Thanks Joe ,, I prepped everything today and the tower is ready to pull up Just waiting on the boom truck guy to give me a date . Probably still two weeks 73’s
They’re pretty small in diameter And they’re really hard Specifically for steel So I’m not worried It’s thick heavy duty schedule 40 water pipe . Thanks for stopping by 👍 It was a lengthy project but very educational as well I learned a lot
Nice work!
Thanks Joe ,, I prepped everything today and the tower is ready to pull up
Just waiting on the boom truck guy to give me a date . Probably still two weeks
73’s
Very nice!.that is exciting. Look forward to making contact when that dx rolls in@@Dallas-Rife-UDX-347-Tennessee
That will definitely work!! Good job!
That’s some Wv Hillbilly engineering that we both learned growing up together 🤣
@@Dallas-Rife-UDX-347-Tennessee yes it is!!
Looking good Buddy…I’ll take that ant, I’m on SSI
I bet you would 🤣🤣🤣
Do you want me to send this FedEx or USPS 🤷🏼♂️.. I mean I’m not gonna use it anyway
Whichever is the most inconvenient for you will be fine!
#suckitMP
Looks Good!
Thanks Chris 👍
You're welcome!@@Dallas-Rife-UDX-347-Tennessee
Ingenuity,👍 Nice
Thank you 👍
nice
Thanks Mark ,, one step closer 👍🏆
Thats pretty good for using a band saw. I could never cut tube long ways on a band saw. Its looking good Dallas.
Thanks JG ,, but trust me ,, the longer cuts were crooked as well , I cut out the
“good enough” pieces for this project!
I would think that putting those screws right there would weaken the mast
They’re pretty small in diameter
And they’re really hard
Specifically for steel
So I’m not worried
It’s thick heavy duty schedule 40 water pipe . Thanks for stopping by 👍
It was a lengthy project but very educational as well
I learned a lot