@@shreyass5664Kar Congress and DK wont work instead does only plans and planning. Always He is busy planning Tunnel roads and other useless project planning as listed out below, that too sitting in AC ROOMS. Many projects work are delayed like Widening of Herbal flyover, Koramangala flyovers, Potholes, Widening of Drainage, Buildings water bodies and lakes, etc. This City is a Chaos City with all kinds of haphazard and hazardous ways of development and build 100s of different kinds of CRISIS. The Bangalore was executed by Congress since 60 years of haphazard Governance model. Land mafia, encroachment of Rajkaluve and drainage leads to flooding during rains . Water crisis n Flood crisis Public transport crisis i.e. No Suburban Railways network since 60 years of govt in central govt. Diminishing 2 thousands of Lakes and Parks. Haphazard development n World worst infrastructure in road infrastructure n Many millions of Corruption spoiling and killing the Bengaluru city. Road infrastructure has been completely chaos and messed up in the whole world by Congress party. Need of the hour is 1000s of circles needs Bridges or Subways instead they plans useless tunnels which will messy the traffic issues. Congress ideas are worse . They stopped the higher end infrastructure project like NICE ROAD PROJECT. They even stopped peripheral ring road for 3 to 4 decades . All the projects of CONGRESS projects which are senseless and nonsense as follows: 1. FYI, Metro tunnel connect to entire city. So Tunnel roads are not conducive or not feasible for entire city. Tunnel road is not conducive to one main road as well. whereas entire city road infrastructure is worst of worst. 2. Tunnels roads are meant to use only a few for certain smaller distances and smaller areas . Still it is not feasible to the avoid traffic jams. 3. FYI, Metro Train's tunnel doesn't not create bottleneck in the corner. Unlike Road tunnels manifests choas and messy jams in the corner of the tunnel roads. Tunnel roads creates messy in the tunnel road corners. complete traffic jam in the Tunnel corners. 4. The most Foolish project Skydeck project is completely waste and most Useless project which will increases chaos in the Road and manifests messy jams and Traffic jams. 5. There is highest numbers of one ways roads which indicates the most messed up road infrastructure. 6. There are many more thousands of manifested issues without any feasibility study. One of the Best SOLUTION are: Need to develop new AIRPORT outside Bengaluru. Instead Development a new bangalore n 3 more ring road. Apart from exitsting Satilette rings road. Summary: All the plans of the Congress is manifested chaos in city. Water clogging during rains and highest number of encroachment of patks and lakes in the world. The Congress wants only old bangalore. Why new AIRPORT within Bangalore. the Congress plans to squeeze another 4+ crore population in this same old congested city of Bangalore. Utter nonsense n newsense of ideas of Congress
Any idea how the blue line will be connected with yellow line at silk board??? Will the tracks be connected? Or will the the blue line station be next to yellow line? Or will it be a long skywalk between the two stations??
@@bootup856 yellow and blue line will be connected by a travellator. Initial plan was to construct both blue and yellow line stations next to each other due to high land acquisition cost they decided to construct both separately and connect with the help of travellator 👍
The blue line station will start from over the madiwala flyover to yellow station starting point (the construction has been started last month Aug 24), it means it's not connected directly but there's concourse level for passenger they can have switch line easily
Eagerly waiting for the yellow line to open. Looking fabulous from the top 🤩
BTM layout looks awesome from top
Looks like a urban village
Drone footage is Awsome...
Beutyfull Bengaluru ❤
Best drone shorts bro keep it up ❤ Love from center of india mp
Great , thanks lot , wish I can see for all of Namma metro . Great work
So colorful 💚♥️
Amazing ❤
Nice..looking forward to travel in this line
Very nice! 😊
Nice video 😊👌.
Try to make a video like this on blue and pink it will be very nice to see😊👍
Sure. Have to known when they do the dry run then i can :)
If u get any details like when will nagasandra to madavara line open kindly share
@@shreyass5664Kar Congress and DK wont work instead does only plans and planning.
Always He is busy planning Tunnel roads and other useless project planning as listed out below, that too sitting in AC ROOMS.
Many projects work are delayed like Widening of Herbal flyover, Koramangala flyovers, Potholes, Widening of Drainage, Buildings water bodies and lakes, etc.
This City is a Chaos City with all kinds of haphazard and hazardous ways of development and build 100s of different kinds of CRISIS.
The Bangalore was executed by Congress since 60 years of haphazard Governance model.
Land mafia, encroachment of
Rajkaluve and drainage leads to flooding during rains .
Water crisis n Flood crisis
Public transport crisis i.e.
No Suburban Railways network since 60 years of govt in central govt.
Diminishing 2 thousands of Lakes and Parks.
Haphazard development n
World worst infrastructure in road infrastructure n
Many millions of Corruption spoiling and killing the Bengaluru city.
Road infrastructure has been completely chaos and messed up in the whole world by Congress party.
Need of the hour is 1000s of circles needs Bridges or Subways instead they plans useless tunnels which will messy the traffic issues.
Congress ideas are worse .
They stopped the higher end infrastructure project like
NICE ROAD PROJECT.
They even stopped peripheral ring road for 3 to 4 decades .
All the projects of CONGRESS projects which are senseless and nonsense as follows:
1. FYI, Metro tunnel connect to entire city.
So Tunnel roads are
not conducive or not feasible for entire city.
Tunnel road is not conducive to one main road as well.
whereas entire city road infrastructure is worst of worst.
2. Tunnels roads are meant to use only a few for certain smaller distances and smaller areas .
Still it is not feasible to the avoid traffic jams.
3. FYI, Metro Train's tunnel doesn't not create bottleneck in the corner.
Unlike Road tunnels manifests choas and messy jams in the corner of the tunnel roads.
Tunnel roads creates messy in the tunnel road corners.
complete traffic jam in
the Tunnel corners.
4. The most Foolish project Skydeck project is completely waste and most Useless project which will increases chaos in the Road and manifests messy jams and Traffic jams.
5. There is highest numbers of one ways roads which indicates the most messed up road infrastructure.
6. There are many more thousands of manifested issues without any feasibility study.
One of the Best SOLUTION are:
Need to develop new AIRPORT outside Bengaluru.
Instead Development a new bangalore n 3 more ring road.
Apart from exitsting Satilette rings road.
Summary:
All the plans of the Congress is manifested chaos in city.
Water clogging during rains and highest number of encroachment of patks and lakes in the world.
The Congress wants only old bangalore.
Why new AIRPORT within Bangalore.
the Congress plans to squeeze another 4+ crore population in this same old congested city of Bangalore.
Utter nonsense n newsense of ideas of Congress
What a tragedy to this line that train sets are not available and it will still take a year to reach normal frequency
Any idea how the blue line will be connected with yellow line at silk board??? Will the tracks be connected? Or will the the blue line station be next to yellow line? Or will it be a long skywalk between the two stations??
@@bootup856 yellow and blue line will be connected by a travellator. Initial plan was to construct both blue and yellow line stations next to each other due to high land acquisition cost they decided to construct both separately and connect with the help of travellator 👍
The blue line station will start from over the madiwala flyover to yellow station starting point (the construction has been started last month Aug 24), it means it's not connected directly but there's concourse level for passenger they can have switch line easily
Is it going to start in 2024 or not?
Bengaluru tezi se bar raha hai
Sexy bro 👏