Elevator cameras project

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 ก.พ. 2025
  • 8 elevators in total 3 towers 43 floors 30 floors and 10 floors . 4 days on the job so far . We still have conduit to run in mechanical rooms and basement . Mounting cameras in elevators . Should have more time go over job later just working and running up and down floors
    I wish I could make cool videos but I'm more worried about getting the work done . When I did the walk out spent 6 hrs pre Fielding figured about 90% out the last 10% was tough .

ความคิดเห็น • 8

  • @anethespark3211
    @anethespark3211 6 ปีที่แล้ว +1

    Good job my friend bravo.

    • @lowvoltagedude7837
      @lowvoltagedude7837  6 ปีที่แล้ว

      ToolTech MindMan70 still working on this job will make another video soon
      Thanks for checking out this video

  • @laykenwalls4334
    @laykenwalls4334 6 ปีที่แล้ว +1

    Great vid dude!!!!

    • @lowvoltagedude7837
      @lowvoltagedude7837  6 ปีที่แล้ว

      Layken walls thanks buddy heading back this week finish up

  • @asauce03
    @asauce03 6 ปีที่แล้ว +1

    Nice vid bro.
    Work hard, eat good, i like it! Lol

    • @lowvoltagedude7837
      @lowvoltagedude7837  6 ปีที่แล้ว

      Thanks bro we try jobs going good near some good eats

  • @qeelevators2960
    @qeelevators2960 4 ปีที่แล้ว

    Holy cow that’s fast