If thickness of WMM is around 300 mm then how will we insure that compaction is done upto full depth ? What are the measures or precautions for that case ?
Why AASHTO mix design? It is not used in India. We follow MS series method and I have uploaded the video on this long time back (Marshall Method of Mix Design).
Dear Sir, very clear presentation, thanks you very much for your hard work for humanity.
Thank you so much. Keep watching
Sir ur videos r very useful and benchmark for site engineers. Lots of thanks.❤
So nice of you. Keep watching
Thank you sir. A video on operation and mixing in pug will be helpful.
OK. Thanks
Thank you so much sir!
Thanks, keep watching
If thickness of WMM is around 300 mm then how will we insure that compaction is done upto full depth ? What are the measures or precautions for that case ?
Lay it in two layers of 150 mm each. Thickness of WMM layer should not exceed 200 mm in any case.
Sir please make one video, AASHTO asphalt mix design
Why AASHTO mix design? It is not used in India. We follow MS series method and I have uploaded the video on this long time back (Marshall Method of Mix Design).
@@SatishIITRok,thank you sir
Thanks sir, one on vertical curve irc sp 23 specially summit and valley curve part.
Ok, noted.
Sir please Hindi me bhi video banaye
कई videos को हिन्दी मे डब किया है मैंने। wmm का ये विडिओ भी हिन्दी मे available है। एक बार देखे
th-cam.com/video/rXfC9ja8bgg/w-d-xo.html