There is little mistake in PF calculation, i will correct the same in next part of video. I hope this video helpful to all qs, costing & estimation engineers.
But PRW(peice rate work) contractor price is 300rs per cubic meter but in calculations you showed as per cpwd is far more how is it possible plz explain
Thank you for such detailed description of rate analysis. If possible, can you make same rate analysis for DBM and BC work? As different material components like LDO, Bitumen, Huge consumption of diesel/petrol are involved in bituminous work.
What is the basis to select no. of Transit mixers? How can we calculate the length of pipeline required for concrete pump? How do we select which type of tower crane to install?
hi, I am a working Civil Engineer and my Main role is in QS and Contracts, I am still learning things so is it possible that you can share these data sheets in excel format.?
Sir ji bridge design kese krte h kitna load carry kr skta h agr ho ske to ek video is pr bi bnana kyoki hme pta hi nhi h ki every steel bar provide krne pr kitni load carrying strenght gain kr leta h column slab etc please sir ek video jarur bnana
Sir Contractor using cement 105kg/cum for PCC Concrete (1:4:8) but in CPWD cement consumption is 170 kg/cum that is less. How to make new analysis of rate for contractor payment if tender rate is 4000Rs/cum?
Sir, only 2.5 % considered in over head cost and indirect cost(plant and machinery ) you have considered.but how can you bifurcation this over head 7.5 %.
Sir Contractor using cement 105kg/cum for PCC Concrete (1:4:8) but in CPWD cement consumption is 170 kg/cum that is less. How to make new analysis of rate for contractor payment if tender rate is 4000Rs/cum?
There is little mistake in PF calculation, i will correct the same in next part of video.
I hope this video helpful to all qs, costing & estimation engineers.
PDF plzx gauravsinha1234@gmail.com
Pf is 12 and esi is 4.75% on labour part. Flyash cost not shown. Rest is good
But PRW(peice rate work) contractor price is 300rs per cubic meter but in calculations you showed as per cpwd is far more how is it possible plz explain
Thank you for such detailed description of rate analysis.
If possible, can you make same rate analysis for DBM and BC work? As different material components like LDO, Bitumen, Huge consumption of diesel/petrol are involved in bituminous work.
Great lecture sir, it helps alot even after having 6 years of experience.
Real Engineer....awesome👑
You are superb in explaining.great work.every aspect has been covered by you.
Excellent explanation with all required data great sir keep it up
Sir bohot hi aacha analysis h
Thanks a lot , very deeply explained.
Sir nice it is helpful for fresher.
Sir you are great 👍 👏
Very Nice and informative video.
Wonderful video, great content
Sir your great ...
What is the basis to select no. of Transit mixers? How can we calculate the length of pipeline required for concrete pump? How do we select which type of tower crane to install?
You have considered manpower cost in salvage value of equipment. How does this work?
hi, I am a working Civil Engineer and my Main role is in QS and Contracts, I am still learning things so is it possible that you can share these data sheets in excel format.?
Great, Guru ji
Nice explanation sir👍
Narayan Bless 🙏 You
Sir,if we are purchasing concrete from outside vender how can we calculate.
Sir in in-direct cost what about Plants erection charges, civil structures of foundations for batching plant, and weigh bridge ?
Sir ji bridge design kese krte h kitna load carry kr skta h agr ho ske to ek video is pr bi bnana kyoki hme pta hi nhi h ki every steel bar provide krne pr kitni load carrying strenght gain kr leta h column slab etc please sir ek video jarur bnana
Please clear me about the labour constant from where you take..
Thanks sir
Thank You Sir ...
If company already have equipments and machines and it is used in multiple projects then then how to consider their cost
Good sir
Sir, if possible please make a video on construction project budget 🙏🙏
Sir iske phle wali video ki excel sheet provide krwa dijiye plz
Can you clarify the weightage of steel : concrete in RCC structure which one is higher weightage..
Sir what are the codes I need to rate analysis ??
All type Admixtures available ,Mixing method admixture at site in RMC, Ply make Vedio on this topic
sir labour productivity kaha se dekhe
Sir muje Puri billing sikni he...send me link...
Sir, It is much helpful if you share Excel sheets of these data.
Good excelent sir sir muje apni membership main add kar lein plz ... main pakistan se hon engineer hon apka bohat bara fan hon plz
Sure
Thanks
Rate Analysis: Have you missed carriage of materials or loaded it with its basic rates?
👍
Ye labor ki jo cost lete ho wo cpwd me kaha milegi?
Sir Contractor using cement 105kg/cum for PCC Concrete (1:4:8) but in CPWD cement consumption is 170 kg/cum that is less. How to make new analysis of rate for contractor payment if tender rate is 4000Rs/cum?
Sir, only 2.5 % considered in over head cost and indirect cost(plant and machinery ) you have considered.but how can you bifurcation this over head 7.5 %.
Site engineer ki interview videos dijia
Sir ,PF should be 13% in Contractor scope,why 4.25% is considered.
Yes that is mistake, i will correct in my next video part.
1st viewer
Sir,can i get excel sheet
Sir plz shear video excelsheet
Hello sir
Pls send this rate analysis sheet sir plsss..
Kindly send the excal sheet
Please send rate analysis sheet
Sir Contractor using cement 105kg/cum for PCC Concrete (1:4:8) but in CPWD cement consumption is 170 kg/cum that is less. How to make new analysis of rate for contractor payment if tender rate is 4000Rs/cum?