Spectra QML800 Rigging english

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ก.ย. 2024
  • When it comes to stakeout points to positions for the construction of partitions, high camp or trusses, it is hard work on the knees and sometimes it takes days to bring the marker points with tape measure and pull cord to the desired position. Spectra has developed a new development for exhibition, stage rigging, high shelving and drywall construction, saving you time, money and pain.
    Two Laser QML800G cross the point on the ground with two green laser beams to make the marked points on the floor of a CAD plan of the planning office visible via the supplied Android tablet. You only need to mark the visible crossed point. Each point is automatically displayed until you confirm with "done" and the new position is approached with lightning speed. Thus, a person no longer busy with the measuring, but only with mark! The system is typically 30x30m to 3mm in a hall or entire floor and reduces working hours by about 60 percent. Operating time approx. 16h continuous operation and 10 hours charging time with secured laser class2.
    Incl. 2 QML lasers with batteries, charger, laser glasses, 2 tripods, option CAD software Build-View, 10 inch Android tablet incl. Software and charger, laser pointer, holder, positioning stand incl. Bag, manual and case.

ความคิดเห็น • 2

  • @erikgrijalva6853
    @erikgrijalva6853 3 ปีที่แล้ว

    do they work on slope/ramps,steps..or does it have to be on a flat surface

    • @wolfbunzel
      @wolfbunzel  3 ปีที่แล้ว

      It is a 2D measurement technique that only takes the position into account. However, the surface can also be an inclined surface.