First of all, I appreciate your time, effort, and dedication to making such a wonderful video, sir. Regarding my inquiry, the information is provided at 7:15 in the video regarding the section beneath the lean concrete. All of this information regarding the percentage of compaction and the layers is not shown on the drawings. How did you interpret this from the drawing?
very informative sir sir, i have a question what is the role of the length of the angle(L) or its on the basis of thickness eg for lapping length, it is 50d
Informative❤👍
thanks for your simply explanation
very informative
Nice vedio
Kindly make more video on shop drawing, Thank you
Make more videos sir 🫶❣️🤗
Sir kindly make video on the design & drawings followed by Qc electrical engineer on a site
thank u
Sir please also make a video on formwork drawing
Please provide video of lap zone in column beam pratical with type
Sir I need this in pdf
Very informative sir
Plz make vedio on how to search job in LinkedIn?
Already done you can check it In channel
Make more videos about reading drawings. Jazakallah
First of all, I appreciate your time, effort, and dedication to making such a wonderful video, sir. Regarding my inquiry, the information is provided at 7:15 in the video regarding the section beneath the lean concrete. All of this information regarding the percentage of compaction and the layers is not shown on the drawings. How did you interpret this from the drawing?
MDD percentage you will get from specs generally it’s is 95%.
Surveyor will do the survey and will mark for layers
@@CivilEngineerAtSite Ok, thank you for your kind response sir
Which ASTM standards are using for structural work ?
Sir I have drawings do you make videos for that
Can I send
Very informative, but you should put it easy, I mean, in urdu, then everyone will understand it easily.
Really appreciated and it is requested to please make more videos about Civil shop drawings from start to end of project.
Thanks
Today will upload for beam. In Shaa Allah. Thank you 😊
@@CivilEngineerAtSite ❤
I have a question regarding Cutting length of bottom bar and top bar developing length is 250mm how its possible plz explain this ?
Or 2350 is round off calculation.
Total depth of footing is 450mm. As per structural calculation 250mm is ok
Sir I need this drawing whould you like to share with me
very informative sir
sir, i have a question what is the role of the length of the angle(L) or its on the basis of thickness
eg for lapping length, it is 50d
Yes calculation on the basis of dia
@@CivilEngineerAtSite ok
What's mean PCC?
Plain cement concrete
@@CivilEngineerAtSite Thanks so much.
Can you send pdf
Sir apna Whatsapp send karay kindly
100-T25-146-200-B-200
It's about reinforcement
Yes it’s details
10cm pcc...not 100
100 mm sorry