Hi John. . I’m not soldering the track joints as I will be running loco converted to Radio Controlled . The DMU in video is RC controlled. The “ 6 foot “ between lines on my Railway is 70 mm Rail to Rail , there a couple of places where I’ve had to decrease that to 60mm . I’ve tested passing on curves with 2 long Heljan Cargowaggons and they pass easily. Thanks for following.
Maybe brush the concrete with a wire brush and sweep off first? Adhesive will not stick to dirt.
Good Job
Could you give the measurements for the 6’ gap? Are you going to solder wires between track lengths? Great job.
Hi John. . I’m not soldering the track joints as I will be running loco converted to Radio Controlled . The DMU in video is RC controlled.
The “ 6 foot “ between lines on my Railway is 70 mm Rail to Rail , there a couple of places where I’ve had to decrease that to 60mm .
I’ve tested passing on curves with 2 long Heljan Cargowaggons and they pass easily. Thanks for following.