How to Estimate Cement Concrete Road | QSC | [HINDI]
ฝัง
- เผยแพร่เมื่อ 16 ก.ย. 2024
- In this video we will learn about- how to prepare estimate for cement concrete road with measurement sheet & abstract sheet.
Queries Solved:-
1. How to Read Drawing ?
2. Material Quantity calculation
3. Measurement Sheet
4. Abstract Sheet
Previous Video➡️ • Estimate of Painting W...
Bituminous Road Estimate ➡️ • How to Estimate Bitumi...
#roadestimate #ccroadestimate #estimatecosting
Telegram Channel ➡️telegram.me/jo...
Very nice Explain 👌
Awesome explanation esp for non engineers . ........request aap 8 min ki jagah 5 min ke vivdeos banao aur aap dheere bolo XL sheet ko jaldi jaldi PIVOT karo . its possible . Good work ,,,,,,,, Keep it up
Thank you bhai ❤️
Share ur e mail id so that i can ask my questions to you i am a builder . I
@@manojchauhan1010 bhai join our telegram channel
Telegram Channel ➡️telegram.me/joinchat/AAAAAE2G10-taOkPQmap9Q
Can you make a video of the 'Parts to be considered in cement concrete road'?
Sir 100 meter rcc road bnane ka estimate kaise bnaaye.
Or totally kharcha kitna aaega
Superr 👌👌👌
Sir , plz provide us estimate process for use waste tyre in road construction.
agar widh 4.5m se kam hai to Longitudinal joints dene ki jarurat nahi hai na only Transverse joint dene chaiye na
Sir metaled road isse hi bolte hai Kya please reply
Sir can you explain first process of concrete road that is filling tender of road construction
sir if the design mix such as M35 or 50 is to use for extending pavement life , how to work out the mix and lay
Quantity Estimate ka Or V video Updated Kijiye Sir
How do we calculate the Initial cutting of Manually done PQC ?
Super explanation brother...
Industrial area me rcc road banane ka tarika aur kitna kharcha aata hey iski jankari dijiye.
No. Of transverse joints= 2000/10 - 1= 199
2000/10 = 200
No sir ,ali is right
Hello brother please 800 length 15 width ka rate bata dijiye, 800*15=
👌🏻🔥👌🏻🔥👌🏻🔥👌🏻
isme materials ki quantity ki price add hogi kya???
isme to sirf labour work hai .material nahi hai ....
Please give estimate n cost for 2 km Bitumen road,, size of road 2000 m x 5 m,
Is this only the works cost out of material
Sir Rate aap kaise dicide krte h
SOR ka item number bhi batana tha
Sir aap estimate kon se software m bnate ho
Manually banata hu bina kisi software ke
Hi, I want to know from where you have mentioned rate of different materials in abstract sheet as these rates are not mentioned in question. Kindly revert.
Sir could you please make videos in English??
Which is ur country brother???? Do u not understand hindi????
@@MR-mq9pl
OK thank you sir
Can you imagine per meter 13,20,900.00 rate phle hi reject ho jayenge.
सिस्टर, पर किलोमीटर 13,20,900 रेट बताया है सर ने। मीटर का नही।
1 km ka h
Sir I want to have Direct classes... How can I contact with you???
Excel Me Mil Sakta Hai
Can you please tell me tar road cost for 400 meters width 20 feet
Please
16 lacks
Cc road work from ali sah house to ahmad house ward no.7 200*5mtr...............
Results btaiye
Sir ye sheet Kaha par Milegi
250 meter long 7.5 meter wide pcc road with steel please give me a instemate
246.80 m cc road ka estimate kitna banega
Hey im from a non civil Background, just curious as to is the 26 lakh for 2 kms accurate in real life and how much does it cost for bitumen
Nope dear, this isn't accurate I just show you procedure, how to prepare an estimation.
It show less bcs he is considered 600 rs For 1 cubic meter of concrete but in real minimum 4000 rs casting for 1m3. So if you replaced than you get actual estimation.
Correct me if I wrong
Cost of soil consider is very lesser
We need to telugu language
I don't know telugu language
Brother pdf me nahi h ye
Plz send pdf
I have already uploaded on my telegram channel join now
Telegram Channel ➡️telegram.me/joinchat/AAAAAE2G10-taOkPQmap9Q
हम को कंपनी को रेट देने है बहुत je ओ से बात की है उन पर रेट नहीं दिया गाए
Cement concrete ka rate Kam lagaya h aap ne 600 m koi kaise Kar sakta h
Video is blurred..not clear
Bhai hindi main bataye
आप हम को रेट दे सकते हो
आप हमारी हेल्प कर सकते हो
Telegram channel join kijiye aap me aapki help kr dunga
One meter cube concrete is 600… I think u are in mars
सर आप का नंम्बर मिलेगा
Sir. Toda speed Jada h bolne ki aadha smz aata h bs
Dear speed km hoti he TH-cam me. Use kro & sorry for inconvenience dear 😇
Sir Aapka mobile no mil Sakta hai kya
600 रुपय मे तुमे काहासे १ क्युबिक मीटर काँक्रिट मिळता हे
फिर कितना रेट है भाई?
@@yshevkari267 M20 concrete cost
4000 material and 500 labour cost
Sir,
It's absolutely no worth explaining when you explain for yourself only.
Explain anything to let your viewers understand you and your work.
Thank you
Watch first other video which i recommend you then you will absolutely understand