Gandhinagar-Ahmedabad Metro Rail Phase 2 | Sector1-Motera Stadium | My First Metro Experience
ฝัง
- เผยแพร่เมื่อ 21 ก.ย. 2024
- Prime Minister Narendra Modi inaugurated and flagged off the 20.8 km long corridor of Phase 2 of the Ahmedabad-Gandhinagar Metro Rail project from Sector-1 station in the state capital.
The extension will connect GNLU, PDEU, GIFT City and Gandhinagar’s Sector-1, significantly improving urban mobility between the two cities.
The 33.5 km journey from APMC (Vasna) to Gandhinagar Sector-1 will cost ₹35 and take 65 minutes, offering a much cheaper alternative to taxi or auto-rickshaw rides, which can cost over ₹375 for the same distance.
The metro train will operate from Motera Stadium station to Sector-1 metro station in Gandhinagar from 8 am to 6.35 pm, and from Sector-1 metro station to Motera Stadium metro station from 7.20 am to 7.20 pm.
The Phase 2 extension will cover a 21 km stretch from Motera to Gandhinagar, with a separate corridor reaching GIFT City, enhancing connectivity for residents, professionals, and students.
SUBSCRIBE TO MY CHANNEL.
FOLLOW ME ON INSTAGRAM- sd_modi
#travelvlog
#ahmedabadmetro
#pmmodi
#phase2metro
#ahmedabadgandhinagarmetro
#gandhinagar
It will fulfill all the weak points within a month or two.
It has just started yesterday. Things take time to be smooth.
This metro project is a team work it needs lot of hard work and manpower and totally depends a lot on our loved and needful labours those who are the basic requirements of any construction. So, please have patience.
Hope for the best.
Thank you All
Somehow it’s a very good coverage.🎉🎉
Beautiful video! Lots of planned high-rise residential buildings (similar to China)! Testimony of Ahmedabad-Gandhinagar development and prosperity! Great work by you on this video! Thanks for the video!
I love the way you speak in Hindi. As a non Hindi speaker it was very easy to understand what you said in the video.
Ahmedabad look stunning ❤from Telangana.
Thanks for sharing this much needed info. I always find your blogs very helpful and informative. ❤
Gujarat bahut sundar h
Great coverage of something new 🎉
Suggestions:
- Please mute the audio of the footage while doing voice overs and if required add some matching background score. It will make this experience better.
Good luck 🤞
aur ek line ki zaroorat hai jo red line se shuru hoke aur airport se connect karke shehr ki east side ko cover karegi. Uske banne se ek loop ban jaega jo coverage aur ridership ko badhayega
Pura phase 3 ussi ka hai proper new line banegi
विमल या तमाकू कोई अंदर ना थूके बस, क्यों की हमारे लोगो को इतनी स्वछता की आदत्त नही है न
100%Right
Greenery Area Dekh ke accha laga ❤
save tress 🌴🌲
Puri tarah se shuru nai hua
Speed aji slow che 60 kmph, thoda time ma vadhse 80 kmph thase😊
Sir your video is very informative but I wants to go from sabaramati ashram to Akshrdham Swami narayan temple ....plz suggest how to travel
Good
Modi❤
Good job
Very nice
Abhi sahe speed se nai chal raha he or timming bhe bohot waiting wala he or last metro 6.40 ka he hey
𝚅𝚎𝚛𝚢 𝚗𝚒𝚌𝚎 🙏🙏👏👏
Gandhinagar railway near by metro station kayu che?
Mahatma Mandir, but it’s not ready yet
@@SachinModi1996 motera to sector1 regular jai che pan sanje 7 pm sudhi j?
Total kitne phase he construction 🚧?
Vastral to Gandhi nagar metro tickets price
Aap sidha nai aa sakte motera se aapko metro change Karna padega
@@SachinModi1996 aparla park se badalna padega Gandhi nagar
45rs
@sachin - How much duration does it take to reach from Sector-1 to Motera Stadium?
30 mins
No 30 min
40 min also. More slow
Jackson Ronald Rodriguez Thomas Thomas Kimberly
What is the frequency of metro?
It’s a non stop service. Every 80 to 90 mins
Bogas samay 6e.
1st metro Sector 1 to Motera Station in PF1 after change go PF2 Motera to APEC Station.
No save time.
Modi❤❤