Scholpp uses its new Tadano AC 4.080-1 to lift a bridge into place

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ก.ย. 2024
  • The crane service provider Scholpp and the steel fabrication firm Erich Mächler GmbH are a well-coordinated team, having worked together since 1984. In their time, they’ve mastered many a challenging project - like the recent lift of a steel pedestrian bridge in Bad Rotenfels. But this time the team had a new member: the brand-new Tadano AC 4.080-1 all terrain crane. Scholpp had only recently acquired the machine, complete with all the bells and whistles.

ความคิดเห็น •