HOW TO PREPARE A WPS FOR PIPELINE AND PIPING; How to write a Welding Procedure Specification (WPS)

แชร์
ฝัง
  • เผยแพร่เมื่อ 17 ธ.ค. 2024

ความคิดเห็น • 11

  • @jharnadey6057
    @jharnadey6057 2 ปีที่แล้ว

    Nice video

  • @amalababu91
    @amalababu91 ปีที่แล้ว

    Absolutely astonished by seeing and learning. Thank You so much Sir 🙏💯✨⚡

  • @amalababu91
    @amalababu91 ปีที่แล้ว

    Thanks 🙏💯✨⚡

  • @mueedd1495
    @mueedd1495 ปีที่แล้ว +1

    Great information.. kindly post a video for impact testing requirements

    • @OilandGas-inspection-soumen
      @OilandGas-inspection-soumen  ปีที่แล้ว

      Thanks Friend! please check my video of mechanical destructive testing, impact test is illaborated.

    • @mueedd1495
      @mueedd1495 ปีที่แล้ว +1

      @@OilandGas-inspection-soumen thanks a lot

  • @guddy406
    @guddy406 ปีที่แล้ว +1

    have a great respect from buttom of my heart. i have a doubt that when we make pwps how we put the data like thickness of base metal travel speed . after pqr we ll do the pwps or before pqr

    • @soumendey1331
      @soumendey1331 ปีที่แล้ว

      Thickness range from applicable qualification code, thickness requirements from project specs. Welding consumables related data shall be taken from manufacturer recommendation and the collected data from experienced welders

    • @guddy406
      @guddy406 ปีที่แล้ว

      @@soumendey1331 I asked a lot of people some said don't write the travel speed heat input current voltage value and some days write from experience. So I got confused to write or not these datas in pwps.

  • @jonesfernando
    @jonesfernando ปีที่แล้ว +1

    sir i think now pwht requirement as per 31.3 is now above 25mm

    • @OilandGas-inspection-soumen
      @OilandGas-inspection-soumen  ปีที่แล้ว

      You are absolutely right!, Whenever we prepare any WPS, we have to follow the applicable latest standards for the project. My video is only to describe the think process while makeing or finalising any WPS.