HS2 Old Oak Common

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ธ.ค. 2022
  • In today's video I'll be giving some background information about Old Oak Common and we'll be taking a look at some of the progress so far.
    You can help support the channel over on Patreon: / chris_rf_cg
    alternatively if you'd like to buy me a coffee you can do so on my Ko-Fi page: ko-fi.com/chrisrfcg
    or by making a purchase on my Redbubble photography page: Prints, Mugs, T-shirts and much more: www.redbubble.com/people/EngP...
    HS2 video playlist: • HS2
    Blog: engineeringfocusblog.blogspot...
    Twitter: / engfocus
    Facebook / engineeringfocus
    Discord: / discord
    Instagram: engfocus
    #Rail #RollingStock #Railway

ความคิดเห็น • 78

  • @Rail_Focus
    @Rail_Focus  ปีที่แล้ว +1

    Rail photography on Redbbuble, prints, mugs, t-shirts and much more: www.redbubble.com/people/EngPhotography/explore?page=1&sortOrder=recent

    • @nemo6686
      @nemo6686 ปีที่แล้ว

      _Why_ will this "*undoubtedly* have a positive impact on the surrounding area"? It may well do so, but it's far from unknown for major developments to succeed with limited benefit - if not outright detriment - to its immediate environs. Examples of this might be the ring of under-developed areas abutting the City of London, or Heathrow's impact on surrounding villages.
      "Undoubtedly" really needs some justification here.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      @@nemo6686 perhaps in isolation the impact could be limited, but if the public realm improvement are delivered and further improved connectivity with Central and Overground lines I can't see how it won't have a positive impact. With the connectivity provided it'll certainly be a desirable place to live.

  • @ManicXD
    @ManicXD ปีที่แล้ว +20

    The sheer scale of these new pieces of infrastructure is surprising, as you'd think that it'd just be some simple stations, cuttings, and small tunnels, but not this project it seems. Fascinating to see it all develop!

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +8

      Every part of the project seems colossal. Only had a chance to look at the footage properly during editing and was surprised by how much activity was going on on this one site.

  • @justice4da97
    @justice4da97 ปีที่แล้ว +2

    I live next to the station, when l was 15, me and my friends use to break into the eurostars just to chill inside the train.

  • @philwoodward5069
    @philwoodward5069 ปีที่แล้ว +7

    The link between Old Oak Common and the Overground Willesden-Clapham Junction line is being misunderstood by the government if they think it's a local project principally for the benefit of Londoners that should be funded by TfL.
    Southern already run trains on that route and there's no reason why they couldn't run some of their semi-fast Brighton-Gatwick-London services into Willesden Junction instead of Victoria if it would have a connection to HS2 (as well as the Elizabeth Line and GWR).
    Clapham Junction is one of the busiest stations in Europe any way you measure it - by passenger numbers, number of trains calling or number of destinations served directly. Linking it to Old Oak Common would benefit regional and long-distance travellers much more than people making local trips. The connection should be funded centrally as part of the project.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +3

      Indeed, as always the DfT is being short sighted. OOC could become the Stratford of the West if further connections were added.

    • @DavidKnowles0
      @DavidKnowles0 ปีที่แล้ว +1

      @@Rail_Focus But rather than do a job properly the first time, they rather do a bodge job and then spend more money into the future fixing it.

  • @jermainetrainallen6416
    @jermainetrainallen6416 ปีที่แล้ว +15

    Great vid. Old Oak Common will certainly be a substantial hub for intercity services. I can't wait for the day the huge roof superstructure starts to be built. It will be fascinating to see but until then, let's hope for more progress on the station box and also the GWML station.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +3

      Thanks, it'll certainly be interesting to see how they build the GWML station, trying to build on an active railway brings its own challenges.

    • @beecee2205
      @beecee2205 ปีที่แล้ว

      take you 30 mins to get from Old Oak Nowhere to anywhere useful. and it you think thats what passangers want you are a total idiot.

  • @liveevil6386
    @liveevil6386 ปีที่แล้ว +7

    The depot at old oak has been waste of space for decades. This is amazing use of what is already here

  • @kwlkid85
    @kwlkid85 ปีที่แล้ว +13

    If a HS2/HS1 link ever gets built I wonder if this will ever become Old Oak Common International.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +6

      It's probably unlikely unfortunately, however I think that was one of the original ideas for passport control to be done at OOC.

    • @kwlkid85
      @kwlkid85 ปีที่แล้ว +7

      @@Rail_Focus If HS2 actually gets fully built the pressure to build the link will probably be enough to get it built. Using OOC and Stratford as west and east international hubs makes a lot of sense to me as even many places not directly on the high speed lines would have easy 1 change connections onto international trains.

    • @lordgemini2376
      @lordgemini2376 ปีที่แล้ว +2

      @@kwlkid85 I've always thought a specific tunnel linking OOC and Stratford International should be the way to create a HS2-HS1 link. So journeys from let's say Manchester could go: Manc Piccadilly - Birmingham Interchange - OOC - Stratford Interntaional - Ebbsfleet - Ashford - onto Europe. Idk how feasible it is but it's very interesting!

    • @kwlkid85
      @kwlkid85 ปีที่แล้ว +1

      @@lordgemini2376 That's pretty much what was planned before it got cancelled. A tunnel would have linked the 2 lines bypassing Euston and St Pancras.

    • @kwlkid85
      @kwlkid85 ปีที่แล้ว

      @@peterwilliamallen1063 Because we should be reducing plane travel as much as possible. A link would enable international services from places like Manchester, Birmingham etc. HS2 and HS1 terminate very close to each other and a link was always planned but has been temporarily killed due to nimbys.

  • @AndrewG1989
    @AndrewG1989 ปีที่แล้ว +2

    Old Oak Common HS2 station will be massive and with National Rail and Elizabeth Line to serve the new station once it’s completed. And 2 new London Overground stations to be built near to the new HS2 station.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +1

      Let's just hope the Overground stations are built, as currently there's no funding for them.

    • @AndrewG1989
      @AndrewG1989 ปีที่แล้ว

      @@Rail_Focus Indeed

  • @joshuablyth1138
    @joshuablyth1138 ปีที่แล้ว +2

    I have the great privilege of working on this site as an apprentice engineer, our package of work is to expand and lower old oak common lane as well as demolish and expand the mainline bridges that will lead into the station, videos don't do justice of how vast this site is.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +1

      It's definitely difficult to show the true scale of the project from the ground. Best shot was the one on the Elizabeth line, which shows just how big the station site is.

  • @elfyn2005
    @elfyn2005 ปีที่แล้ว +2

    Wish there was more rail connections in mid wales :(

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      There should be, we need both 🙃

    • @elfyn2005
      @elfyn2005 ปีที่แล้ว

      @@Rail_Focus I love the idea of HS2 tho, even tho I won't be able to use that often

  • @SirKenchalot
    @SirKenchalot ปีที่แล้ว +2

    It seems so odd to have a stop so soon after leaving Euston or Paddington. Why didn't they just make this the terminus or terminate at Paddington where all the same connections could be made?

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +4

      If they terminated at Paddington they'd still have to build a new station as there's nowhere near enough space to terminate 17tph at Paddington.
      OOC provides good connectivity, but passengers still expect to be able to travel to central London and Euston provides connections to places not served by the Elizabeth line.
      Also Euston is a short walk from St Pancras for service to the Continent.

  • @slimchris113
    @slimchris113 ปีที่แล้ว +2

    I heard network rail and chiltern wants to make an extension to terminate at OOC I wonder how that will happen

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +2

      Interesting, definitely seems as if OOC could become the Stratford of West London.

    • @slimchris113
      @slimchris113 ปีที่แล้ว

      @@Rail_Focus Most definitely

  • @FlorianHWave
    @FlorianHWave ปีที่แล้ว +1

    There should be a bypass of London via Heathrow, just like in Paris. Or at least some non-stop connection between HS1 and HS2. Because the Eurostar doesn't really connect England with mainland Europe, it only connects London with mainland Europe.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +2

      I'm not sure there's the demand to justify the infrastructure to connect HS2 to HS1 A covered walkway or pedestrian tunnel with travelator between Euston and St Pancras would probably be adequate. Euston and St Pancras really aren't that far apart.
      A new station at Old Oak Common on the London Overground line could be beneficial for reaching South London though.

    • @FlorianHWave
      @FlorianHWave ปีที่แล้ว

      @@Rail_Focus Example:
      Try going from Paris to Birmingham. You have to take the Eurostar to London and then change there. The Eurostar is delayed, you miss your connection and since they are two different operators, no one has to give you a refund or rebook your journey. More time lost, more money lost and next time you decide to just fly instead, to avoid all of this hassle and save time and money.
      Classic example.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +1

      @@FlorianHWave there will be 3 HS2 trains per hour and at least 2 classic services per hour to Birmingham, so missing a connection isn't the end of the world. But ticketing should be sorted out, you should be able to book a single ticket from the North to the continent.

    • @FlorianHWave
      @FlorianHWave ปีที่แล้ว

      @@Rail_Focus Missing a connection is a problem if reservation is mandatory, which is usually the case for high-speed trains, and only if re-booking your ticket is free. And since HS2 and Eurostar are two different operators, there is no need for either of them to refund you or rebook you.

    • @FlorianHWave
      @FlorianHWave ปีที่แล้ว

      @@peterwilliamallen1063 I know.

  • @Rail_Focus
    @Rail_Focus  ปีที่แล้ว

    Intro Music by Steve ▶️ th-cam.com/video/IxAjfDvxQcU/w-d-xo.html ◀️

  • @marksinthehouse1968
    @marksinthehouse1968 ปีที่แล้ว +1

    What gets on my nerves now is people still saying cancel it it too far gone ,imagine all these construction sites left ,let’s get it done and were possible extend it to Scotland etc

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +5

      Absolutely, we're definitely passed the point of no return now. Cancelling it now would be a monumental waste and wouldn't save any money now.

    • @DavidKnowles0
      @DavidKnowles0 ปีที่แล้ว +2

      HS2 is now apparently under another government review, which will probably mean more chopping an changing of plans, which will probably mean more wasted money.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +2

      @@DavidKnowles0 let's hope the section to Manchester survives. The arm to East Midlands is still on the map for now, but it's probably years off a plan being presented to Parliament.

  • @richardr7434
    @richardr7434 ปีที่แล้ว

    Birminghan ??? Where’s that then ?

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      Not sure ? ? ? 🤷

    • @richardr7434
      @richardr7434 ปีที่แล้ว

      @@Rail_Focus 44 seconds in:" Birminghan and the North"

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      @@richardr7434 okay, would just been easier to say there's a typo to begin with. Sometimes things slip in. 🙃

    • @richardr7434
      @richardr7434 ปีที่แล้ว

      @@Rail_Focus it's a joke mate, no need to be touchy about it, I'm not your proof reader 🤪

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      @@richardr7434 sorry, just used to getting sarcastic comments when I make genuine mistakes. And I hate mistakes creeping in 😅

  • @Tez_Thorn1405
    @Tez_Thorn1405 ปีที่แล้ว +1

    So progress,not an awful lot then 🤣

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      They built a conveyor and a temporary office 😛

    • @mikehindson-evans159
      @mikehindson-evans159 ปีที่แล้ว

      Seven metres down, eight metres to go before reaching HS2 track level; that is actually a LOT of progress.

  • @lukepollard2202
    @lukepollard2202 ปีที่แล้ว +2

    What, a high-speed train not designed for high-speed. No wonder the Chinese turned it down.. what a waste of money...typical. tories...

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      Eh 🤷

    • @lukepollard2202
      @lukepollard2202 ปีที่แล้ว

      Which it don't you understand ? The narrator clearly said its been designed for capacity not high speeds

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      The bit where you don't seem to understand what HS stands for. The new railway is primarily for capacity, but trains will be able to travel at between 200-225mph.

    • @lukepollard2202
      @lukepollard2202 ปีที่แล้ว

      Uour error mate not mine...

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว

      @@lukepollard2202 if you say so 🤣🤣🤣🤣

  • @beecee2205
    @beecee2205 ปีที่แล้ว +3

    The New Terminus. Nowhere. Absolutely nowhere. Which is great, cus Curzon Street is nowhere in Brum as well. What a con job

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +2

      Lol, it's not the new terminus, that "story" was rubbished early on this afternoon. Curzon St is also in Birmingham City centre, a very short walk from New St and right next door to Moor St.

    • @beecee2205
      @beecee2205 ปีที่แล้ว

      @@Rail_Focus all sorts of stories are rubbish. I remember when hs2 was going to leeds. I bet that was rubbished. I remember when hs2 was gonna cost 49 billion. thats been rubbished. its all rubbish hs2. curzon street is 20 mins from new street btw. about the time saved from London to Brum. Mind you thats been rubbished as well.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +1

      @@beecee2205 the "story" was broken by the S*n and quickly and strongly denied, but if you'd rather believe bs from the S*n you crack on. Curzon St is not 20 minutes away, that's a made-up nonsense figure which I've no idea where you got it from, probably reading The S*n 🤣

    • @ds1868
      @ds1868 ปีที่แล้ว +1

      @@Rail_Focus It is an interesting issue though. The section between Old Oak Common and Euston will cost at least £15 billion, but that may well rise due to inflation. Also with the cancellation of crossrail 2 there is going to be major problems dealing with passenger flow at Euston. It's doubtful the current underground network will cope. Finally passengers can use the Elizabeth line to central London from OOC. There is a logical argument to it, based mainly on cost. It was rejected by the Chancellor but it doesn't mean there may be revisions if the economy continues to stagnate.

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +1

      @@ds1868 it may be an interesting debate, but it's not straightforward as just saying cancel Euston and terminate at at OOC. The station box at Old Oak is already nearing completion, so to change it at this point would be extremely costly. 6 platforms simply wouldn't be enough to serve beyond Birmingham in the long run. Also there's a lot riding on Euston in terms of redevelopment, the OSD will in part fund the new station, without which it's unlikely the area around Euston wouldn't be redeveloped. So yes it's costly, but it's too late in the game to cancel.

  • @nopants3560
    @nopants3560 10 หลายเดือนก่อน +1

    maybe you want to remake this video?

    • @Rail_Focus
      @Rail_Focus  10 หลายเดือนก่อน

      Why?

  • @lukepollard2202
    @lukepollard2202 ปีที่แล้ว +1

    What, a high-speed train not designed for high-speed. No wonder the Chinese turned it down.. what a waste of money...typical. tories...

    • @Rail_Focus
      @Rail_Focus  ปีที่แล้ว +1

      Why not both 🤷. 225mph 400km/h not fast enough for you?