I think the bottom shell thickness is 10mm. 7 tons maximum if the shell height is 2.5m . every 3 m circumference a chain block. total weight of the tank 25 tons. 5-ton chain block. 10 numbers. you can do it.
Hi mate, I have another question. I wanted to copy your system to @9000 mm diameter similarly but pipe length' 4000 and 3600 mm is too large for me. Actually, what's the diameter of tank on this video? I have to use smaller length and maybe smaller size of pipe, I need your explanation and help, please
Bro. Divide the total weight of the tank, excluding the bottom plate weight, multiply by 1.5, this is for the safety factor. How many number of Chaninblocks you have. All chainblocks, shall be of equal capacity. The capacity of the chain blocks shall be more than the SAFE WEIGHT OF THE TANK. distance between, 2 chain blocks shall be less than 3 meters. The length of the poles, depends the width of the shell plates. Recently, i had seen a video in youtube, a group of workers, I think they are from Thailand or Malesia, using the same method. Please search in the youtube, if i see that video again, i will send you the link. Keep in touch. Thank you.
@@technicalstudies. Thank you so much for this valuable information. 'The length of the poles, depends the width of the shell plates.' I have to solve this issue now. Thanks a lot for your advise, I have started to search it.
@@kenanermumcu7271 Please consider. Maximum plate width. Height of the elevator. Where you hook the chain block hook, on the plate. clearance for the chain block and the top of the curb angle. You can leave the roof plates open, where the chain blocks are located. Thank you.
It deopends the weight of the tank. total weight minus bottom- annular weight. capacity of the chain block. minimum spacing between chain blocks must be less than 3 m. Add 20% extra lifting arrangement for safety factor.
@@technicalstudies. I am sorry but I didn't understand exactly the point about the space between chain blocks. Spacing is no more than 3 m between 2 chain blocks, is it true?
@@technicalstudies. Well dear if you contracted let's say 10 tanks than this is the right method to go with cost wose, for 1 or 2 tanks the jacking system asset cost is very high
Superb good job 👍👍
Thank you.
Good job
Thank you.
Very good videooo
Thank you.
Hey the reason for the moon plate ?
to prevent, bending the shell plate, during lifting.
This application for any diameter or small diameter only ?
small and medium. Larger tanks, difficult.
@@technicalstudies. which class is in Ø9000 mm diameter * 9000 mm height tank? Where can I learn to clasify these tanks as small, medium and larger?
@@kenanermumcu7271 Medium
I think the bottom shell thickness is 10mm. 7 tons maximum if the shell height is 2.5m . every 3 m circumference a chain block. total weight of the tank 25 tons. 5-ton chain block. 10 numbers. you can do it.
Hi mate, I have another question. I wanted to copy your system to @9000 mm diameter similarly but pipe length' 4000 and 3600 mm is too large for me. Actually, what's the diameter of tank on this video? I have to use smaller length and maybe smaller size of pipe, I need your explanation and help, please
Bro. Divide the total weight of the tank, excluding the bottom plate weight, multiply by 1.5, this is for the safety factor. How many number of Chaninblocks you have. All chainblocks, shall be of equal capacity. The capacity of the chain blocks shall be more than the SAFE WEIGHT OF THE TANK. distance between, 2 chain blocks shall be less than 3 meters. The length of the poles, depends the width of the shell plates. Recently, i had seen a video in youtube, a group of workers, I think they are from Thailand or Malesia, using the same method. Please search in the youtube, if i see that video again, i will send you the link. Keep in touch. Thank you.
@@technicalstudies. Thank you so much for this valuable information. 'The length of the poles, depends the width of the shell plates.' I have to solve this issue now. Thanks a lot for your advise, I have started to search it.
@@kenanermumcu7271 th-cam.com/video/08oVvdZoGoY/w-d-xo.html
@@kenanermumcu7271 Please consider. Maximum plate width. Height of the elevator. Where you hook the chain block hook, on the plate. clearance for the chain block and the top of the curb angle. You can leave the roof plates open, where the chain blocks are located. Thank you.
Please watch this video.
Can we used for 34 dia and 12 m length?
It deopends the weight of the tank. total weight minus bottom- annular weight. capacity of the chain block. minimum spacing between chain blocks must be less than 3 m. Add 20% extra lifting arrangement for safety factor.
@@technicalstudies. I am sorry but I didn't understand exactly the point about the space between chain blocks. Spacing is no more than 3 m between 2 chain blocks, is it true?
@@kenanermumcu7271 spacing between 2 chainblock shall be 2.5m to 3 meters.
Regardless of the weight of the tank. for safety matter
How to calculate the starcage plz send me video
th-cam.com/video/GEtN93pkXFE/w-d-xo.html
Hi sir, I think this method will be costly then hydraulic jack method.
Why?!
No Bro. Cost of the Jacks are very High.
@@technicalstudies. Thank you. I got it
@@technicalstudies. Well dear if you contracted let's say 10 tanks than this is the right method to go with cost wose, for 1 or 2 tanks the jacking system asset cost is very high
I think that procedure for small diameter
I used this method to erect a 24m dia tank.
Hi
hai