Prather deep vee 40” electric first pass
ฝัง
- เผยแพร่เมื่อ 20 ต.ค. 2024
- First pass after conversion from .46 nitro motor to fully electric with leopard motor and 6s on OSE 150a esc.
I was going about 70% throttle and this is after a lot of tuning of the battery placement and trim tabs. First pass the boat did a barrel roll and got stuck upside down.
I originally built this boat in the 1990’s when I was 13-14. I have kept it since always intending to rebuild it and I finally just did with my 5yo son that loves to tinker. This is July 2024 first test.
I have some new battery placement adjustment to do before I can get it back out and attempt a full speed run.