  • The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
    The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
    Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route.
    The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads.
    The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.
    The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.
    It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge.
    The project was delayed and actual construction began in May 2014. Currently, a 9.7-kilometre (6.0 mi) segment between Kapar and Bukit Raja, a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan and a 45-kilometre (28 mi) segment from Lekir to Beruas are opened to traffic.
    Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
    #wce #shahalam #selangor #malaysia #fawwazmedia
    --------------------
    Ultra by Savfk | / savfkmusic
    Creative Commons / Attribution 4.0 International (CC BY 4.0)
    creativecommon...

ความคิดเห็น • 17

  • @izzaniielachannel
    @izzaniielachannel ปีที่แล้ว

    Terbaik selalu perkongsian nye min

  • @mdcpq96
    @mdcpq96 ปีที่แล้ว +8

    Nampaknya banyak orang tknak lepaskan tanah utk highway ni

  • @user-zj2qw1xj6d
    @user-zj2qw1xj6d ปีที่แล้ว

    Thank you updating

  • @nalaventhanarojunan6632
    @nalaventhanarojunan6632 11 หลายเดือนก่อน

    Thanks brother... We are losing our mother land for this highway.What to do...😢

  • @mohdadly8871
    @mohdadly8871 ปีที่แล้ว

    Agaknya WCE bhgian ni akan jdi mcm kes highway di luar negeri..Rumah di tgh2 highway...

  • @user-sk9pj9dw7l
    @user-sk9pj9dw7l 11 หลายเดือนก่อน

    WCE VS CSR mana siap dulu??...tunggu

    • @anaqifirash4819
      @anaqifirash4819 4 หลายเดือนก่อน

      Csr akan siap dlu.. Wce lambat psl isu tuan tanah xnk lpskn.. Pakat dok main hrga gitu la

  • @FaizAris
    @FaizAris ปีที่แล้ว

    👍🏻❤️😊

  • @juwahirali
    @juwahirali ปีที่แล้ว +1

    mereka tak puas hati dengan pampasan, tetapi kerajaan ada hak keatas tanah kerana pembangunan. dalam kanun tanah negara.

    • @kaijunlim7970
      @kaijunlim7970 9 หลายเดือนก่อน

      sbb tanah tu bukan mereka punya, tanah tu milik kerajaan sbnrnya

    • @anaqifirash4819
      @anaqifirash4819 4 หลายเดือนก่อน

      Even ade geran skli pn, klu kerajaan brtegas nk ambil, kne jgk..

  • @Clickhere_travel-xi2pl
    @Clickhere_travel-xi2pl ปีที่แล้ว +1

    Nampaknya macam projek WCE ni akan terbengkalai mcm tu je sbb banyak sgt kwsn nak diambil alih.. dah tentu byk pampasan nak dibayar pada kilang dan rumah haram tu

  • @Zichoe
    @Zichoe ปีที่แล้ว +1

    Akan jadi seksyen yang paling lambat nak siap

  • @davecks3042
    @davecks3042 ปีที่แล้ว

    Satu projek yang dirancang untuk kaut duit dan bukan untuk dirancang untuk kebaikan rakyat . Terlalu ketara dengan banyak tempat yang belum di pindah. Super poor planning