Thanks Sir for sharing your knowledge. Kindly let me know this thumb rules are from your experience or you refer to some standard also you not mention for electrical and plumbing works productivity.
Sir, I have doubt. For 200thk AAC blockwork productivity is more (10sqm) than compared to 100-150thk AAC blockwork masony. Not able to understand its logic. Kindly clarify.
I observed that Bathroom flooring gives less productivity than room flooring, because of less work space, desired slope towards trap. 2) Painting work productivity taken very high..pls confirm...3) Waterproofing productivity taken very less..
@@KnowledgeHubllt ok.. But boss the fact is that no one in the market agrees to this information and contractor may incurr losses. Moreover, cpwd recommendations are somewhat contrasting from your figures..
It depends upon efficiency of workers. It may change as per efficiency of workers. Like skilled , semiskilled.... It's as per practical experience for reference. Theoretically it may be different.
Ekdam bakwas thumbrule bina ground knowledge ka vedeo mt bnao plzzzz....plaster ka btya 10 square meter 1 mason,1 majdur,1lady yani ki 800+500+400=1700 10 sqm. Sq feet m kre to 107 sqt. Market m rate 13 to 20 h per sqare feet.. 15 average milta h 1500 hi hoga fir bhi kya 👎 rule
Amazed knowledge u have friend.God bless u for ur endless efforts.🙏🙌🙏🙌👍👍🌺🌹💐💐
Thanks
Great info
Thanks
Very nice..... work oriented 🎉🎉🎉
Thank you
Well done
Informative👌👌
Good.
In depth analysis on labor 👍👍👍👍👍 prodivity
Thanks
Nice information 👌👍
Thanks
Sir RCC work jese 4 lane flyover m scaffolding or steel Shuttering labour productivity including staging and steel bta dijiye please
This labour productivity is for building
Please make video on Post tensioning slab
Ok
Project palaning construction video
How only 1.25 sqm work of 4.5" brick work can be done ie only comes to 13.45 sft it's too less productivity to be checked again please reply
Ok
Thanks Sir for sharing your knowledge.
Kindly let me know this thumb rules are from your experience or you refer to some standard also you not mention for electrical and plumbing works productivity.
Thank you. Thumbrules I have mentioned are as per standard practice..I will post the video on Tumbrules for electrical & plumbing soon..
@@KnowledgeHubllt Thank you sir for your reply. I will be waiting for you videos on electrical and plumbing thumb rules
Ok sir
Sir, I have doubt. For 200thk AAC blockwork productivity is more (10sqm) than compared to 100-150thk AAC blockwork masony. Not able to understand its logic. Kindly clarify.
for 100-150 thk AAC blockwork, productivity is told as 8sqm
For 100 mm thick blockwork binders Or patali beams are required after every 1m height...
Sir agar 1 ton steel cutting and binding karwana ho to kitna Mason and labour lagega ek din me
5 fitter and 5 helpers lagega
Sir im a new subscriber here..can you give me example Problem..using your thumb rule labor ratio..thanks😊
Ok sure
@@KnowledgeHubllt ill wait for it here sir
Sir , gulf construction labor productivity pls explain, their woman workers are not , pls rply
Ok, will check....
I observed that Bathroom flooring gives less productivity than room flooring, because of less work space, desired slope towards trap. 2) Painting work productivity taken very high..pls confirm...3) Waterproofing productivity taken very less..
Ok
सरिया fitter एंड कारपेंटर एक दिन में कितना productvity होता है ।
Fitter कितना______ kg
कारपेंटर _____sqm
Already mentioned in video please watch full video
@@KnowledgeHubllt sariya fitter+Helper = 200kg.
Shuttering work- 5 sqm.
Low nhi he. Work productivity.
It is a standard labour productivity, which may change based on labour efficiency..
sir concrete ki labour productivity nahi di.
Ok will check
Source of your presentation??
Practical
@@KnowledgeHubllt ok.. But boss the fact is that no one in the market agrees to this information and contractor may incurr losses.
Moreover, cpwd recommendations are somewhat contrasting from your figures..
It depends upon efficiency of workers. It may change as per efficiency of workers. Like skilled , semiskilled.... It's as per practical experience for reference. Theoretically it may be different.
Sound quality not good
Ok
Sir , it is not do practically, I know I am civil field ,it is not possible for practically 😄
Ekdam bakwas thumbrule bina ground knowledge ka vedeo mt bnao plzzzz....plaster ka btya 10 square meter 1 mason,1 majdur,1lady yani ki 800+500+400=1700
10 sqm. Sq feet m kre to 107 sqt.
Market m rate 13 to 20 h per sqare feet.. 15 average milta h 1500 hi hoga fir bhi kya 👎 rule
It's as per practical rates...it may vary place to place....
@@KnowledgeHubllt Aare Sir 1 Mason minimum plaster 200 square feet krta h chahe jsa bhi situation ho...agr acha ho to 250 sq.feet kr leta Hain...
Ok