How to do Ringlock Scaffolding/ Falsework at Site (Function & Advantages)

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 พ.ย. 2019
  • The Ringlock scaffolding system is one of the types of modular scaffolding . It enables workers to set up, use, and disassemble a temporary work structure with speed and efficiency, therefore saving on time and labor cost. Ringlock is one of the most sophisticated and complete scaffolding systems on the market. It has been designed to keep components minimal to allow for simple set up and dismantle. A single rosette sits at the core of all components. With a built-in safety mechanism and high load capacity, the ringlock scaffolding system is a popular choice in many different kinds of applications.
    ------------------------------------------------------------------------------------------------------------
    #Falsework #Scaffolding #Dhaka metro rail
    Setting up ringlock scaffolding involves several key steps to ensure safety and efficiency. Here's a step-by-step guide to help you through the process:
    Materials and Tools Needed:
    - Ringlock standards (verticals)
    - Ringlock ledgers (horizontals)
    - Ringlock diagonal braces
    - Base jacks or base plates
    - Scaffold planks or decks
    - Safety equipment (helmets, harnesses, gloves, etc.)
    - Level
    - Hammer or mallet
    - Measuring tape
    Steps to Assemble Ringlock Scaffolding:
    1. *Site Preparation:*
    - Clear the area of debris and ensure the ground is level.
    - Lay out the base jacks or base plates where the standards will be placed.
    2. *Setting Up Base Jacks:*
    - Place the base jacks on the prepared ground at appropriate intervals according to the scaffold design and load requirements.
    - Adjust the base jacks to ensure they are level.
    3. *Installing Standards (Verticals):*
    - Insert the bottom of the standards onto the base jacks.
    - Ensure the standards are plumb (vertically aligned) using a level.
    4. *Attaching Ledgers (Horizontals):*
    - Attach the first set of ledgers at the base of the standards to form the scaffold’s base frame.
    - Secure the ledgers to the rosettes on the standards using the wedge-lock system.
    - Continue adding ledgers at the required heights, forming horizontal platforms.
    5. *Installing Diagonal Braces:*
    - Attach diagonal braces to the standards to provide lateral stability.
    - Ensure they are properly secured to the rosettes on the standards.
    6. *Building Up the Scaffold:*
    - Continue adding standards and ledgers, working your way up to the desired height.
    - Install additional diagonal braces as needed for stability.
    - Ensure all connections are secure at each level.
    7. *Installing Planks or Decks:*
    - Place scaffold planks or decks on the ledgers to form working platforms.
    - Secure the planks to prevent movement.
    8. *Safety Measures:*
    - Install guardrails on all open sides of the scaffold at each working level.
    - Ensure access points (ladders or stairways) are secure and in place.
    - Inspect the scaffold regularly to ensure all components are securely fastened.
    9. *Final Checks:*
    - Perform a thorough inspection to ensure the scaffold is stable and all components are properly secured.
    - Ensure the scaffold meets all local safety regulations and standards.
    Safety Tips:
    - Always wear appropriate personal protective equipment (PPE).
    - Follow the manufacturer’s guidelines and local safety regulations.
    - Ensure all workers are trained in scaffold assembly and safety procedures.
    - Do not exceed the scaffold’s load capacity.
    - Regularly inspect the scaffold for any signs of wear or damage.
    By following these steps, you can safely and effectively set up ringlock scaffolding for various construction and maintenance tasks.
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 34

  • @zahanurrahman5419
    @zahanurrahman5419 9 หลายเดือนก่อน +1

    THANKS FOR YOUR UPLOAD

  • @benjiblanx
    @benjiblanx 2 ปีที่แล้ว +2

    Base collar is upside down

  • @hunanworldscaffoldingco.lt7232
    @hunanworldscaffoldingco.lt7232 4 ปีที่แล้ว

    Practice makes perfect.

  • @bubleleo66
    @bubleleo66 ปีที่แล้ว +1

    pocher upside down???

  • @user-xg6ff6rc6q
    @user-xg6ff6rc6q ปีที่แล้ว

    ধন্যবাদ ভাই

  • @abdullahbhuiyan3520
    @abdullahbhuiyan3520 ปีที่แล้ว

    The first props after jack base has been wrongly installed. 😊

  • @sharifulshariful1021
    @sharifulshariful1021 ปีที่แล้ว

    অনেক সুন্দর

  • @abdelkrimbouzid6313
    @abdelkrimbouzid6313 3 ปีที่แล้ว

    عمل جيد

  • @user-yk2js1qs7k
    @user-yk2js1qs7k 4 ปีที่แล้ว +1

    ভালো হয়েছে ভাই কাজ শিখা যায় ভিডিওটা দেখে

  • @mdalaminkhan-khans-power360
    @mdalaminkhan-khans-power360 ปีที่แล้ว

    ইসকা ফোল্ডিং এর আরো অনেক ভিডিও চাই।

  • @LivizaBangladesh
    @LivizaBangladesh 3 ปีที่แล้ว

    nice

  • @yousuftalukder5368
    @yousuftalukder5368 ปีที่แล้ว

    👌👌👌👌

  • @Structure-Dubai
    @Structure-Dubai 2 ปีที่แล้ว

    BROTHER CAN WE PUT THE STANDARD INSIDE THE BASE JACK WITHOUT USING THE COLLAR AT THE BASE?

  • @fozlealahishanu8725
    @fozlealahishanu8725 3 ปีที่แล้ว +2

    Do you produce this form works and scaffolding system in bangladesh or you just provide service? Thanks in Advance.

    • @engineers_life
      @engineers_life  3 ปีที่แล้ว

      No. You can collect from china. Ringlock scaffolding.

    • @delowarsblog7970
      @delowarsblog7970 2 ปีที่แล้ว

      We can Produce this Ring lock scaffold.

    • @openingsds2422
      @openingsds2422 2 ปีที่แล้ว

      We produced. Send your contact

  • @user-yk2js1qs7k
    @user-yk2js1qs7k 4 ปีที่แล้ว +1

    ফাইন ভিডিও ভালো লাগলো কাজ শিখার নতুন পদ্ধতি সাবস্ক্রাইব করি সবাই তাহলে কাজ শিখতে পারবেন

  • @kazisalauddin3581
    @kazisalauddin3581 2 ปีที่แล้ว

    এই কাজ কি খুবই রিক্স

  • @abdullahbhuiyan3520
    @abdullahbhuiyan3520 3 ปีที่แล้ว +1

    Bro, is it in Bangladesh or Kolkata?

  • @shahinkhan3840
    @shahinkhan3840 ปีที่แล้ว

    Kajer mojori kemon

  • @mdusama2424
    @mdusama2424 ปีที่แล้ว

    আসসালামু আলাইকুম ভাই। প্রতিটা যন্ত্রপাতির নাম আলাদা ভাবে বলে একটি ভিডিও দেন। এটা কি ভাবে ছোট বড় করা হয়। মানে সব জায়গায় তো আর এক মাপের রিং লক প্রয়োজন পরে না

    • @abdullahbhuiyan3520
      @abdullahbhuiyan3520 ปีที่แล้ว

      It depends on types of scaffolding. It may slightly differ by manufacturers. In general verticals starts from 200mm to 3600mm for system supporting and 300mm to 3800mm for system scaffolding and horizontals starts from 300mm to 1800mm approximately. Jack base and u-heads are almost all same 600mm but thickness can be differ. System scaffolding in general includes flooring but system supports in general are not. This video actually is about system supports rather than system scaffolding use which includes theoretically flooring section.