Can i use 1/2 rebar or 1/2 inch copper for the electrical ground?? Did you connect the main sewer line 4 inch to the existing sewer line prior to the inspection?? good work.
20’ of 4AWG copper wire or 20’ of 1/2” rebar at the bottom of the footing. The sewer connection will be made later. You just need the under slab plumbing inspected.
@@URBNBLDRS Yes sir, copy that, i will do the same to my in coming adu. still waiting for the permit, DSD noted that it us in proceses... youre the man.
Nice work! Thanks for these, keep the videos coming for this property
Thank you Erik. Glad you like them!
Can i use 1/2 rebar or 1/2 inch copper for the electrical ground?? Did you connect the
main sewer line 4 inch to the existing sewer line prior to the inspection?? good work.
20’ of 4AWG copper wire or 20’ of 1/2” rebar at the bottom of the footing. The sewer connection will be made later. You just need the under slab plumbing inspected.