Hi john. Fantastic build.were can you buy the small people figures that you put on the titanic. And what scale were thay.i am from uk..I'm loving your vedo builds.thanks john.
Hi John, Sorry, I have a question. I saw that there is a Hachette 1/250 Titanic for sale on ebay. In the title it says "Hachette 1/250 Build The Titanic 1-100 Complete". I am confused. I would like to know how many issue were completed.
Hi, the ship I have built is 1.200 scale and 140 issues to complete. The listing could be the 1st 100 issues assembled, but may need the last 40 issues to complete the build. Unless its another build.
Hi John, off topic. The world of wayne recent vid said that Hachette are going to issue new hinges for the uc bay doors to fix the closing problem on the Lanc.
@ so stage 145 is the very last stage and then the entire model is complete? Also, at what stage is the main structure (boat, promenade and bridge decks) affixed to the hull? Thanks for the advice- I just finished stage 122 so trying to plan for the final part of the build.
Hi John, as we are in Germany only at issue 127 and I‘ve got the possibility to buy a Display stand at a Special Price, I would Like to ask you about the real Dimensions of the Titanic. Length, with and height (being on the the stand up to the top of the highest Mast. Thanks a lot.
Vergonzoso lo de Hachette con la construcción del Titanic . Con 100 fascículos podía haber estado terminado . Muchas veces prácticamente no había nada en entregas y ahora lo alarga . En Argentina varias veces no hubo entregas . Así que lo estoy terminando con partes desarrolladas por mí y lo terminaré con la entrega número 96 . Me ayuda que soy ingeniero naval muy veterano . En Argentina las 140 entregas tienen un valor de 1680 u$s . Más de dos modelos del Titanic de Lego que es espectacular .
Great video John looking brilliant 👏
Thanks Rod 👍 😊
I've read the specs for this model.
It's going to look great when it's done.
😊👍
Great build and vid 🍺💞🙏💪👍
Thanks 👍Eddy
excellent build John its looking really good so far
Cheers Dave 😊👍
Nice❤
👍😊
Hi john. Fantastic build.were can you buy the small people figures that you put on the titanic. And what scale were thay.i am from uk..I'm loving your vedo builds.thanks john.
Ebay, Tori factory. 👍
Thanks very much for that.
Hi John, Sorry, I have a question. I saw that there is a Hachette 1/250 Titanic for sale on ebay. In the title it says "Hachette 1/250 Build The Titanic 1-100 Complete". I am confused. I would like to know how many issue were completed.
Hi, the ship I have built is 1.200 scale and 140 issues to complete. The listing could be the 1st 100 issues assembled, but may need the last 40 issues to complete the build. Unless its another build.
Hi John, off topic. The world of wayne recent vid said that Hachette are going to issue new hinges for the uc bay doors to fix the closing problem on the Lanc.
Yes, that's what I thought was the problem. we just need the replacements. 😊👍
Hey John, do you know how many total stages/packs there are until completion?
The engine is complete after stages 141 to 190. 👍
@ so stage 145 is the very last stage and then the entire model is complete? Also, at what stage is the main structure (boat, promenade and bridge decks) affixed to the hull? Thanks for the advice- I just finished stage 122 so trying to plan for the final part of the build.
@ryan1828 Stage 140 completes the ship. Stage 141 is the extension.
@@JohnsModelmaking Thanks again!
Hi John, as we are in Germany only at issue 127 and I‘ve got the possibility to buy a Display stand at a Special Price, I would Like to ask you about the real Dimensions of the Titanic. Length, with and height (being on the the stand up to the top of the highest Mast. Thanks a lot.
My ship is in its case, and the dimensions for the case are on my community page posted 3 months ago. 👍
Vergonzoso lo de Hachette con la construcción del Titanic . Con 100 fascículos podía haber estado terminado . Muchas veces prácticamente no había nada en entregas y ahora lo alarga . En Argentina varias veces no hubo entregas . Así que lo estoy terminando con partes desarrolladas por mí y lo terminaré con la entrega número 96 . Me ayuda que soy ingeniero naval muy veterano . En Argentina las 140 entregas tienen un valor de 1680 u$s . Más de dos modelos del Titanic de Lego que es espectacular .