COST OF BUILDING 3 BEDROOM HOUSE THIS MONTH FROM FOUNDATION TO WALLPLATE
ฝัง
- เผยแพร่เมื่อ 2 ต.ค. 2024
- All you need to know about construction materials prices "Ebbeyi Yebizimbisibwa" In Uganda.
Cost of materials for constructing 6 rental rooms.
Cost of cement current prices in Uganda
cost of materials for Roofing 6 rental rooms
cost of timbers and current prices in different areas
cost of materials for building a 3 bedroom house
bill of quantities for roofing and ceiling 3 bedroom house
Septic tank and sock pit how much it can cost you
Paving your compound cost of pavers in Uganda
Cost of all types of iron sheets in Uganda
Plasamk Construction Professionals.
You imagine and we design we have experts and well educated, experienced engineers that's why we are no.1 construction company in Uganda
We do Roofing at all styles, ceiling, paving, plastering, build all types of buildings, electricity installation, etc.
Follow us on TikTok, Facebook, TH-cam, WhatsApp
"plasamk construction professionals"
we work at every part of Uganda concerni
15m sisobola Okunzimbila a 3 bedroom house in the village. Without bathrooms. Are Nga ne bu rooms Nga butonotono? I want build for my mum. Wano ewaffe block ya 150. Ate omusenyu motoka enene eli ku 100k.
Yes that money is enough to build it from the foundation to the wallplate/ roofing level
Thank you for the content you are creating. HOw much would a 2 bedroom house cost?
WhatsApp or call me
Engineer pliz help me with a quotation of a 3bed room house, sitting room ,bathroom and store
Very informative. Thanks for the content.
Excellent work. Thanks for being transparent always
Thank you
Great work and excellent elaboration. Thanks so much.
Kind suggestion, since you also mentioned that clients don't want to buy tools, consider having them in your company, and go with them them to the site
Good work engineer
That's my dream house oh my God
Oh sure
I really like your work and I will use you in the future
Alright thank you
Please second part
Thank you 👍 i have forwarded your video to my friends
How much money can I use to build a business house in the village two rooms Infront and behind two rooms
Come to my Whatsapp thank you
I want a house around 35 to 70million
It would okay next time if you also English so that people who don't understand Luganda can get you.
But thanks for the presentation
The story is incomplete what's the total cost, and how long does it take ?
We have been building it in phases but but when all done 70 to 80m that range
Give me the total sum of that house please I will inform you when am ready don't forget to forward your watsup number.
What would be yo costs besides having my material?? How much is grading in semuto area??
Whatsapp or call me and we talk thank you
Thanks for the work.. Can you let me know the labor cost for the 3 bed room
Come to my Whatsapp or call for that 0755330103
How many sacks of cement can two rooms and a store take, sand,brinks, and stone.
Bricks 7000
Cement 30
Sand 3 fwds
Why don't you first pour slab before raising the walls, which one is better
If you don't want to damage the foundation you raise the walls first
Can this house fit on the plot size of 50by 50 and i get space for car parking and small garden? Because i dont want garage on it but i want the same size of the house am waiting for you feed back thank you so much
Not really but unless when you don't put big rooms
@@plasamkconstruction do you have any sulosatio for me
Please second part
Thanks Eng. Samuel dear for that work 🙏🙏🙏
You're welcome
Engineer nsaba kubuuza nze o we Mubende osobola okunyamba like nga njagala ku ziimba thanks
Sebo what if i don't need the behind shade, material akenderako kyenkanawo?
Not really nothing much changes
Hello Mr can you tell me how much do a room of three bedrooms,three toilets,dinning, kitchen, store, sitting room, and tow shads Infront and back side thanks am waiting can you please tag me in this video for my request ❤
Thanks for the good work.
You gave the measurements of the bedrooms and other areas but no measurements for the full house and the plot size where it is being constructed.
Plot size is 60×70ft
How much is labour paka ku wall plate?
Labour is discussed with the person going to do that work if us Whatsapp or call me
Compare the cost of building this building using bricks and using concrete blocks
Concrete blocks may take you 2000 that range
Can I only construct the outside part of the foundation then I put the slab? And construct the other parts inside??
Yes it's very possible
Can you build for me at less than 30 percentage labour charges
Whatsapp or call me and we talk
Thnx for nice work
Nze mbuza bubuza anti enju Yona nga ewedde etwala sent mekka?
Whatsapp or call me for that
Hi Jonah I am building a children's home but the thing has come big😅
Oh sure
How much did it cost all from the beginning up to the finishing plus labour
Whatsapp or call me for that
Engineer Sam , the clay brick you said is 390 @ and the mud brick 250/= why?!
A'm teddy from masaka villamariam can you up date me nze njagala renevation of my parents
Renovation for the entire house or roof only
Thank you for sorting out three Districts in that province.God bless.
Bless you too thank you
Pipes ziba mmeka zonna awamu good program
Whatsapp or call me for that
Whats the full total feom geound till finishing and erything
Whatsapp or call me and ask me if it thank you
Can you work in Mbarara?
Yes we do
How many rooms? Is of that house
3 bedrooms
The location is very nice where is this place
Buloba
Mukoma mu bitundu kki okuzimba? Muyingira emasaka?
Yes
Ate fortpotal musobola okujja?@@plasamkconstruction
So which is the 9 9 blocks or clay blocks
Papa why is it that nowadays its not necessary to use ventilators. And ma house at start they didn't use big stones down just bricks without cement is it okay ?
Ventilators now days are put on the doors and windows by the welders... that upper part of the door or a window
How much from the ground up to wall plate plus the slabs
What are the overall square meters of the house?
How much does it costs for the whole house
Finishing the whole house give it a budget of 80-100m
@@plasamkconstructionehh amanyi gampwedde😂😂😂
Abakubi ba plan mbafuna ntya nyamba
Brother i want same design but with 4 bedrooms , big sitting room and big dining room.
Come to my Whatsapp and we do some changes to the plan
Come to my Whatsapp and we do some changes to the plan
Saved ur no. Expect a call soon u are real have seen
Ok sure thank you
Garage, corridor in 2024?
What's the purpose of tht big store in that house
Yes very transparent
Yes
I need your service
What or call me for that
Can u come to Buvuma Island??
When building or roofing.?
@@plasamkconstruction Building the whole house to finish but in phases
Enju etudde kubugazi bwenkanaki (plot)?
70×60ft
Very important information
Webale kuwelezza mukwano
Thanks for appreciating
Location of this place please?
Buloba mityana road
it would be better if you share the ground plan at the end of the video as you are explaining the dimensions. thanks
Alright thank you
Good work bro wats that plot size
60×70ft
Ekibanja kyenkanawa, era kyagula sente meka, kyap kya bwananyini oba (mile land) kya bupangisa oba (lease). Eisenberg ebisulwamu bimeka
Ebisenge ebisulwamu biri bisaatu
Plot ya kyapa
Size yayo eri 60×70ft
It's location is buloba mityana road and the plots in this estates are of 55-60m
Bro i have an upcoming project in Buyala close to this location, i want a 2bed room self contained. Hw much would it cost me up to the wall plate?
I hv to work with you next year
Thank you let me wait for your call
Awesome work.... following
Thanks 👍
Enyumba bwetyo elikubugazi bwenkanaki obwetaka
60-70ft
How far can 20m take me.Already have the plot
From the foundation to the wallplate and some few balance
Bwene kubira burokaa nukugura ewdde ekyangu
Bwebakubira kiba kilunji
Thanks so much brother
You're welcome
Mention about putting slab
Alright am working on it thank you
I want for two rooms and a store
Whatsapp or call me for more
Thanks for the work
You're welcome
Keep it up
Good work done
I love the area and the way you drive that construction 🚧 😍 💕
Thanks for appreciating
How much is the cost of four bedroom house with two bathrooms and two toilets dinning and kitchen with three car parking space.
Come to my WhatsApp and share me it's plan
Send me your WhatsApp number. I want to build in Luweero
Excavation wa sente mekka mukulu, that excavator
It costed us 700,000 only
Great information
Thank you
Can you work in maska
Yes
How many bricks does it when you use 9.9 bricks
2000 Brocks
U work is neat
Thanks for appreciating
I like the plan
Thank you
Where I live they don't offload bricks like that
Oh sure how do they do it
This is very great
Thank you
English Sir🙏
Ok gonna find a solution soon
Great Work
Engineer levelling with a grader costs how much
700,000
i thought 700k is the price to rent the grader for half a day without fuel in most areas around Kampala@@plasamkconstruction
thank you
You're welcome
Total?
The total is included in the video
Enyumba ya bisengebisatu sente meka
You want to buy or to build it
Can this house reach on 23ft 60
Not really
the side of 60 is ok but 23 is so little
Thanks so much dear for the good work
It's my pleasure
👍
Thank you
DO U Draw plans of any kind?
I have a person who does them for me
Kumusinji sawulidde mayinja
Yes because they were not necessary
We only Used them at the beam concrete
Update on Plastering too
Ok gonna do that soon
Where is your office
Nansana at Jenina stage
Okyali mwana okubera ku videos zabantu abakulu gwe owulidde
Wtf
👍
Thnx
How much money for labour to build the same house using blocks to wall plate
Labor is discussed with the person that is going to do that work so if us Whatsapp or call me
How much is whole project?
First give it a budget of 80m