NSMRS - Manual Startup, Shutdown Failure and Pressure Stall speedrun

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 พ.ย. 2024

ความคิดเห็น • 3

  • @tgs1536
    @tgs1536  ปีที่แล้ว

    “With the building pressure released and the thermal runaway stopped, the LICER is deemed inoperable due to the severe thermal damage to the superstructure. The facility itself requires extensive repair as multiple systems succumbed to the facility grid surge. Despite all this, you’ve managed to stop a potentially catastrophic accident in the nuclear industry.”

  • @tgs1536
    @tgs1536  ปีที่แล้ว

    correction: i completed the EPSP about 50 milliseconds longer then the time on the top says. (1:13.01)

  • @abstractthing
    @abstractthing ปีที่แล้ว

    sup friend