Heavy Grade. Highest Windrow Height I have Seen. Highest Quality Process.

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 ก.ย. 2024
  • Not a common practice with organisations due to the costs.

ความคิดเห็น • 6

  • @arkansas1336
    @arkansas1336 3 หลายเดือนก่อน +3

    I love watching a grader work!
    I've calculated there are about 1200 different geometeric setups (probably more) you can create when operating a grader. If the grader operator would lay the mold board about 1/2 forward during his final finish pass when doing the fore slope of the ditch he would leave less material in the ditch giving it a more defined/flowable profile. And my very last pass on the main surface, I laid the mold board forward/down for a 'tighter together' surface making it smoother even after the rollers finished. Operated one of these for 47 years.

  • @tutekohe1361
    @tutekohe1361 5 หลายเดือนก่อน +1

    He was making that Grader work!

  • @denisdunn-ie5nu
    @denisdunn-ie5nu 5 หลายเดือนก่อน +1

    Very good job 👍👍

  • @fatehsiouda6197
    @fatehsiouda6197 5 หลายเดือนก่อน +1

    Good job 🎉

  • @watunesochanel
    @watunesochanel 3 หลายเดือนก่อน +1

    Motor Grader Riping Road Bos