be less bcz of already constructed Station buildings ( Too much place waste chesaru inka 10 feet vennaki construct chesundali Building. Anyway 4 PF's Pakka. Kani okka Stable line kuda ledu in case future lo ikkada nundi start aiyye trains ki useful ga.
@@ranadheerkumar3951 finally 4 platforms pakka
@@ranadheerkumar3951 Looks to be 3 pfs only. It will be a wonder if it is 4 pfs. Too much of place has been wasted for station building . Trains have to start either from DMM or KLU only.
@@TheAravelli Tirumala Exp extended to Kadapa but watering kosam Kondapuram which is 80km from Kadapa... Ikkada Anantapur ki extend chesthe watering kosam just 27kms .... Narsapur Dmm extend cheyohu and Bangalore Cantonment - DMM Memu train kuda easy ga extend cheyohu watering tho pani ledu.
Video Eppudu teesaru bro
March 7 or 8
Bro meeru travel chesina express route diverted aa?
Yes