ไม่สามารถเล่นวิดีโอนี้
ขออภัยในความไม่สะดวก

SmartCare Damp Block 2K

แชร์
ฝัง
  • เผยแพร่เมื่อ 7 ก.ย. 2016
  • SmartCare Damp Block 2K is a two component acrylic polymer-modified cementitious high-performance coating. This product can be used for both positive & negative side waterproofing due to its excellent bonding, good waterproofing and unmatched resistance to hydrostatic pressure.

ความคิดเห็น • 22

  • @Smithaa1
    @Smithaa1 5 ปีที่แล้ว +5

    nice product. I used and got best result. Thank you Asian paints.

  • @srikanth2347
    @srikanth2347 6 ปีที่แล้ว +1

    good

  • @devrajmanjhi2236
    @devrajmanjhi2236 5 ปีที่แล้ว +1

    I love Asians painters

  • @nadeeshwickramasundara3866
    @nadeeshwickramasundara3866 11 หลายเดือนก่อน

    In my bathroom i want to apply cement coat after waterproofing . How long i have to wait after apply ing second coat

    • @asianpaints
      @asianpaints  11 หลายเดือนก่อน

      Hi, in this case, One can apply a coat of 6-8 mm thick cement sand mortar on the wall/floor after 12 hrs of application of second coat of Damp Block 2K once the coating should dry enough.
      Smart Care Repair Polymer (7-10% of cement weight) should be mixed in the cement Sand Mortar for better strength and bonding.
      This application should be done within 48 hrs after second coat application of Damp Block 2K for proper adhesion of the plaster mortar with Damp Block 2K coating.

  • @nagarik.mumbai
    @nagarik.mumbai 5 ปีที่แล้ว

    Make A Video on Asian Paints 2X Putty too

  • @sachinpednekar7520
    @sachinpednekar7520 3 ปีที่แล้ว

    I am a contractor and I am applying this mixture tomorrow morning and I am not plastering on the surface , directly I'll apply POP on the wall face will it give good results?

    • @asianpaints
      @asianpaints  3 ปีที่แล้ว +1

      Hi Sachin, for good result we recommend plaster over damp block 2K.

    • @Abeyjohnsen
      @Abeyjohnsen 2 ปีที่แล้ว

      Hii ..how is it? Does it work?

  • @UmashankarH
    @UmashankarH 3 ปีที่แล้ว

    Do we need to wait 7 days after applying this 2k damp coat??

    • @asianpaints
      @asianpaints  3 ปีที่แล้ว +1

      Hi, if you need to do water ponding test wait for 7 days or if you want to do cement plastering over damp block 2k you can do after 24 hrs.

  • @BrishtiRoy.Official
    @BrishtiRoy.Official 6 ปีที่แล้ว

    If i add 2:1 ratio .it will became a thick consistency.? Then how can I apply

    • @asianpaints
      @asianpaints  6 ปีที่แล้ว

      Hi,
      SmartCare Damp Block 2K mixing ratio is 3:1.
      If you reduce the same then material become thick, which will have problem in application i.e. penetration between gaps of bricks will reduce
      .

    • @Smithaa1
      @Smithaa1 5 ปีที่แล้ว

      Brishti Roy I too used in the same said ratio. Add powder slowly to liquid keep stirring. yes it was bit thick. i applied with brush

    • @prashantkumar-dm4hg
      @prashantkumar-dm4hg 2 ปีที่แล้ว

      How is the result after 3 years?

  • @suniljat7878
    @suniljat7878 6 ปีที่แล้ว

    Hyy

  • @aichsuman
    @aichsuman 2 ปีที่แล้ว

    Can I make second coat after 48 hours of first coat ?

    • @asianpaints
      @asianpaints  2 ปีที่แล้ว

      Hi Suman, you can refer the product information sheet from our website for the application procedure. Here is the link - www.asianpaints.com/products/waterproofing-solutions/smartcare-damp-block-2k.html

    • @aichsuman
      @aichsuman 2 ปีที่แล้ว

      @@asianpaints Product information sheet does not describe it. It is only written you can apply second coat after 4-6 hours. But it is has not stated whether there is any upper limit or not for the same ?

    • @asianpaints
      @asianpaints  2 ปีที่แล้ว

      Hi @@aichsuman , you can apply damp block 2k 2nd coat after 6 hours itself, so you can apply damp block 2k 2nd coat after 48 hours and do the plaster after 24 hours. Hope this helps!