Pile Reinforcement work. See what happen at the last.

แชร์
ฝัง
  • เผยแพร่เมื่อ 6 ก.ย. 2024
  • - Minimum vertical reinforcement in bored cast-in-situ piles shall be four 13 mm dia bars and embedded at least half of the pile.
    - Reinforcement should be assembled and and tied together and should be placed in the piles as a unit before the reinforced portion of the pile is filled with concrete.
    - When hollow stem auger is used to install piles, the longitudinal steel reinforcement should be placed through ducts in the auger prior to filling the piles with concrete.
    - All pile reinforcements should have a concrete cover of not less than 65 mm.