Firewall Forward. Sling TSI Build Update
ฝัง
- เผยแพร่เมื่อ 14 เม.ย. 2024
- Firewall Forward progress made on the Sling TSI experimental kit built aircraft build. Oil Lines, fuel lines, aramid braided PTFE fuel and oil lines, use of fire sleeve and heat shield.
Amazon links to products discussed in this video
Loctite 648 for fuel selector screws
amzn.to/3JnnLOJ
Hole finder
amzn.to/3TY3l3x
Fire Sleeve - There are various sizes and colors, this is an example
amzn.to/4d1sS4z
Heat Shield for cooling hoses - There are various sizes listed here
amzn.to/3TYyF2i
Heat Shield for Fuel Lines - Various sizes listed, make sure you pick the correct option
amzn.to/3Ui68G7
Thank you for the details and great summary of the progress!
Thanks for watching, I always hope it’s helpful to others.
That oil drain when you put the lines on is a bit of a surprise... I made a nice mess on my floor. :D
Well at least I’m not the only one.
I am using the same fuel and oil line setup as you are. My build is just a bit ahead of yours now. Looking forward to seeing another TSi flying in the Carolinas soon. I’m hoping mine will be done with testing and spending time at KAIK by late September. Keep the great videos.
I was based at S17 prior to my current house, not too far from KAIK. Good luck with the build.