How to install a fire-resistant vapour control layer - Partel IZOPERM PLUS FR Product Installation

แชร์
ฝัง
  • เผยแพร่เมื่อ 19 พ.ย. 2024

ความคิดเห็น • 2

  • @rich7123
    @rich7123 3 ปีที่แล้ว +1

    Hi,
    How do you fix the vcl on the head of envelope wall between concrete slab with deflection?
    Usually most vcl stick to the underside of the concrete slab

    • @PartelBuildingSystems
      @PartelBuildingSystems  3 ปีที่แล้ว

      Hi Richard,
      For sealing to concrete, we recommend ECHOSEAL ALU FR to seal against.
      For the underside of the concrete slab, we recommend a seal as you would if you were installing an airtightness membrane onto a wall and turning it up onto a ceiling, this can be folded over onto the ceiling and sealed again with ECHOSEAL ALU FR.
      For further information, please contact technical@partel.com.