My dear friends, we need to encourage all projects in our Pakistan. I would request all of my politicians to get the things done after conducting cost and benefit analysis. National interests should be kept higher than all other vested interests.
The mountains look so deserted. Imagine if these mountains had dense forests what look these would have presented. We must try to ban these mountains from overgrazing and regrow them.
Zakeria Zak moderate grazing actually helps as the top layers are eaten the animal waste helps fertilize the hills, what needs to be done is mixed use, fruit trees to be planted with low intensity grazing. In Europe the waste of one process is the input of another process & excess capacity is utilized.
asif khan I understand, but in the summer months or when there is excess water instead of diverting it through a spill way couldnt another penstick be added? for that period?
if you add a penstock to the spill way. the following will also happen 1. new turbines new generators new governors new equipment for the so called spillway unit. and also a neww building for that small unit wich will generate a few mw for a few months... cost is too much. 2. you are compromising the spill way, this particular spillway is designed for 2000 cucics of water,. a surge in river swat will mean the flooding the valuable equipment,. 3. spill ways exits in big hydro powerPlants 3. if someone is efficent then they can make a unit at the sedimentation center,.(200 cucics water is wasted there).
It can't caz spell way is no measured way the amount of water is changing on spell way and for every alternator need a specific amount and specific pressure of water ..so if u installed a pinstock instead of spell way it will be meanless ..spell way unnecessary water egress by spell way
Mashallah mashallah beautiful subhanallah Jazakallah
Billion tree project yahan pr bhi start hona chahyay.
I miss this place
Ma shah ALLAH 👍
ویل ڈن IK
Very Good kpk Hoqumat
Khan😍 he un logo k lea jin k ankhon p patti bandhi hui
I love imran khan n pti n 🇵🇰🇵🇰🇵🇰🇵🇰🇵🇰
Zabr10 video sir
🌹🌹🌹
Well Done kpk
My dear friends, we need to encourage all projects in our Pakistan. I would request all of my politicians to get the things done after conducting cost and benefit analysis. National interests should be kept higher than all other vested interests.
The mountains look so deserted. Imagine if these mountains had dense forests what look these would have presented. We must try to ban these mountains from overgrazing and regrow them.
Zakeria Zak moderate grazing actually helps as the top layers are eaten the animal waste helps fertilize the hills, what needs to be done is mixed use, fruit trees to be planted with low intensity grazing. In Europe the waste of one process is the input of another process & excess capacity is utilized.
It woulbe 81KW rather than 81MW. Although great work by KPK govt.
81 mega watt
en.wikipedia.org/wiki/Dargai
Even i am confused, 81 MW is a hell lot of power but a Head of 110 m is capable of providing but still the mass flow rate seems to be quite low
181m head
Imran Riaz
27 × 3 MW = 81
Ali durrani the flow that you see is from spillway not through the turbine. The guy said 81 MW so why would you doubt him
They need to plant more trees in those naked mountain. Trees are the best sponge to suck up water and it slowly release it back to the environment.
why not add another penstock to generate more electricity when there is extra water instead of diverting to the spillway?
there is a mass shortage of water during winter, during winter the whole power plant produces 11 to 20 MW only..
asif khan I understand, but in the summer months or when there is excess water instead of diverting it through a spill way couldnt another penstick be added? for that period?
if you add a penstock to the spill way. the following will also happen
1. new turbines new generators new governors new equipment for the so called spillway unit.
and also a neww building for that small unit wich will generate a few mw for a few months... cost is too much.
2. you are compromising the spill way, this particular spillway is designed for 2000 cucics of water,. a surge in river swat will mean the flooding the valuable equipment,.
3. spill ways exits in big hydro powerPlants
3. if someone is efficent then they can make a unit at the sedimentation center,.(200 cucics water is wasted there).
hope i cleared it up.
It can't caz spell way is no measured way the amount of water is changing on spell way and for every alternator need a specific amount and specific pressure of water ..so if u installed a pinstock instead of spell way it will be meanless ..spell way unnecessary water egress by spell way
THE Malakand-III hydropower project, having a generating capacity of 81MW electricity,
👍
Search Google for details
اسلام علیکم ۔۔۔۔سکرین بڑا نہیں ہوسکتا ۔۔۔؟
بڑے سکرین پر کوشش کرکے دیکھ لے
Or dam banao molakh bacho Pakistan Zindabad plz
He'2005'm.m.a.ne'bnaya'ta