Great video. What is the connection between the shutters/working platform and hydraulic jack/rods called? - talking about the blue, yellow and silver brace type thing which is elevated by the jacks.
I think, in hydraulic jacks system, either cavity piles or jacking rods must be left in wall so that they can support this system of formwork. Is that right ?
@@bitschnaugleitschalungstec7312 I see the jacks, but the problem in this video is it showing the jack being cured inside the drying concrete. This means that the jack rod must be the target height of the structure to continue jacking the form upward as the rod itself is now stuck inside the concrete.
@@lextacy2008 Together with the formwork, we also lift coverpipes which create a hole in the concrete for the climbing-rods. So after sliding, those rods can be pulled out and will be reused.
Yes Sir Rod Estrada, There is 3 Designs available which I am trying to develop and innovate to practically works for the project. How are you. Joji Cruz here
Hats off to whoever animated this, great work
This is a very useful video. Thank you!
Great video. What is the connection between the shutters/working platform and hydraulic jack/rods called? - talking about the blue, yellow and silver brace type thing which is elevated by the jacks.
Is there voids remain in wall after lifting??
This is great! good work
Were those black things below the window openings used to mark a certain height ??
Maybe slots for the floor beams?
side note: at 1.5x speed, the background music is a banger
Thanks a lot, loved it
Love your work mate
I slip form what is the lifting time from one height to another height?
madhan raj 2,5 cm
what is the black thingy they attached at the wall?
a very useful video thnxs!!
Still don't understand how the platform is physically raised.
The whole slipform is lifted with hydraulic jacks which are mounted on top of the blue crossing steel-beams
I think, in hydraulic jacks system, either cavity piles or jacking rods must be left in wall so that they can support this system of formwork. Is that right ?
@@bitschnaugleitschalungstec7312 I see the jacks, but the problem in this video is it showing the jack being cured inside the drying concrete. This means that the jack rod must be the target height of the structure to continue jacking the form upward as the rod itself is now stuck inside the concrete.
@@lextacy2008 Together with the formwork, we also lift coverpipes which create a hole in the concrete for the climbing-rods. So after sliding, those rods can be pulled out and will be reused.
@@bitschnaugleitschalungstec7312 very nice! thanks for that clarification
Nice 👍👍
Is there slipforming system for single sided walls?
Yes Sir Rod Estrada, There is 3 Designs available which I am trying to develop and innovate to practically works for the project. How are you. Joji Cruz here
🔥🔥🔥🔥🔥🔥
Very helpful
what's the name of this Software?
thanks very useful
nice video
Thanks you
r u ready?
useful video
column??? no?
i been in gleitbau group in 1997 project chimney
Im Stealing this idea!!!
😆😆😆
#concreteconstruction
monolithic construction
KÄRNAN