Master Worker Skills Build Solid Modern Style Building Foundations on Weak Geological Ground

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 ธ.ค. 2024

ความคิดเห็น • 34

  • @oggl60
    @oggl60 9 วันที่ผ่านมา +4

    I am an Arquitect, my name is Oscar and I live in Baja California México, I participate in the construction of building of 10 floors, and we us a foundation like the one on the video, this was on 1998 in Mexicali, in baja California, we found water a seven meters in the excavation, is thee best foundation I ever participate, and we did it in a very seismic zone, and the two buildings perfect, with no cracking or dishevel, until now.

  • @billblock8090
    @billblock8090 หลายเดือนก่อน +4

    Great content, As a 81 year old contractor, I appreciate your work. Also as civil engineer I would like to state a well known fact . The re-bar is to keep the concrete from shifting if it cracks. Proper mix concrete, with fiber, will make great columns.

  • @eddiemuaiava9805
    @eddiemuaiava9805 หลายเดือนก่อน +11

    I think you should've pumped out the water before you laid your sheets down.

  • @Schools-tb3ix
    @Schools-tb3ix 8 วันที่ผ่านมา +1

    Great job
    When having clay with groundwater , the best foundation is raft with strap beams like the one you did

  • @eddiemuaiava9805
    @eddiemuaiava9805 หลายเดือนก่อน +4

    I Agree You've a strong foundation and floor but your pole columns have only 4 rebar, giving it less stability. Your plans sort of don't make sense there should of been at least 12 to each column. If you're having a concrete floor above or roof. Is there no kitchen in this build, no plumbing system, toilets, bathrooms, shower? Water drainage on the side of the building?

  • @melisizwedukuda395
    @melisizwedukuda395 หลายเดือนก่อน +3

    What if u unscrew ur excavator from your wheels because you keep turning unticlockwise.

    • @constructiontech2411
      @constructiontech2411  หลายเดือนก่อน

      Hello - this excavator can rotate both forward and backward.

    • @peterthebricky
      @peterthebricky หลายเดือนก่อน

      Silly question in a condescending tone 😊

  • @franksaga3413
    @franksaga3413 18 วันที่ผ่านมา

    I think you should have pumped out water and cover the entire wet ground by rocks or rubbles before provision of polyethylene sheet.

  • @lecoqchantecom3009
    @lecoqchantecom3009 23 วันที่ผ่านมา +2

    very cool.

  • @JohnByrne-n1d
    @JohnByrne-n1d หลายเดือนก่อน +1

    This has got to be just a rough base coat to keep them out of the muck while they are working

  • @angomsandipsingh
    @angomsandipsingh หลายเดือนก่อน +3

    Strong foundation yet weak columns using only four iron bars in the columns. Precious money has been spent in the foundation vis - a-vis column strength.

    • @constructiontech2411
      @constructiontech2411  หลายเดือนก่อน

      thank you for sharing

    • @oggl60
      @oggl60 9 วันที่ผ่านมา

      I thik that an engineer specialized calculate that

  • @16Galatv
    @16Galatv หลายเดือนก่อน +2

    ❤❤❤❤❤

  • @ngatran544
    @ngatran544 28 วันที่ผ่านมา +1

    Nền đất yếu tại sao k dùng biện pháp móng cọc nhồi cho cứng cáp hơn mà phải nhất thiết là móng bè như vậy. bê tông dày 70cm mà không xây tường bao giữ nước lại để phần nước trong bê tông thất thoát ra ngoài

    • @constructiontech2411
      @constructiontech2411  27 วันที่ผ่านมา

      Chào bạn - trước đây vị trí này là một cái ao sâu khi san lấp đã đổ một khối lượng lớn các tảng bê tông xuống lên bây giờ khi làm nhà ko thể sử dụng biện pháp khoan nhồi hoặc nén cọc bê tông ạ - lên đã phải xử lý chọn cách làm móng bè ạ

  • @oggl60
    @oggl60 9 วันที่ผ่านมา

    It is so much concrete, and it is poor resistance, too much water

  • @ronojpayeng637
    @ronojpayeng637 25 วันที่ผ่านมา

    We don't use this much of iron and we don't make floor like this... Only normal size 12/12 inch beam , 4(16mm) + 2(12mm) is enough (same amount for the posts).. Maybe we spend this much only in the first floor, second floor etc

  • @oggl60
    @oggl60 9 วันที่ผ่านมา

    But we put, before some rocks first, the granitic sand compact at 100 % then the poor concrete, and next the steel, sorry for my English.

  • @단호박-u5o
    @단호박-u5o หลายเดือนก่อน +3

    물에다 집을 다 짓냐?
    몸에 안 좋을텐데

    • @constructiontech2411
      @constructiontech2411  หลายเดือนก่อน +1

      안녕하세요 영상 시청해주셔서 감사합니다

  • @robertbutler8004
    @robertbutler8004 หลายเดือนก่อน +1

    Here in Australia that build would not pass the pub test.

  • @tomre2769
    @tomre2769 18 วันที่ผ่านมา

    2 min in, what is he doing?..

  • @rashidpervaiz3563
    @rashidpervaiz3563 8 วันที่ผ่านมา

    Only waste of money, substandard working.

  • @Goooseff
    @Goooseff หลายเดือนก่อน

    The customer was dupe for money))) It was cheaper to make a foundation on stilts.

    • @James-il5ny
      @James-il5ny 22 วันที่ผ่านมา

      right, waste of money