I absolutely love these videos they make me very happy please do more I'd love to see A ghost train and Funhouse build up keep up the fantastic work very proud
Id love to be able to work on the fair! Especially the waltzer. Build up and controls at night. I've got a good MC voice too. It would of been the perfect job for me! 🎪🎡🎠👍👌
@@LiftHillsandThrills yes I think most people that work on the fair has probably been passed down to them through generations. Sometimes I think friends of families help out.. But I'd love it! I should of been born into it 😂👍🙏🎡🎠🎪
Out of all the rides you've shown be assembled, this one definitely seemed the most complicated 😄 It made me laugh when the video ended before it was properly assembled and it cut to you having a blast on it in old footage 😂😂😂
It definitely took the longest this was 9am-5pm footage… but the rest was just platform drops / cars but I was off site at this point, funnily enough my mate Dave recorded a waltzers build up and he only got to this point too 😂 they must leave it a bit or the rest is just an easy add I dunno aha I’m trying to get more but just finding out what’s on site when etc
@@LiftHillsandThrills wow, so it was pretty much a full day just for this one ride? 😯 I'm assuming it would all be quick stuff left... but I know next to nothing about rides, so my assumption is likely wrong 😂 That's cool, I'm looking forward to seeing whatever it may be you post next 😄
@@danielcarr1608 Yeah so Leigh and the team was working on this one and Craig was building Superbowl then Oxygen in the same day so all of these last 3 videos were shot on the same day. Hoping to be on site for the sky swing / Joker / Christmas family coaster build up but I'm not sure when they're going up so just waiting on them to let me know and we'll see what we can sort out :) Still gutted I missed Venom and the Super Star though, they're both VERY interesting rides, might be worth recording a take down of those two, if I reverse the video it'll be a build up right?
@@LiftHillsandThrills Aaaaah, that's cool! I suspected they'd have been the same day as it was the same filming schedule you'd told me the other day, but time had passed so I wasn't sure 😂 These ride names mean nothing to me, but they sound awesome and I really hope you manage to film them being put up 😄 Yes! I'd definitely be up for watching take-down videos of the rides, and it really would make me laugh to see you reverse the footage like that 😂
A jump and smile is on the way but the majority of the rides left to arrive are kids rides with a reindeer coaster that may or may not be added, I was meant to cover the coaster build but I haven’t been told when it’s on site, same with Joker that up until yesterday (to my knowledge) hasn’t arrived yet
@@LiftHillsandThrills This is Leigh Danters new to him and recently refurbished 1989 Arm Waltzer which all the new fairtrade Waltzers are based on build up will get a lot quicker once he gets used to it and finish the alterations he has planned .
Yeah, a lot of people have labelled it as Chris's on other videos (hence the original upload title) when it was Leigh who was working on it all day :) this has been amended
A little sneak peek this one! Get your tickets today ahead of opening November 24 - www.winterwonderlandstoke.com
Well Done, to these Guys, for all there Hard Work, Stephen.
👏
Well done, to these Guys, for all there hard Work, stephen.
👏
I have to wonder how old this ride actually is. The way it is put together definitely suggests the 70's
Good question!
I absolutely love these videos they make me very happy please do more
I'd love to see A ghost train and Funhouse build up keep up the fantastic work very proud
I’d love to do more Shane but all depends what they add next etc and when but glad you liked these!
Id love to be able to work on the fair! Especially the waltzer. Build up and controls at night. I've got a good MC voice too. It would of been the perfect job for me! 🎪🎡🎠👍👌
I'm always curious how people get into this line of work unless you're related to the family who are running the show
@@LiftHillsandThrills yes I think most people that work on the fair has probably been passed down to them through generations. Sometimes I think friends of families help out.. But I'd love it! I should of been born into it 😂👍🙏🎡🎠🎪
Out of all the rides you've shown be assembled, this one definitely seemed the most complicated 😄 It made me laugh when the video ended before it was properly assembled and it cut to you having a blast on it in old footage 😂😂😂
It definitely took the longest this was 9am-5pm footage… but the rest was just platform drops / cars but I was off site at this point, funnily enough my mate Dave recorded a waltzers build up and he only got to this point too 😂 they must leave it a bit or the rest is just an easy add I dunno aha I’m trying to get more but just finding out what’s on site when etc
@@LiftHillsandThrills wow, so it was pretty much a full day just for this one ride? 😯 I'm assuming it would all be quick stuff left... but I know next to nothing about rides, so my assumption is likely wrong 😂 That's cool, I'm looking forward to seeing whatever it may be you post next 😄
@@danielcarr1608 Yeah so Leigh and the team was working on this one and Craig was building Superbowl then Oxygen in the same day so all of these last 3 videos were shot on the same day. Hoping to be on site for the sky swing / Joker / Christmas family coaster build up but I'm not sure when they're going up so just waiting on them to let me know and we'll see what we can sort out :) Still gutted I missed Venom and the Super Star though, they're both VERY interesting rides, might be worth recording a take down of those two, if I reverse the video it'll be a build up right?
@@LiftHillsandThrills Aaaaah, that's cool! I suspected they'd have been the same day as it was the same filming schedule you'd told me the other day, but time had passed so I wasn't sure 😂 These ride names mean nothing to me, but they sound awesome and I really hope you manage to film them being put up 😄 Yes! I'd definitely be up for watching take-down videos of the rides, and it really would make me laugh to see you reverse the footage like that 😂
what are all the rides at winter wonderland this year? saw ur tour is that all of them or more coming good work!
A jump and smile is on the way but the majority of the rides left to arrive are kids rides with a reindeer coaster that may or may not be added, I was meant to cover the coaster build but I haven’t been told when it’s on site, same with Joker that up until yesterday (to my knowledge) hasn’t arrived yet
@@LiftHillsandThrills This is Leigh Danters new to him and recently refurbished 1989 Arm Waltzer which all the new fairtrade Waltzers are based on build up will get a lot quicker once he gets used to it and finish the alterations he has planned .
@@kjb40 Thanks for the update! That’s a great piece of info to know
Good waltzers
Agreed
@@LiftHillsandThrills when pov
@@Funfair79 We hardly spun as a member off staff wasn’t on the platform with us so I never recorded it
Very enjoyable but a shame it’s not the complete build up
Sadly they put Oxygen up next to it so I had to make a choice! Aha
Sadly they put Oxygen up next to it so I had to make a choice! Aha
Just a friendly correction on that it’s not “Waltzers” it’s “Waltzer” as it’s a single machine/ride, other than that a great video
Noted and amended. Funfair noob quickly learning here 😂
🛠️
and they keep on coming! aha
That is Lee's waltzer
Yeah, a lot of people have labelled it as Chris's on other videos (hence the original upload title) when it was Leigh who was working on it all day :) this has been amended
Would this not be a modern ride? Rides from the 70's would be built completely from scratch and not self contained on a trailer
Can't answer this I'm afraid, I just simply watched it going up
They may be modern and might’ve been upgraded throughout the years