your tutor is nice!. we can add different size of bar weight together?
their costs and purpose are different. Revise it again
I think there will be deduction of 2*d bend at 40 d near the bent up bar of Column Continuing into the slab and same at the footing
muze 1 doubt hai sir 135 degree per 3d lete hai to 10d kyu liya
Y se @ se T etc. What means sir
D.L at the bottom end =16d=d is the dia of longitudinal bars
16×25mm=400mm
300mm I am confused
Please. teacher clearify that
❤❤❤
Sir, Why didn't you subtract 2 bends in the cutting length longitudinal bar ? Can anyone explain it to me
(12+12+60)
12 dia of footing bar and 60 is the dia of clear cover till that i know after that there is another 12 also there na from where it is coming (ei 12 ) plz tell me someone
It is because we have 12 mm bars in both L and B direction. There for deduct both, I.e (12+12+60)
95kg steel use for one column
Sir why you added 12 two times in first step of finding length of longitudinal bars, isn't it be -(12+60) ?
Weight of longitudinal bar ... diameter 12 square why not ?
40d = (40*25) where does 25 comes from??
The footing bar are 12mm
The (4) longitudinal are 25mm (he stated verbally)
And the lateral ties are 8mm
40d =40X25 ? .. WHAT IS THE 25 ?
I made 800 likes 😛
Longitudinal bar size is 25mm or 12mm
I enjoyed your lesson but you are being too fast and not being an Indian speaker the ascent is difficult for me to understand. Thank you 🤝
Why 12 is added 2Nd time again
We don't need to add the top cover because that's included in development length (40d) from top side
Length of longitudinal bar will be equal to {height of column from footing bed upto bottom of slab i.e 4m - (bottom cover + dia of transverse footing bars i.e 2x12) + Total development length (top + bottom)}
Reply me sir
Steel wastage calculation add for 3% ur using 5% it's wrong