  • For this project a fast curing surface coating system with high chemical resistance was required.
    The application process took place in 4 steps:
    1. Concrete was prepared and cleaned of any residues that may have an affect to bonding.
    2. Surface was primed and adhesion improved.
    3. QuickSpray Industrial (aromatic) applied with heated mixing equipment.
    4. 12 hours after the application the job was considered completed.
    The complete process of surface-preparation and application of base coat was successfully
    completed in less then 24 hours.