DIY ADU #9 - Rough-in Inspection

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 พ.ย. 2021
  • Are you looking to build and ADU or JADU as an owner builder? This series should help you through each step, from design and preparation all of your construction documents, (yes, you can prepare your own documents!), to demo and grading, foundation, plumbing, electrical, framing, roofing, drywall, paint, tile, flooring, cabinets, finishes.
    Subscribe for new content at each step of the process.
    / thisnewadu
    www.thisnewadu.com

ความคิดเห็น • 28

  • @mxm7688
    @mxm7688 2 หลายเดือนก่อน +1

    very detailed and helpful, thank you!

    • @URBNBLDRS
      @URBNBLDRS  2 หลายเดือนก่อน

      Glad it was helpful!

  • @snell2k
    @snell2k ปีที่แล้ว

    Great video - very thorough. When doing my static test for the DWV I had 1 small leak and it was at the clean out… added some teflon tape and that fixed the problem.

    • @URBNBLDRS
      @URBNBLDRS  ปีที่แล้ว +1

      Glad to hear. Those cleanouts can be a bear to seal when they are under pressure

  • @RealMrBitstream
    @RealMrBitstream หลายเดือนก่อน +1

    Does the hot water line insulation go through the studs/blocks? Or just the pex? Seems like it would be a big hole to get the insulation through.

    • @URBNBLDRS
      @URBNBLDRS  หลายเดือนก่อน +1

      The drill hole should be just big enough for the PEX. The insulation is then cut to fit between the studs or joist. It looks continuous but it’s not.

  • @FrancisWong
    @FrancisWong 6 หลายเดือนก่อน +1

    Really great video, going to watch the rest of the series. I was wondering how you vented the dryer? Looks like it's going out through the roof? I might have to do that and was wondering if it's acceptable to just go straight up?

    • @URBNBLDRS
      @URBNBLDRS  5 หลายเดือนก่อน

      Absolutely, roof or wall is fine. Try to keep the vent line as short as possible and with minimal elbows. Maximum length allowed is 35’ from dryer to wall or roof termination. However each 45 degree bend counts as 2-1/2’ and each 90 degree bend counts as 5’. An example would be 20’ of straight duct with (4) 90’s would be considered 40’, which is too long. Also, make sure you have a closing flap (but no screen) on your vent hood. This type of hood prevents critters from entering the duct but allows lint to blow out when the dryer is running. A screen will clog with lint and should only be used on bathroom or range hood exhaust lines.

  • @mrtravelguy7867
    @mrtravelguy7867 2 ปีที่แล้ว

    Thank you man.
    Would you add MST’s only when connecting new framing to existing framing? Or LTP4’s?

    • @URBNBLDRS
      @URBNBLDRS  2 ปีที่แล้ว

      I’m not an engineer, but typically if you aren’t being inspected and don’t have a engineered design you should always overbuild. Take a look at this video…might help. th-cam.com/video/WwU8tGMCTfw/w-d-xo.html

  • @jerrypissonme
    @jerrypissonme 2 ปีที่แล้ว

    Looks great! I wish you could do my 2 car detached garage, I would love an ADU in the back yard!

    • @URBNBLDRS
      @URBNBLDRS  2 ปีที่แล้ว +1

      Ideally if you can keep your garage and add the ADU, that would be my preference. But you can’t beat the ROI on adding an ADU. It should pay for its self in 5 to 7 years.

    • @jerrypissonme
      @jerrypissonme 2 ปีที่แล้ว

      @@URBNBLDRS Yes that would be great but a ADU plus the garage would pretty much take up the whole yard, plus I heard a dethatched garage conversion would be a lot cheaper (depending if the garage could support the extra weight).

  • @joel4210
    @joel4210 2 ปีที่แล้ว

    I have a question. when you call to make appointments for inspections, can you schedule one for just the rough in plumbing? I ask because my situation is different than building from the ground up. I’m finally getting started with my Garage Conversion and trying ti plan accordingly. Thanks

    • @URBNBLDRS
      @URBNBLDRS  2 ปีที่แล้ว +1

      Typically the plan checker will layout the inspections in a certain order, which will follow your work sequence. But to answer your question, Yes you call a separate underground inspection for your sewer and vents. All other rough plumbing will fall under the frame and rough inspection which will allow you to insulate. Hope that helps

    • @joel4210
      @joel4210 2 ปีที่แล้ว +1

      @@URBNBLDRS Sounds good. I appreciate the quick response.

  • @liaoweien
    @liaoweien ปีที่แล้ว +1

    that is awesome! is this the 2nd city inspection? 1st inspection is the foundation. Thanks in advance.

    • @URBNBLDRS
      @URBNBLDRS  ปีที่แล้ว +1

      Typically this is your second inspection. First inspection is your underground sewer. Some cities require a preconstruction inspection, where they look at your overhead electrical lines, and your site survey along with setbacks.

  • @pavgup
    @pavgup ปีที่แล้ว

    I'm super curious, why did you wrap all your linesets in tape? What tape did you use?

    • @URBNBLDRS
      @URBNBLDRS  ปีที่แล้ว +1

      The tape is just to keep the electrical wire and insulation all tight in one line.

    • @pavgup
      @pavgup ปีที่แล้ว

      @@URBNBLDRS ah hah! okay, I was hunting through code books to see if there was a good reason for the tape use! and convenience is never mentioned. nice work and stellar video, you're saving me so much effort with this thorough review.

  • @heyyo2696
    @heyyo2696 2 ปีที่แล้ว

    I want to use copper pipe to my hot and cold water.

    • @URBNBLDRS
      @URBNBLDRS  2 ปีที่แล้ว

      Copper is always a good option. Count the cost vs pex and you may reconsider. Cost of copper has gone up considerably.

  • @bryanlam9886
    @bryanlam9886 2 ปีที่แล้ว +1

    You need a exterior disconnect for the electrical because your panel is in the house. Looks good but that laundry p trap looks ???

    • @URBNBLDRS
      @URBNBLDRS  2 ปีที่แล้ว

      The only exterior disconnect we installed is for the A/C condensor. The entire ADU can be turned off at the breaker in the main electrical panel of the house. Not sure what you mean by the laundry p-trap.

    • @brianbushay8283
      @brianbushay8283 ปีที่แล้ว

      @@URBNBLDRS if your jurisdiction there would need to be an electrical main disconnect on the exterior of the building. Laundry P-trap looks to be 1.5" many jurisdictions want a 2"

  • @marqueemark5917
    @marqueemark5917 ปีที่แล้ว

    Fail that inspection!

    • @URBNBLDRS
      @URBNBLDRS  ปีที่แล้ว

      Nope. To fail is rare.