New Track and New Control Point: Homer, CA BNSF Needles Sub
ฝัง
- เผยแพร่เมื่อ 14 ต.ค. 2024
- What is likely one of the most significant Class One RR capacity expansion projects in recent years is BNSF's ~30mi. of third Main Track construction between Needles and Goffs, CA on the Needles Subdivision. The final segment of which was completed just before Thanksgiving, 2023. Part of the project included a whole new Control Point at Homer, which features a full set of crossovers.
This clip features what turned out to be a busy Monday afternoon at that new Control Point of Homer (well, the first train is seen down a hill a bit at Arrowhead Junction). A total of 18 trains are seen.
Great video. I have not been to the east end of the Needles Sub since the triple track project began!
Honestly, neither had I before this day! But I'm gonna try and hit it up a few more times this winter.
Looking a little different from my last visit in 2012.
Wow! Excellent video; superlative in every respect. Great action. Too bad you got blocked a couple times; a hazard of railfanning multiple track main lines.
Thank you! Yeah, I did get blocked a few times, but at least it didn't happen for the big Power Move.
What is a good site to track freight trains or to see a trains symbol??