    Hi both The original test certificate was probably done in the van , but again your dogged determination found the problems . Also many would say it complies so they would leave it at that . But not you , spot on work as usual from the dynamic duo . Kind regards 👍

  • @johnwaby4321
    @johnwaby4321 หลายเดือนก่อน +1

    Your both back 👍👍.
    You can't believe how some people leave things 😯😯

  • @MS-Patriot2
    @MS-Patriot2 2 หลายเดือนก่อน +3

    My old Kewtech came with a brown probe that had a test switch on it to trigger the Loop Impedance test. Much easier than the three probes in one hand (there’s rarely room for the earth croc) one hand on the ladder and a nose press on the orange button!

  • @MrDamodee
    @MrDamodee 2 หลายเดือนก่อน

    Welcome back and thanks for posting a full video!! 🙂 I previously commented why these guys always wore shorts, especially in the winter months, with me not being a big shorts wearer......now I totally get it, whenever I can, its shorts for me.....so much more comfortable and if your wrapped up warm up top having bare legs hardly makes a difference. I'm a convert now!!

  • @timothyroper1897
    @timothyroper1897 2 หลายเดือนก่อน +1

    GREAT VID . NICE TO WATCH

  • @fabianmckenna8197
    @fabianmckenna8197 หลายเดือนก่อน +2

    "Show me, show me"..........
    I thought you were going to break into song with the kids from Cbeebies. 😅

  • @Arachnoid_of_the_underverse
    @Arachnoid_of_the_underverse 2 หลายเดือนก่อน +3

    01:30 so they put flip switches in the cupboard where stuff is going to hit them and potentially turn the fridge and freezer off.

    • @finlays-crazy-life
      @finlays-crazy-life 2 หลายเดือนก่อน

      What do you mean

    • @streaky81
      @streaky81 2 หลายเดือนก่อน +2

      They'll be fairly stiff switches.

  • @keiththesparky
    @keiththesparky 2 หลายเดือนก่อน

    Nice to see you both back. How’s ya big build ext coming on?👍🏼

  • @peterandrewwilson976
    @peterandrewwilson976 2 หลายเดือนก่อน +2

    Lovely Kewtech MFT. I love mine.

    • @markpunt9638
      @markpunt9638 2 หลายเดือนก่อน

      Is it made in England out of interest?

  • @slservices6463
    @slservices6463 2 หลายเดือนก่อน +2

    Did you ever find the high resistance joint?..what was issue.

  • @kendevanny4078
    @kendevanny4078 หลายเดือนก่อน

    You failed to mention what and where the high resistance was up stairs. Was it a loose neutral on the multi outlet.

  • @streaky81
    @streaky81 2 หลายเดือนก่อน

    I had a major problem in my new build, particularly in the kitchen, with wires popping out the switches. Wonder if same deal. Maybe when they did it they had it all fine then over time they popped.

  • @lewis94uk
    @lewis94uk 2 หลายเดือนก่อน +1

    How’s the extension coming along?

  • @kanearmstrong2326
    @kanearmstrong2326 2 หลายเดือนก่อน +2

    I know it sounds stupid but was told ok my napit assessment that we should be testing type a rcds on the type ac setting….

    • @MS-Patriot2
      @MS-Patriot2 2 หลายเดือนก่อน +2

      Agree it’s crazy. However, based on amendment 2 of BS7671 he is correct. Too many RCD tests were failing as some sparks couldn’t be bothered to understand their MFTs and select the appropriate settings, so IET (unusually!) simplified it. I did an installation in France recently and the new Schneider RCDs would not operate UNLESS I configured my Kewtech MFT correctly for type A or type AC.

  • @marymadigan9707
    @marymadigan9707 2 หลายเดือนก่อน +3

    Nice welcome back 😂

  • @charliedrake247
    @charliedrake247 2 หลายเดือนก่อน +6

    Bad news who passed this new build.

    • @MS-Patriot2
      @MS-Patriot2 2 หลายเดือนก่อน +1

      The lowest bidder.

  • @Richardincancale
    @Richardincancale 2 หลายเดือนก่อน

    Need to test those socks on 500v setting!

  • @krispy_kornflake
    @krispy_kornflake 2 หลายเดือนก่อน

    this video should be used in court

  • @chas3997
    @chas3997 2 หลายเดือนก่อน

    well done ! it very hard to price these jobs right because the client very often doesnt see beyond * its working* wheres the issue! countless hours can be spent chasing faults that need rectifying and the customer wont pay for! A clause must be written into every estimate to take account of poor unsafe wiring hidden before you attend a job.

  • @supersparks9466
    @supersparks9466 2 หลายเดือนก่อน

    Well done

  • @brianoneill350
    @brianoneill350 2 หลายเดือนก่อน

    Goodan Chris, was getting worried about you

  • @wilbertbirdner1303
    @wilbertbirdner1303 2 หลายเดือนก่อน

    Looks like Thomas Nagy's been there..

  • @r.v.dentertainment2015
    @r.v.dentertainment2015 2 หลายเดือนก่อน +1

    New build electrics are shocking

    • @JasperJanssen
      @JasperJanssen 2 หลายเดือนก่อน

      Absolutely shocking.

  • @jonesconrad1
    @jonesconrad1 2 หลายเดือนก่อน

    Odd socks. meh, I used to order two pairs of air force ones in opposite colours .

  • @charliedrake247
    @charliedrake247 2 หลายเดือนก่อน +4

    New build crap/ dangers

  • @peterandrewwilson976
    @peterandrewwilson976 2 หลายเดือนก่อน

    New build = caution. Testing; dubious, doubtful.

  • @firsteerr
    @firsteerr 2 หลายเดือนก่อน +1

    i number one electricity man , you bad man making me look unskillfully on de you tub
    i make good working electric you not know me papers as me come boat

  • @labelectrical
    @labelectrical 2 หลายเดือนก่อน

    Good to see you back. Are you back for good?