Did I Just WASTE $50,000?! (30x40 Shop that I CAN'T Use!)

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ส.ค. 2023
  • I did everything right and they still tried to shut me down! I'm expanding my woodworking business FINALLY and theses are the issues I've had so far. Check out the shop update as well as an impromptu shop tour!
    www.burnstockdesign.com
    xTool discount links below, check em out!
    P2:
    www.xtool.com/products/xtool-...
    uk.xtool.com/products/xtool-p...
    F1:
    www.xtool.com/products/xtool-...
    uk.xtool.com/products/xtool-f...
    D1:
    www.xtool.com/products/xtool-...
    uk.xtool.com/products/xtool-d...

ความคิดเห็น • 917

  • @marceaton3128
    @marceaton3128 9 หลายเดือนก่อน +180

    Sounds like a good time for a back up generator for the shop and house.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +13

      Yea, starting to seem that way.

    • @yellotang
      @yellotang 9 หลายเดือนก่อน +5

      Unfortunately, backup generation is very expensive to run.

    • @Hogger301
      @Hogger301 9 หลายเดือนก่อน +1

      Always a negative.🤞

    • @wilburrrrr742
      @wilburrrrr742 9 หลายเดือนก่อน +12

      Yeah, but backup power generator is a good investment. It will be there after the utility company gets their shit together so it's not a loss, and you can run your AC.
      Mine is dual fuel so it runs on gas or propane. I love it.

    • @keithproctor5559
      @keithproctor5559 9 หลายเดือนก่อน +5

      Solar Ecoflow Pro is awesome.

  • @edwardhappe802
    @edwardhappe802 9 หลายเดือนก่อน +142

    Once again, the red tape and incompetence of the bureaucracy screws the citizen. Kudos to you for refocusing and overcoming the adversity. Love your videos, please keep them coming.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +7

      Thanks!

    • @christopherpardell4418
      @christopherpardell4418 8 หลายเดือนก่อน +11

      Its not the bureaucracy. Its the Privately Owned, for Profit Power company. That, or its that crappy contractor who specified the wrong things in his design only to have the power company tell him what was really needed.

    • @999benhonda
      @999benhonda 8 หลายเดือนก่อน +8

      It's not bureaucracy, it's capitalism. All these smaller utility companies worry more about investor shares than providing service. There's a parts shortage? That wouldn't be a problem if they didn't wait until the last minute to replace old equipment. My parents ran into a similar situation with a water company...it took 5x as long as it should have for them to run a line and what should have cost less than $1,000 was over $3,000. Utility companies know people don't have a choice.

    • @MacNeilR
      @MacNeilR 7 หลายเดือนก่อน +5

      Nope, not bureaucracy or red tape, it's just not in the interest of the Privately Owned, for Profit Power company.

    • @christopherpardell4418
      @christopherpardell4418 7 หลายเดือนก่อน +2

      @@MacNeilR Really? It’s not in the interest of the for-profit power company to have a customer that will use even MORE power they can bill him for? Do you even understand how power companies make their money?

  • @chuckfalgout9596
    @chuckfalgout9596 9 หลายเดือนก่อน +77

    As an electrician, the only concern I would have is the length of the run of your 10/3 and potential voltage drop, especially in this Louisiana heat. I saw when you fired up the saw that your bay lights dimmed. Just don't go crazy and turn on too many things at once. I ran my house like this after for a few days after Ida until I get could get the generator wired in properly.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +6

      Thanks! Ida was a bear

    • @dougdiplacido2406
      @dougdiplacido2406 9 หลายเดือนก่อน +2

      It is only temporary until he gets regular power.

    • @opinionatedman
      @opinionatedman 9 หลายเดือนก่อน +10

      That was my immediate concern as well. I think he said 400 foot of 10/3. Throwing a motor of a table saw and the dust collector running, plus lights and maybe fans due to heat with no AC, decent amp draw over long distance. Low voltage can damage things, especially if "temporary"is half a year or more. I feel for him though. We got this nonsense with our PoCo as well. You can do everything right and stay ahead and then they do whatever they want. We tend to avoid dealing with them as much as possible. I transfer services, do my own disconnects and reconnects, anything to avoid having any dependency on them. They'd be late to their own funeral.

    • @flashbazbo694
      @flashbazbo694 8 หลายเดือนก่อน +15

      So, "Mr electrician", no problem with the 40a feeder breaker on 150'+ of 10ga ? , NM run exposed ?, Undervolted /overheated electric motors ?What a joke, save the "as an electrician " moniker for after you've actually learned the trade.

    • @chuckclark6162
      @chuckclark6162 8 หลายเดือนก่อน +10

      ⁠@@flashbazbo694
      I agree. That’s some janky, dangerous “work around”.

  • @StillLivinginthewoods
    @StillLivinginthewoods 9 หลายเดือนก่อน +65

    This is why I always install the box on a pole, instead of the house or building.
    Then the only things that has to pass code is the pole and the box,... and everything else can be connected after the inspectors leave.

    • @LukePighetti
      @LukePighetti 9 หลายเดือนก่อน +4

      Can you walk me through this? I want to understand better. Thank you.

    • @StillLivinginthewoods
      @StillLivinginthewoods 9 หลายเดือนก่อน +17

      @@LukePighetti If the main breaker box is mounted to the house or building, then the electric company will inspect the box and all the wiring connected to it before connecting the power. Everything will have to meet code.
      But if the main breaker box is mounted to a power pole, like the ones commonly used on manufacturer homes, and it's not connected to anything else,.. all they will inspect is the pole and the breaker box to meet code. Then after they have connected the power, you can connect everything else as you see fit...... up to code, of course. I would never suggest that anyone do anything illegal, unsafe, or that circumvented code.
      This will generally require having two separate breaker boxes. Again, just like a manufactured home.
      ***Again, I am not in anyway suggesting that anyone violate safety codes or the law. If in doubt, find someone who knows what they're doing or pay a professional.***

    • @LukePighetti
      @LukePighetti 9 หลายเดือนก่อน +3

      @@StillLivinginthewoods thanks for the tip!

    • @cgschow1971
      @cgschow1971 8 หลายเดือนก่อน +6

      This is the way old farms were wired. The poco's service ended on a pole central to the house, barn, and other oitbuilings. The meter and disconnect were mounted on the pole and wires spiderwebbed to the various buildings with their own disconnects and subpanels.
      All the wires after the meter pole belonged to the customer.

    • @davepillow8478
      @davepillow8478 18 วันที่ผ่านมา

      I just discovered your channel. I’m glad I did. Thanks for sharing your ideas. It sucks that you had to go through all this crap. Been there done that. I lived in California for most of my life, I finally got smart and moved out of California to take land of the free. I’m looking forward to seeing more of your videos

  • @mattwoods7846
    @mattwoods7846 8 หลายเดือนก่อน +33

    You should be using 6ga wire for that distance and the 40A breaker. The larger wire will stop the lights from dimming when the equipment is first turned on.

    • @danielpopa8728
      @danielpopa8728 8 หลายเดือนก่อน +5

      I suport your comment. Biger dimension of wires or compensetion transformer.... after no more voltage drop.

    • @Happy11807
      @Happy11807 8 หลายเดือนก่อน +8

      RETIRED ELECTRICIAN HERE,DEFINITELY WOULD HAVE USED 6/3with ground! FOR THAT LONG OF RUN !

    • @M.TTT.
      @M.TTT. 8 หลายเดือนก่อน +5

      Thats why you turn the lights off when you run heavy draw equipment LOL

    • @jamesjacobs-sj2il
      @jamesjacobs-sj2il 7 หลายเดือนก่อน +1

      @@M.TTT.Lmao

  • @richardpogue4959
    @richardpogue4959 9 หลายเดือนก่อน +57

    As an Electrician, I approve this message!!! Congrats on the new shop can’t wait to get mine built.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks!

    • @jeffeverde1
      @jeffeverde1 8 หลายเดือนก่อน +4

      Seriously? 150' of 10/3 NMB, with the expected motor loads, run either in the open like an extension cord, or direct buried, and it's going to be in service that way for 6 months, and you consider that "Electrician Approved"?
      Ignoring the improper cable routing between the building and the pole, at the least he should be using 6 ga to deal with the significant voltage drop he's seeing due to the long' run. That will help with the undercurrent condition he's seeing when powering on the saw and DC.

    • @richardpogue4959
      @richardpogue4959 8 หลายเดือนก่อน

      @@jeffeverde1 it’s temp power to get him through until he can get final approval it obviously will work for the time being so get off my sack

    • @flashbazbo694
      @flashbazbo694 8 หลายเดือนก่อน +3

      Richard, you obviously are at best, what we electricians refer to as a romex jockey...
      Learn the trade first, then comment.

    • @jeffeverde1
      @jeffeverde1 8 หลายเดือนก่อน +2

      @@richardpogue4959 half-ass attitude that probably matches the quality of your work. Ignoring the 150' of NMB being left continuously energized and exposed for 6 months, the voltage drop is hard on the motors of his expensive tools. Not to mention the effect of low voltage on the electronic control of the SawStop's saftey mechanism. And since you're an Electrician who's watching a woodworking video, I assume you understand that the low voltage to his table saw will cause the motor to bog on hard or thick stock, greatly increasing the risk of kickback.

  • @DordoArizona
    @DordoArizona 9 หลายเดือนก่อน +28

    If the length from house panel to shop panel is 400 feet, and the wire size for that circuit is #10, you need to limit yourself to 10amps max. The wire is very under sized a cannot handle a 40amp load (wire size for a 40amp 400’ run is #4 copper). Overloading the circuit will cause a voltage drop which will lead to the wire getting very hot (think of a toaster coil) and your tools burning up. That’s why your lights are dimming (in rush of the tools motor) you may want to down size that 40amp breaker to a 10amp instead to prevent and more current than that wire can handle.
    Be careful.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +4

      I'll have to consider that, thanks for the comment!

    • @jeffeverde1
      @jeffeverde1 8 หลายเดือนก่อน +4

      @@burnstockwoodworking If you put a voltmeter on the circuit and watch when the saw powers up, I'd bet you'll see the voltage dip down towards 100volts - which is damaging to the motor. This voltage drop will also affect the power of the saw -- I'd leave the dust collector off when cutting any hardwood or thick stock. And if you plant to be working this way for the next 6 months, you really should replace that 10/3 cable with at least 8gauge. Also check the conductor size for the run between your main panel and that service post. It should be at least a 6gauge.

    • @flashbazbo694
      @flashbazbo694 8 หลายเดือนก่อน +1

      ​@@jeffeverde18ga/6ga are nowhere near adequate. He'd be lucky to get 100v...
      An overheated, arcing motor surrounded by sawdust is a recipe for disaster.

    • @jamesjacobs-sj2il
      @jamesjacobs-sj2il 7 หลายเดือนก่อน +4

      @@burnstockwoodworkingLmao, don’t forget that on a branch circuit you only get 80% of the amp rating as well. So now you’re down to 8 amps. Go pull the proper size wire to accommodate the voltage drop and please understand that #10 wire is only rated for 30 amps. 350$ on wire or a BURNED DOWN BUILDING AND USELESS TOOLS WITH DAMAGED MOTORS??

    • @ronblack7870
      @ronblack7870 หลายเดือนก่อน

      @@jamesjacobs-sj2il THHN wire will withstand 40 amps no problem even says that in the NEC codebook. except you are only allowed to fuse/ breaker protect it with 30 amps max. don't know what is inside your romex . the wires should say somewhere if not on the romex.

  • @forafreeamerica767
    @forafreeamerica767 9 หลายเดือนก่อน +42

    Since it's going to be 6 months I would be looking into solar or wind power or combination of both, just as a FU to the power company.

    • @esmysyield2023
      @esmysyield2023 8 หลายเดือนก่อน +2

      Well the thing about that is if you go solar you have to pay the electric company a service fee. Not a joke. Its like that in several states. There is no such thing as free power in this country. They will find a way to get you.

    • @forafreeamerica767
      @forafreeamerica767 8 หลายเดือนก่อน +1

      @esmysyield2023 so you have to pay them to keep the electricity off, so if you don't pay your bill do they turn it on ?

    • @court2379
      @court2379 7 หลายเดือนก่อน +1

      ​@@esmysyield2023You need to understand you are paying for a service still. You are talking about grid tied solar. There is little or no storage on the power grid. When it gets dark, they are providing you power. That requires staff, a power plant, fuel, etc. Costs. They have to cover those costs. It doesn't matter if you provide enough power to cover what you used. You still used a service and so charge you for it.
      Go fully off-grid if you don't like that. Then you pay for the cost of that after dark power directly.

    • @court2379
      @court2379 7 หลายเดือนก่อน +1

      I am guessing they are charging outrageous fees to get this power. 20K or more. Tell them to pound sand, and put in your own power system.
      You could do this two ways. Run your whole shop permanently off the 40A line, but install a battery bank and charger/inverter. Your average use is unlikely to tax that 40A line. The battery provides the extra amps needed when running bigger motors. But they usually run for shorter durations so you don't need an enormous battery bank to give you full output of the tools for a few hours.
      The other option is to go fully off grid with solar. The install will cost a bunch more. Particularly because the battery would need to be far larger and you have panels to buy. You can get the federal 30% rebate on it though.

    • @branchandfoundry560
      @branchandfoundry560 6 หลายเดือนก่อน +1

      It'd take a helluva wind turbine and battery bank to run a shop and you better live on a mountain top to have sufficient wind...I've looked into it for my mountain top home in Blowing Rock, NC where it's ALWAYS windy. Spoiler--it wasn't feasible.

  • @StefanRandall
    @StefanRandall 8 หลายเดือนก่อน +16

    As somebody that works for a contractor, I get it. That’s absolutely ridiculous to get that runaround, power to ya for finding a solution.

    • @SegoMan
      @SegoMan 2 หลายเดือนก่อน

      That's why you videotape all interactions..

  • @onlineconsumer4796
    @onlineconsumer4796 9 หลายเดือนก่อน +23

    If that was a main electrical panel that you are now using as a sub-panel, you need to check to see if you have the ground and neutral bonded.

    • @mxslick50
      @mxslick50 8 หลายเดือนก่อน +3

      And remove that bond!! In a sub panel, grounds and neutrals MUST be seperated, or it will create a serious shock hazard.
      Oh, and the 10ga wire on a 40 amp breaker is a serious Code violation, max ampacity for 10ga is 30 amps. Plus with that long of a run there is serious voltage drop.

    • @jackthomas2051
      @jackthomas2051 20 วันที่ผ่านมา

      Buy a generator. It’s cheaper than replacing everything.

  • @BUFFALO1946
    @BUFFALO1946 9 หลายเดือนก่อน +20

    Congrats on your ingenuity to get enough power to operate.
    The only thing I see that you are going to need to overcome (after your small shop) is no to get lost in that beautiful space.
    Congratulations on building your dream.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +5

      😂😂 it is hard to get used to for sure! I've NEVER had a space this large, especially for woodworking only

  • @gilpincharles
    @gilpincharles 9 หลายเดือนก่อน +16

    The power company didn't want to make it happen within a reasonable timeline. Glad to see you had the fortitude to find a way and do it yourself.

  • @throws56
    @throws56 7 หลายเดือนก่อน +5

    As someone who works for the power company, I completely understand. Make calls to the call center, if they have a regulating body (PSC is ours in NYS) threaten to call them and then actually call them if you still dont get anywhere. That usually gets things moving.

  • @Hjfvvdst
    @Hjfvvdst 8 หลายเดือนก่อน +10

    Be careful. The dimming of the lights is voltage drop. Voltage drop can and will burn up stuff. 400 ft needs about a #2 wire size.

  • @wizzarin424
    @wizzarin424 8 หลายเดือนก่อน

    I'm kinda in the same boat, I got a extension going from the house to the my shop, and when I need the Table Saw or welder, etc. I start up the generator for the heavy loads. I can so much relate to your problem, glad you found a solution.

  • @branchandfoundry560
    @branchandfoundry560 6 หลายเดือนก่อน

    Great to see your shop, as I'm finalizing plans now with the architect for my new shop. It's helpful to see a similarly sized space. Hang in there, buddy, these things all just take time to work through the process. You made it work for now & that's what matters!

  • @WoodworkingWarrior
    @WoodworkingWarrior 9 หลายเดือนก่อน +7

    Looking good! Moving into a bigger shop is such a great feeling.

  • @mikecorrado4971
    @mikecorrado4971 9 หลายเดือนก่อน +6

    They say you can’t fight City Hall. You proved them wrong. I love it. Good luck with the rest of your shop-build! 👏

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      Thanks!

    • @lsucowboy
      @lsucowboy 7 หลายเดือนก่อน +1

      Bro, city hall doesn't run the power company. With few exceptions, power utilities are for profit, capitalist companies.

    • @SegoMan
      @SegoMan 2 หลายเดือนก่อน

      2 words - "Video Camera" always videotape interactions so they can't weasel out of what they told you and agreed upon.. It's sad the world has come to this but as Walter Cronkite would say "That's the way it is"

  • @CorbyQ
    @CorbyQ 9 หลายเดือนก่อน +13

    Im sorry you are going thru all this. I will definitely add you to our prayers. Im glad you figured out a temporary fix.

  • @jimrosson6702
    @jimrosson6702 9 หลายเดือนก่อน +7

    Congrats on your new shop but so sorry for all the trouble with the power. But you’ve got a great attitude about things so when you do get your power you will be totally ready to go best of luck on getting it done

  • @dvillagomezjr
    @dvillagomezjr 9 หลายเดือนก่อน +5

    Good for you man! I hope everything works out at the end! I had to transform my back patio into a shop. I'm in Los Angeles and the struggle is real here as well. I just subbed btw.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      I know the feeling. Before I started the channel I was working on my back porch. Then I bought a shipping container and eventually the channel. You might like my earlier content. Welcome to the channel and thanks for the sub! I really appreciate it!

  • @Trudgewild
    @Trudgewild 9 หลายเดือนก่อน +6

    Pounding that like button and letting those ads roll in support for your channel. Glad you got power. Hopefully I’ll have mine restored today from the Thursday storm. New poles went up last night. Feeling optimistic

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +2

      Thanks, and good luck! Hopefully you'll get power soon!

  • @namtech425
    @namtech425 7 หลายเดือนก่อน

    Oof man I feel you, we just finished up our renovations to the house, the contractor was superb but the city inspectors..... and we are not done yet as we ran out of money, so now I end up making and fitting the last stuff. Good luck let look to the future, hope you enjoy that shop.

  • @marshalldressel9615
    @marshalldressel9615 8 หลายเดือนก่อน

    Plywood for walls! Good man!
    I used 5/8 OSB on the 20’ x 20’ room shell over my shop and then made it a huge BR, dressing room, and BIG bathroom. The entire ceiling is 5/8” plywood.
    TRUISM: All roofs leak eventually…sheetrock fails but OSB and plywood simply dry out once leak is fixed!
    Keep up the good work and creative planning/thinking!

  • @johnc7512
    @johnc7512 8 หลายเดือนก่อน +4

    This is why people are fed up with city's and counties and move out to where there are no building codes or electrical codes.

  • @joehanika
    @joehanika 9 หลายเดือนก่อน +19

    The BS that we have to go thru with utilities/city employees kills me. There are few things as stressful as this. Glad you got it up and running!

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      Thanks!

    • @russell7489
      @russell7489 2 วันที่ผ่านมา

      Or grow up. Life's a b... Then you die. He saved 20, 50 g doing all the elec work instead of hiring an elec who works w utility every week & has a "relationship" or just knows up front what crap is coming & compensates. Take your savings & be happy.

    • @joehanika
      @joehanika 2 วันที่ผ่านมา

      @@russell7489lol… you’ve never dealt with city workers.

  • @kgripen757
    @kgripen757 หลายเดือนก่อน

    Tough break - updated the 100 amp service to my home to 200 amp. Worked directly with my electrician as well as the utility provider, Central Maine Power. Made several phone calls to the utility company, always getting the full name and phone number as well as email to get everything on record. Although delayed by weather related events (totally understandable), the work got done (disconnect, reconnect meter, socket, etc.). Critical to bring the utility directly into the loop.

  • @tomstone2322
    @tomstone2322 9 หลายเดือนก่อน

    Great job love the new shop! We built a house 26 years ago we did ourselves. Had a similar situation but with the septic I spent 18,000 on a raised drain field and they told me I couldn’t use because they was going to run city sewer. I understand the frustration it ridiculous they do stuff like this. Stay strong my friend things will workout it did for us

  • @scottwhite9717
    @scottwhite9717 9 หลายเดือนก่อน +3

    Great-looking shop, great solution to the power issue.
    I would have gone with a larger gauge wire like an 8 gauge.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      Thanks! I would've as well, however, the existing wire was 10 gauge that I tied into and I was trying to keep the expense as low as possible. Thanks for commenting!

  • @MCsCreations
    @MCsCreations 9 หลายเดือนก่อน +3

    Congrats for the new shop, dude! Really fantastic space you got there!!! 😃
    But yeah, they almost screwed you up... Almost! Well done, fantastic solution! 😃
    I'm also dealing with the electricity company, because I'm installing solar panels here. But luckily it's been smooth so far... They already changed the meter there... I don't know the name in English... And they're going to install the panels on Wednesday (October 30). So... Let's see how it goes. 😬
    (But I'm installing without batteries for now, still on grid... I'm going to leave it for the future for now.)
    Anyway, stay safe there with your family! 🖖😊

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks and good luck on the solar! It's a great investment for sure

  • @justinficarra6376
    @justinficarra6376 6 หลายเดือนก่อน

    Your story of perseverance is amazing.
    Thank you for sharing.
    God Speed.

  • @brianlanning836
    @brianlanning836 7 หลายเดือนก่อน

    One of the reasons we moved to rural Oklahoma was to avoid this kind of crazy. The electrical co-op brought power to a panel outside with a meter box. I added two disconnect switches, then buried 3" conduit running to six different buildings. I brought power into the buildings and did all of the inside wiring myself. Totally up to code. Zero permits. Zero inspections. The only inspection we had was to install the septic system because that's how the state assesses property taxes. The inspector worked for the septic company doing the install. I even installed a culvert on a county road. No permits.

  • @1pokras
    @1pokras 9 หลายเดือนก่อน +7

    Congrats on your new shop! If I heard you correctly, your Romex run of 10-3, especially at the distance you're running it might be undersized. Usually we run #8 for a 40A circuit, at your distance, you'd be safer to run #6. It also might mitigate the dimming of your lights when you turn on your table saw. Consult a licensed electrician and the NEC Wire Size/Run Distance/
    Ampacity Chart!

    • @caseymiller3540
      @caseymiller3540 9 หลายเดือนก่อน +2

      I came to say the same thing. 10 gauge wire is only approved for a maximum of 30 amps. And yes because of the distance I would upgrade it to 6 gauge instead of 8 gauge. It will help with the light dimming for sure.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +2

      I would but it'd be significantly more expensive for such a temporary thing. I just can't justify spending the extra money (more than I've already spent) for something that will be temporary.

    • @caseymiller3540
      @caseymiller3540 9 หลายเดือนก่อน +1

      @@burnstockwoodworking Just be cautious of using multiple high amperage machines/appliances at the same time and you should be fine temporarily. And if multiple are needed such as saws plus dust collection power up the machine that draws the most power first. The peak amperage is typically during startup unless you’re overworking the machine, this will help reduce breakers tripping during initial startup.

    • @ronaldhanes8290
      @ronaldhanes8290 8 หลายเดือนก่อน

      Could change to #6 wire and add a minisplit

  • @chrisp.76
    @chrisp.76 9 หลายเดือนก่อน +3

    Congrats on beating them. You might be able to use one of those power generators that have been advertised on woodworking videos a lot in the last 6-12 months. Maybe it could run an AC?

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks! Yep, I applied for an affiliate with Jackery, that was my first course of action actually. Haven't heard anything back but it's all good

    • @jimscruggs5400
      @jimscruggs5400 9 หลายเดือนก่อน

      He maybe able to put on a softstart and work it

  • @kennyshipman9337
    @kennyshipman9337 9 หลายเดือนก่อน

    Excellent Excellent, improvise, adapt, overcome. Glad I found the channel. Looking forward to seeing more.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      I'm glad ya found it too, welcome to the channel and thanks for the comment!

  • @testingperson8413
    @testingperson8413 9 หลายเดือนก่อน +2

    'merica!
    Make America Great Again,
    YOU DID IT!
    We are PROUD of you Sir!

  • @paulsylvester1394
    @paulsylvester1394 9 หลายเดือนก่อน +6

    Sadly, we have people in positions of responsibility who supposedly work for us but in reality do not. They should be fired!

  • @dereksmith1803
    @dereksmith1803 หลายเดือนก่อน

    Good for you in figuring out a workaround. I was going to make the suggestion of telling the utility company to go pound sand and just install a generator and proceed without them, but your fix works as well and it's cheaper to do, so win win.

  • @valhallamaker8356
    @valhallamaker8356 9 หลายเดือนก่อน

    Amazing shop, my friend. Your shop, your way. And yes, our Louisiana heatwave is rough right now. Especially with all the wildfires statewide.

  • @Dillonsvideos
    @Dillonsvideos 9 หลายเดือนก่อน +2

    Great video man enjoyed it a lot. Great job with the shop and working with what you have.

  • @guruoo
    @guruoo 9 หลายเดือนก่อน

    Congrats to you, bro! I find that beating the system when it's working against you is one of the most satisfying joys in life.

  • @Platoface
    @Platoface 8 หลายเดือนก่อน +1

    I hear you. Did same thing for Windstream for fiber optic. Engineer came out and told me what I needed. So I did it. Called them out said everything is ready. They came out, with original engineer and another man told me it was all wrong. I replied what are you talking about? That guy right there said that’s what I needed. He lied straight to my face and said that’s not what I told you. Took another 2 months before they could come out again.

    • @burnstockwoodworking
      @burnstockwoodworking  8 หลายเดือนก่อน +1

      Seems to be a trend going on with these people

  • @Buffy1967
    @Buffy1967 9 หลายเดือนก่อน

    That was a genius solution, the heat will pass but I understand how bad it can be . I use fans in my garage shop . Shop is looking good. So much usable space , nice

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks! No end in the immediate sight for the heatwave but as seasons go it'll cool off ...in a few years at least 😆

    • @flashbazbo694
      @flashbazbo694 8 หลายเดือนก่อน

      Cutting corners and creating the potential to burn your new shop down is in no way a "genius" solution.

  • @robertcampbell6042
    @robertcampbell6042 9 หลายเดือนก่อน +1

    Solar + Wind with a power wall (or two). Higher upfront costs but lower costs over time. 40 amp service as a top-up source or for use with "time of use" billing. Operator-facing fans will help with the heat and help control dust.

  • @justinbanks2380
    @justinbanks2380 9 หลายเดือนก่อน

    Glad to see I'm not the only one who spaces screws evenly across things, even when it doesn't matter or is overkill.
    (I actually didn't even realize it until someone saw me doing it and asked why, lol.)

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      I like everything to be as neat as possible so I feel ya!

  • @JayneCobb88
    @JayneCobb88 8 หลายเดือนก่อน

    Makes me appreciate where I live even more. I don’t even have to pull a permit to build, just for septic.

  • @windmillbk
    @windmillbk 5 หลายเดือนก่อน

    I am sorry you are going through this. It took me over a year of run around and backtracking to get power to my land. I travel through an "easement" (titled into the property) to get to my land. The person in the 5 acres closest to the road has a power box at the end of his property put there for our property to also have power. After a 6mth wait for booking the power run, At the last minute the Electrical company needed a survey of his property and legal documentation to run the power through the titled easement to make sure we were not on his property. Surveyors were booking 6mth out.

  • @davidbaulch3223
    @davidbaulch3223 9 หลายเดือนก่อน

    Looks good. It took me over 13 years to finally break down and have a mini-split installed in my shop. Thought I could make it in summer and winter with fans and "milk house" heaters. Couldn't make it any further. Summer in upper Central Texas almost killed me.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      I'm going to be putting in a mini split very soon after I get legitimate power. Makes it way easier to go work in an air conditioned shop. Southeast Louisiana here so I feel ya on the summer heat

  • @michaelgutierrez6564
    @michaelgutierrez6564 9 หลายเดือนก่อน

    I wired a backup generator in a similar fashion when we lost power. I didn't want to lose a refrigerator full of food yet again. I upgraded my panel to a 200A panel after than and installed a generator inlet. Now I can power everything in my house except my electric stove an A/C unit. Now I'm working on getting a soft start for the A/C to be able to run that off the generator as well.

  • @bradrock7731
    @bradrock7731 9 หลายเดือนก่อน +1

    You are a strong man. I could not take it anymore. Moved to a part of the Ozarks. No codes or permits or inspections for anything.
    I'm looking at an ad right now for a 30 x 40 x 10, installed on your pad for 12K.
    Lots of nice wood here too.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      Room for 7 more? 😂😂

    • @user-xg1rp5oj8b
      @user-xg1rp5oj8b 8 หลายเดือนก่อน

      I'm in northern California. Build then back permit is one of the only ways to get ANYTHING done. You get one person in the chain that has "a bad day" you will never get permitted and signed off for years at a time. We live in bureaucracy hell and no lemonade in sight.

  • @tracynation2820
    @tracynation2820 4 วันที่ผ่านมา +1

    Super. I have temporarily wired many buildings, usually to get heat, lights, a receptacle, or A/C. I ran two heat guns once, 27 amperes at 120 volts, through 14/2g Romex for almost 8 hours without burning anything, but the wire was quite warm during use. You should put the 30 ampere breaker in front of the 10/3g, and the 40 ampere breaker in the shop, as 10 gauge is nominally rated at 30 amperes, but will trip a 40 ampere breaker no sweat, so if you are selective of what is operating, you will be fine. If you are doing a subpanel, never run anything smaller than 4/3g copper or 3/3g aluminum (4 wires) and a 60 ampere (or 70 ampere) main breaker, but 1,200 square feet would make me suggest a larger main of 100 amperes and for the long run, 2/3g copper, or 1/3g aluminum, although 4/3g copper or 2/3g aluminum would probably be adequate. Super shop. Good luck. 💙 T.E.N.

  • @markjohns4651
    @markjohns4651 9 หลายเดือนก่อน +2

    I love your attitude towards finding a work around. I would look into a generator or solar. I hate the red tape they love to throw at you at the last minute.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks! It is what it is at this point but I'm still coming out on top in the long run.

  • @robthewaywardwoodworker9956
    @robthewaywardwoodworker9956 9 หลายเดือนก่อน

    Necessity is the mother of invention! Way to go, brother. Adapt and overcome.

  • @hamop3
    @hamop3 8 หลายเดือนก่อน

    If you have room in your house box, you could have put the correct size breaker in and forget the delimma with the power company. When I bought my property, I did that very thing. Installed breaker, got wire, conduit, breaker box for inside of shop. 15 years later never missed a stroke. No blinking lights either. Power tools and welder humming nicely.

  • @sandikhader1801
    @sandikhader1801 9 หลายเดือนก่อน +1

    Ingenuity, perserverance and determination, the red blooded American man. Very nice job. Great shop!

  • @RAkers-tu1ey
    @RAkers-tu1ey 7 หลายเดือนก่อน

    Adding to the chorus below - I have a couple of recommendations: Treat that extension cord as what it is. Unplug it and coil it up every night. Get a meter of some sort for the end of run (kill-a-watt or whatever) and unplug tools or lights if the voltage drops below 100 (or 200 if 220) at the tools, or if the connection gets warm. Consider talking to an actual electrician about re-wiring the saw to 220 (most of them will do it) to reduce the ampere draw on the line.
    Maybe get a generator to run the shop separately from the saw. Good luck.

  • @FearsomeWarrior
    @FearsomeWarrior 9 หลายเดือนก่อน

    I miss the workbench from the shipping container. I remember it looking heavy. Shop looking great. Exciting even with a wait. Traditional-ish workbench will be awesome to see. I made a bench based on author/teacher Chris Tribe’s bench. Four layers of MDF.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks! I still have that one actually, it's outside under our little garden shed. 🤔 Maybe I'll have to bring it back in

  • @kimcoweld278
    @kimcoweld278 17 วันที่ผ่านมา

    Wish I lived close by. I'm retired now, but still have my excavator and could run that line underground. Later when you get your electric service you could use the RV line as a secondary service so it wouldn't go to waste.

  • @mystics-attic
    @mystics-attic 8 หลายเดือนก่อน

    The American Spirit, you've got it. Kicken it down the road. Great shop, great video.

  • @christiansmalley263
    @christiansmalley263 9 หลายเดือนก่อน

    Everything looks AWESOME!

  • @nicholasmanovich4330
    @nicholasmanovich4330 6 หลายเดือนก่อน

    Hah ! Good for you bud !!! Glad it's working out !!!

  • @ModernMountainLiving
    @ModernMountainLiving 9 หลายเดือนก่อน

    Good for you! I am building a 30x40 shop too. My Electrical CO-OP ran across the property I bought at a diagonal without an Easement so I asked them to move it since it went under the only place I can build with septic and setback rules. They told me if I did ALL the work they would ONLY charge me $30,000. They took 1 1/2 years to answer.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      30k for what?!

    • @ModernMountainLiving
      @ModernMountainLiving 9 หลายเดือนก่อน

      Absolutely ! Me to trench 200', bury 2" conduit, Them to replace the 50 year old direct burial wire. Finally said if I would set the meter bases they would run the 10' to transformer for $8500 including engineering fee. If I would sign a Utility Easement I could build to 3' instead of 10' of the diagonal underground run. CO-OPs are supposed to be Customer Owned, this one has an Us against Them attitude.
      @@burnstockwoodworking

  • @jamesray9009
    @jamesray9009 8 หลายเดือนก่อน

    sounds like a good reason for solar .. I get free 250w panels that end up needing diodes .. I plan on using just for lights in the house.. then as I get more and buy more I plan on increasing the sizing

  • @frankmckie2992
    @frankmckie2992 9 หลายเดือนก่อน

    Good lad .... we all need to stop sulking and overcome more 🙂👍🏴󠁧󠁢󠁳󠁣󠁴󠁿

  • @willbaxter5272
    @willbaxter5272 9 หลายเดือนก่อน

    Perfect opportunity to build a content library of building out your shop space!

  • @user-vn6hi2bi3g
    @user-vn6hi2bi3g 9 หลายเดือนก่อน

    I did not see your post earlier, run a parallel supply line 10-3 to panel and voltage drop will be signifcantly less (dimming of lights when you turn on a motor table saw etc.) and it will help prevent low voltgage damage to your equipment and allow you to use dust removal concurrently until permanent service is activated.Ray Stormont

  • @MrKaebee
    @MrKaebee 9 หลายเดือนก่อน

    GOD bless you my friend, i am glad you figured something out, ooorah!!!!!

  • @raycecil4643
    @raycecil4643 9 หลายเดือนก่อน

    Bro....that table saw didn't look that hard to move. lol. Glad you got everything going! You are inspiring me!!

  • @optionstrader9637
    @optionstrader9637 หลายเดือนก่อน

    I know i saw this video a bit late, but an easy solution in my opinion would be a 48v inverter with like 10kwh of battery. The cost would be around $4k but you can then feed the power as it is now into the inverter to charge the battery bank. it will utilize both grid and battery to power your loads being much more stable for equipment.

  • @alanlane3869
    @alanlane3869 6 หลายเดือนก่อน

    I haven't read all of the comments, but my time in service made me first think of getting a surplus 10kw generator on a trailer. They even work in war zones. 👊😜

  • @rickphuxx9805
    @rickphuxx9805 8 หลายเดือนก่อน

    Hello ...you can run another 8/3 or 10/3 from main breaker from the house place a sub panel for split unit a/c (110) and that should carry you ... and any other 240/ 20amp tools

  • @donaldgulledge729
    @donaldgulledge729 หลายเดือนก่อน

    I have heard and experienced with my current build, that power meter panels are up to 18 months backorder.

  • @mrmyblessednest1722
    @mrmyblessednest1722 9 หลายเดือนก่อน

    Would love to see a video on the cabinetry you build and set up of that radial arm saw! Great video! Great perseverance!

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Thanks! I'll be sure to record that one, I'm still designing it in my head

    • @mrmyblessednest1722
      @mrmyblessednest1722 9 หลายเดือนก่อน

      @@burnstockwoodworking I have a late 1980’s craftsman radial arm saw I’m wanting to remove the base and incorporate in to my miter saw wall

  • @Dancing_Alone_wRentals
    @Dancing_Alone_wRentals 9 หลายเดือนก่อน +1

    Glad this is moving forward for you. I was guessing the problem was much bigger than six months. I thought perhaps the city had shut down a commercial business in a residential zone. Wishing you more good news to come!

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      No issues there, just a regular joe building a shop and doing my own thing as far as they're concerned.

    • @Dancing_Alone_wRentals
      @Dancing_Alone_wRentals 9 หลายเดือนก่อน

      that is good to hear,@@burnstockwoodworking

  • @justinbanks2380
    @justinbanks2380 9 หลายเดือนก่อน

    That last few minutes of motivation!

  • @eliinthewolverinestate6729
    @eliinthewolverinestate6729 8 หลายเดือนก่อน

    We usually run ground up on outlets in a shop or garage. There is no required orientation but ground up is slightly safer. And cords less likely to come out. You should run a soft start or thicker wire. You can get bigger cover plates for the sloppy holes.

    • @jamesjacobs-sj2il
      @jamesjacobs-sj2il 7 หลายเดือนก่อน

      Commercial/industrial-ground up
      Residential-ground down

  • @bambambundy6
    @bambambundy6 8 หลายเดือนก่อน

    Love the shop!

  • @norm5785
    @norm5785 8 หลายเดือนก่อน

    Wowser, not fair. But you have power. Thank you for sharing your awesome new workshop. Everyone stay safe, happy 😊😊 and healthy. From Henrico County Virginia

  • @worstworkshop
    @worstworkshop 9 หลายเดือนก่อน

    Wow. Just wow. Your shop is gonna be awesome, and that's my kind of solution.

  • @danpenry8899
    @danpenry8899 8 หลายเดือนก่อน

    My air compressor and welder would trip the breaker but I replaced the 10 g with 6g from the house to the garage and it fixed that problem

  • @Rsc-dz2sh
    @Rsc-dz2sh 9 หลายเดือนก่อน

    hey man , a mans got to do what a mans got to do! i know your fustration i had to wait 3 months to get power to my shop.

  • @rkeantube
    @rkeantube 8 หลายเดือนก่อน

    if you want AC, get a Micro-Air Easy Start, but you might not be able to use as many tools when AC is running, keep the RV post out there just in case, you can argue a temp setup vs a perm setup

  • @guytech7310
    @guytech7310 หลายเดือนก่อน +1

    yeah, Matt from Diesel creek had issues getting power to his shop at a cost of about $60K, just for the power, even though he did all of the trenching, conduit, & transformer pad.

  • @rickruppe4106
    @rickruppe4106 9 หลายเดือนก่อน +1

    Well done my friend! Sounds like a trip to the "town hall" or city council meeting sharing your story could give some department heads a heads up..."sqeaky wheel gets the grease". Best wishes 😀🙏

  • @askmisspatience
    @askmisspatience 8 หลายเดือนก่อน

    Perhaps a solar set up for ac could also benefit long term savings. Use RVer method. It could help offset the heat.
    Sucks what you went through. Sounds like you’re handling the circumstances like a champ

  • @MattMadeIt123
    @MattMadeIt123 9 หลายเดือนก่อน

    Great you got it going. FYI- 10AWG run 150' for a 240V circuit is only good for 20A with a 3% voltage drop. I'm sure this will get you by, just keep that 20A limit in mind for any extended current draw.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน

      Will do, thanks for the info!

    • @AKdesignsandhardwoods
      @AKdesignsandhardwoods 9 หลายเดือนก่อน +1

      I was going to add to this. You need to bump that gauge up. That voltage drop over that run is going to be significant.

  • @thefilthelement
    @thefilthelement 9 หลายเดือนก่อน

    I feel your pain, I have a single 20amp single pole to my small shop. The shop is 20 feet straight back from the main on the back of my house. The cheapest contractor wants $6k just to run a new 60amp line to the shop 20' away. The city is coming up with all kinds of excuses and code violations for the past 4 months before even starting.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Jeez. They were gonna charge me 7k in the beginning but now, because of their mistake, they're doing it all for free

  • @billy19461
    @billy19461 9 หลายเดือนก่อน

    You are bound to be in Louisiana, so am I. Love your shop. I wish I could build one.

  • @roberthellebush8775
    @roberthellebush8775 8 หลายเดือนก่อน

    So sorry about your run in with insane bureaucracy!! I sorta had a corollary problem … trying to run my small shop out of a 10x20 storage unit … NO electricity! So, I rigged up a Ryobi 1800w battery power inverter … and it works. Powers a mitre saw, band saw, drill press and LED lighting. Just take the portable inverter home to recharge each night.

  • @divinesoul23
    @divinesoul23 9 หลายเดือนก่อน

    Love the new shop!

  • @deweyabbott5310
    @deweyabbott5310 6 หลายเดือนก่อน

    This is a good lesson for everyone to video record when they talk to inspectors, this way you can take it to court they will tell you one thing an then turn around an say somthing diff, our state an congrass have aloud this

  • @SinSpawn9000
    @SinSpawn9000 8 หลายเดือนก่อน

    I applaud your ingenuity for your temp fix, I would look into what kind of formal complaint or even lawsuit you could send to the power company since if your electrical needs/plans didn't change from when they first approved your layout to when they decided the transformer needed a redesign then there should have been no reason for the change on their end, if they are telling you that you have to pay for the transformer redesign and install that's basically fraud.

  • @pazmaniaoh6341
    @pazmaniaoh6341 9 หลายเดือนก่อน +2

    Glad you overcame. Good luck

  • @ur22much2
    @ur22much2 8 หลายเดือนก่อน +1

    Good for you, good old American ingenuity. You make a mother proud. You got a shop , man. Take it easy, take a break, take a breath, and give yourself the kudos you deserve.

  • @edm9063
    @edm9063 9 หลายเดือนก่อน

    I’m working on a few commercial jobs right now that require two 600 amp panels. The leadtime is 30 weeks from all major brands.

  • @billkaline5072
    @billkaline5072 8 หลายเดือนก่อน

    Are you planning on planting large shade trees, if so, plant ASAP to grow your own natural shade. And, there is always swamp coolers if needed in your area.

  • @shieldofthebear1784
    @shieldofthebear1784 9 หลายเดือนก่อน

    Glad you were able to get up and running, even if it's in a slightly diminished capacity. Sorry about the heat. Not sure who ordered it but it's been killing me too.

    • @burnstockwoodworking
      @burnstockwoodworking  9 หลายเดือนก่อน +1

      Is what it is. I've been looking for the receipt on the heat but can't seem to find it. I think it may be all the people that were whining about the cold last winter that placed the order 😆😆

    • @shieldofthebear1784
      @shieldofthebear1784 9 หลายเดือนก่อน

      @@burnstockwoodworking You're probably right.

  • @benwilkerson3762
    @benwilkerson3762 8 หลายเดือนก่อน +1

    If it’s the same in your area as mine, you’ll need another inspection just before the power company installs your meter. Be careful they don’t see your “jerry rigged” service entrance.

  • @attiliobarcados8178
    @attiliobarcados8178 8 หลายเดือนก่อน

    fire is a big hazard in any workshop, hence planning is needed: fire extnguishers but also a garden water hose but in that case care must be given to electrical wiring, it runs on the floor and will get in contact with water...an overall breaker for the whole workshop would be required. Any ideas as fire exting. will last 30-40 seconds and the workshop is full of dried wood and sawdust. what would you recommend ?

  • @ypaulbrown
    @ypaulbrown 8 หลายเดือนก่อน

    sorry to hear this happened to you. I hope you get it settled.......Paul in Florida....