[EXCLUSIVE Weekday Test] SBST NEL ALSTOM Metropolis C851E Sets 7089/7090 And 7091/7092 Testing [PTP]

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ต.ค. 2024
  • Date Taken: 9th June 2023 Friday
    Ever since the version of C851E for the North East Line, I have finally I seen it in person and in real life for sure.
    I tried to plan to catch the sight of C851E being delivered to Sengkang Depot, but due to the timing, it was too late as it arrived around 12 midnight.
    Well I must comment that the Livery paint of C851E NEL Version is looking good and beautiful as the purple represents the line that is gonna operate.
    But, ALSTOM Metropolis C851E is actually the 2nd batch of C751Cs as the interior cabin and the Traction Power Motor is the same.
    With that added, the North East Line trains now has a total of 49 fleets of set.
    As of the refurbishment process for the first generation trains and that's the C751As, it still has to go on as of planned completion until 2024.
    The Refurbished C751As now there are 4 of the sets to be running on the line and that's 7009/7010, 7013/7014, 7039/7040 and last but not least 7045/7046.
    Advertisement pasted only on 7013/7014 with Maplestory Half-Int.
    Another comment about the C851E is that the smell of the cabin interior is like fresh plastic and similar when the C751Cs were being debuted.
    Well, at least the North East Line has something special which is the Refurbished C751As having an LCD screen.
    Cause with the STARIS Map LED red and green lights are to be common on the KHI C151, SIE C651, KNS C751B, KSF C151A, ALSTOM Metropolis C830C And Bombardier C951.
    Editor App Software: Cyberlink PowerDirector

ความคิดเห็น • 28