ACE Fort Lauderdale BIM Session 2023-03-08

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ธ.ค. 2024
  • Watch the Video and Answer the 8 Questions Below:
    1: What does BIM stand for:
    A) Building Improvement Model
    B) Building Improvement Module
    C) Building Information Model
    D) Building Information Module
    2: Which one is an advantage of BIM:
    A) Schedule Improvement
    B) Reduction of Cost
    C) Design Flexibility
    D) All of the above
    E) None of the above
    3: Certification is required to operate in a BIM process.
    True
    False
    4: How many Level of Details are there:
    A) 3
    B) 5
    C) 7
    D) 4
    5: Which Level of Detail has the most detail:
    A) Level 300
    B) Level 400
    C) Level 500
    D) Level 600
    E) Level 700
    6: Which software is used to detect clashes:
    A) Revit
    B) Navisworks
    C) SketchUp
    D) Trimble
    7: How many men are required to run a Robotic Total
    Station:
    A) One man on the controller and one man on the robot
    B) Two men on the robot
    C) Does not require anyone
    D) One man on the controller
    8: Which one is not a hardware you would take into the
    field:
    A) Drones
    B) Virtual Reality
    C) Robotic Total Station
    D) Augmented Reality
    Extra Credit:
    What is the brand and model of the drone on the slide?

ความคิดเห็น •