actually site engr. ako ...last position ko is pic...kahit hindi qs dapat as civil engr. kaya mo dapat mag derive...ung books eh fjardo at toralba...ang mahalaga eh site recording...tandaan o e record ung mga experiences mo.
I have made a research on gabions eto nadampot ko...productiviy 1.25cum to 1.5 cum-1man-1day..mukhang may project ka na river control o retaining wall.sa productivity kasama na ung cage fabrication.
thank you for this knowledge sir!
thank po
quantity surveyor po ba kayo dati..ano po recommended nyo na books etc..for bagohang qs
actually site engr. ako ...last position ko is pic...kahit hindi qs dapat as civil engr. kaya mo dapat mag derive...ung books eh fjardo at toralba...ang mahalaga eh site recording...tandaan o e record ung mga experiences mo.
thanks po sa tutorial.
@@axcelengineering
Boss Axcel Productivity rate ng Gabion installation.thanks
hindi ko pa na experience gabion!!!pero cge e search ko...
I have made a research on gabions eto nadampot ko...productiviy 1.25cum to 1.5 cum-1man-1day..mukhang may project ka na river control o retaining wall.sa productivity kasama na ung cage fabrication.
@@axcelengineering thank Boss Godbless
@@BobBaldesancho boss baka pede mo i share channel ko lalo na dun sa mga newly grad. makatulong eto sa kanila tnx.