The METRO Junction That Will Change Mumbai Forever !

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ก.ย. 2024
  • Call Now to Vist Arya constructions Codename Kingsize - 022 41495846
    #ad
    #mumbaimetro
    #mumbai
    Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 20.75 kilometres (12.89 mi), and the route will be completely elevated. The total cost of the construction is planned to be Rs 4,132 crore. MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 18 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city. Delhi Metro authority show red flag to Kalyan-Dombivli-Taloja Metro line.
    Mumbai Metro 14.
    The magenta line will cross the areas of Badlapur, Ambernath, Nilje, Shil Phata, Mahape, Ghansoli and eventually cross the Thane Creek to reach the Greater Mumbai limits at Kanjurmarg. In all, there will be 15 stations along the corridor with 13 of them being elevated, one each underground and at grade. The possibility of more stations getting planned along the alignment is not ruled out, at this juncture.
    🔔 Join this channel to get access to perks:
    / @powertrain
    OUR OTHER CHANNELS
    ⚪VLOG CHANNEL - / @aakashbhavsar2342
    ⚪FOOTAGE DEMOCRACY - / @footagedemocracy3663
    ⚪SHORTS CHANNEL - / @powershorts1068
    FOLLOW US ON
    ⚪INSTAGRAM 1 - / aakash_rb
    ⚪INSTAGRAM 2- / powertrain_yt
    ⚪FACEBOOK - / powertrainofficial
    ⚪TWITTER - / powertrain_yt
    ⚪DISCORD - / discord
    _____________________________________________________________________
    INTRO MUSIC IF PRESENT - LEMMiNO - A THOUSAND YEARS
    • LEMMiNO - A Thousand W...
    CC BY-SA 4.0

ความคิดเห็น • 123

  • @PowerTrain
    @PowerTrain  ปีที่แล้ว +19

    Call Now to Vist Arya constructions Codename Kingsize - 022 41495846

  • @aashishmhankale2326
    @aashishmhankale2326 ปีที่แล้ว +95

    Awaiting for "Mumbai Metro 14"

    • @XenithForPm
      @XenithForPm ปีที่แล้ว +4

      mumbai metro ka choda

    • @Amoghavarsha.
      @Amoghavarsha. ปีที่แล้ว +12

      Power train ❌
      Mumbai train ✅

    • @vilaspatil9694
      @vilaspatil9694 ปีที่แล้ว +6

      Awaiting for Metro 14🎉🎉😮😊

    • @TiwariAbhishek_
      @TiwariAbhishek_ ปีที่แล้ว +2

      Gaon vaale

    • @shan25873
      @shan25873 ปีที่แล้ว

      ​@@Amoghavarsha.Bcoz it's Mumbai❤

  • @TesttestTest-i4k
    @TesttestTest-i4k ปีที่แล้ว +26

    Palava will be connected to taloja great asset for people who work in taloja midc . Mostly people with 30 k salary

  • @carresgupta7314
    @carresgupta7314 ปีที่แล้ว +32

    What will happen to Mira-Virar section peopleee??? In western line during peak hours mostly every Fast Local (Churchgate-Virar) is tightly crowed till Nallasopara. It feels like citizens of Mira-Virar are totally left out. #AskPT

    • @ShivBalram
      @ShivBalram ปีที่แล้ว +4

      mira road walo ki to izzat hi nahi.... virar nalasopara se full pack hoke aata he train... Bhayandar jao or return maro. usme bho Bhayandar se frequency hi nhi.. 1 hour me 1 2 train...... latakne ke liye bhi place nahi

    • @abhinavpanchal6806
      @abhinavpanchal6806 ปีที่แล้ว +5

      Dont know about Virar, but Mira road Bhayander ke liye to metro ban rahi hai

    • @ShivBalram
      @ShivBalram ปีที่แล้ว

      @@abhinavpanchal6806 or 3 sal jayega

    • @cheemterastrial9399
      @cheemterastrial9399 6 หลายเดือนก่อน

      Now coastal road is going to be extended till virar, check latest news

    • @carresgupta7314
      @carresgupta7314 6 หลายเดือนก่อน +2

      @cheemterastrial9399 roads are for people with private cars/bikes who have money to fuel it. Majority highly depends on public transport!

  • @beautifulworld6037
    @beautifulworld6037 ปีที่แล้ว +18

    Very good kanjumarg badlapur line very good planning 😂😂😂 Mumbai needs more elevated railway and roads

    • @raxonn
      @raxonn ปีที่แล้ว +9

      At first i also thought that but its really good planning, all people working near Kanjurmarg ghatkopar, Student near powai and all can take Badlapur metro directly, because by local we have to go through thane and kalyan which are in north and adds extra distance, people working in navi mumbai, Airoli will also board the metro and deboard ar Ambarnath and badlapur and people who wanna go to karjat can deboard at badlapur and take local for karjat

    • @yogesh099999
      @yogesh099999 ปีที่แล้ว +1

      Thanks @Powertrain. You make very insightful videos. But line 14 work is not even started. It will take another 20 years to be built. Out government is like 'BADI BADI BAATEIN, VADA PAV KHAATE'

  • @preetamupadhyay1776
    @preetamupadhyay1776 ปีที่แล้ว +16

    Waiting for metro in Kalyan Dombivli region ❤

    • @samppp8158
      @samppp8158 ปีที่แล้ว +1

      Property rates in KDMC will sky rocket in a few years

    • @selmonbhoi6091
      @selmonbhoi6091 ปีที่แล้ว

      Me too. I live in Sagaon near MIDC in Dombivli. Where do you live ?

    • @jitheshshetty4129
      @jitheshshetty4129 ปีที่แล้ว

      @@selmonbhoi6091 i too live in sagaon

    • @selmonbhoi6091
      @selmonbhoi6091 ปีที่แล้ว

      @@jitheshshetty4129 Bhai Bhai 🤙😁

    • @nishilbright2007
      @nishilbright2007 ปีที่แล้ว

      Mostly useless for dombivli station area and west other than mankoli bridge which is also without a railway bridge flyover

  • @Ronny-Loy
    @Ronny-Loy ปีที่แล้ว +2

    Totally sponsored video, यह सभी डेवलपमेंट होने में लगभग 10 से 15 साल का समय लगेगा फिलहाल यह एरिया बहुत ही बकवास और भंगार है

  • @kapilughade164
    @kapilughade164 ปีที่แล้ว +3

    Thanks for making a video on this topic are really appreciate and I live in this part only ❤

  • @navnathsurvase3490
    @navnathsurvase3490 ปีที่แล้ว +9

    all metro lines in Mumbai.... Maharashtra govt give metro construction projects to
    UPMRC instead of MMRCL..

  • @sayali.navare
    @sayali.navare หลายเดือนก่อน

    Keep updating metro information....

  • @KRISHNA-xn3ug
    @KRISHNA-xn3ug ปีที่แล้ว +7

    Orange line 14 Ulhasnagar main se bhi cross hogi na

    • @svk0071
      @svk0071 ปีที่แล้ว +2

      Yes there will be an extension till Ulhasnagar

    • @dipakvanikar6254
      @dipakvanikar6254 หลายเดือนก่อน

      ​@@svk0071VERY GOOD 👌👌

  • @Amoghavarsha.
    @Amoghavarsha. ปีที่แล้ว +6

    Power train ❌
    Mumbai train ✅

  • @abhishek_kamath
    @abhishek_kamath ปีที่แล้ว +5

    #ASKPT Vasai-Virar MMR me nahi aata kya? Why isn't there any metro updates?😮‍💨

    • @Pubgxrgaming5228
      @Pubgxrgaming5228 ปีที่แล้ว

      Aate he bro

    • @user58126
      @user58126 ปีที่แล้ว +1

      Shitti is the main reason. They have no vision. Fr vv City could have been so much better but local politics messed up the city. This city is now totally unplanned with all kinds of shady people from all over the country moving in and creating the worst of worst neighborhoods hood in the city. Especially nala sopara. Vasai Virar is still better but NSP is worse fr. It's like Kurla Mumbra Mira road but on steroids 😂😂

  • @sourabhkedare672
    @sourabhkedare672 10 หลายเดือนก่อน +1

    Please make a update video on metro line 14.... explain its significance and its need....

  • @Bhushan2602
    @Bhushan2602 ปีที่แล้ว +1

    Ai se female ki aavaj ko male me kiya hai kya 6:23

  • @siddo.
    @siddo. ปีที่แล้ว +3

    metro should be extended till shahad and titwala

  • @rajeshacharya6202
    @rajeshacharya6202 ปีที่แล้ว +3

    Navi Mumbai airport or metro ka toh vaitaag aya hai🤦‍♂️.kab hoga pata nhi.
    Vaitaag dila ahe ya project ne,project mule property mahag jhali ahe.

  • @niteshvishwakarma7759
    @niteshvishwakarma7759 ปีที่แล้ว +1

    Mumbai dream City proud

    • @MrBlueice07
      @MrBlueice07 9 หลายเดือนก่อน

      Ghanta

  • @akshatmathur4521
    @akshatmathur4521 ปีที่แล้ว +1

    2 BHK is 646 sq feet !!!!!!!!! Whatt ? How can a family live in such a small place?

  • @sunilmohandas912
    @sunilmohandas912 ปีที่แล้ว +1

    Why is metro -8 not fully underground ????

  • @pranavingale6850
    @pranavingale6850 ปีที่แล้ว +1

    Correction orange line ka start Kalyan West se chalu ho Raha hai, Kalyan East se nai

  • @jayeshmahajan6764
    @jayeshmahajan6764 24 วันที่ผ่านมา

    Please bring video of all updates of all 14 metro line current status

  • @tvssajet
    @tvssajet 3 หลายเดือนก่อน

    Kalyan Dombivli Ambernath Badlapur connecting to Kanjurmarg 4 lanes ke saath chahiye Fast trains ks jaise Fast metro ke liye 2024 mein daily ka load (to-from-both way) 3 lakhs ka already Railway bear kar rahi hai

  • @kailashchatterjee4350
    @kailashchatterjee4350 ปีที่แล้ว

    mumbai aur india ke infra projects tej gati se announce ho rahi hain lekin bahut slow implementation hone ki wajah se yeh hamesha demand curve ko lag karta hai...
    agar ek skywalk banane me 10saal lag jaate hain, to sea link banaane me 25saal lag jaayenge..
    agar china se competition karni hai infra projects complete karne me 4 guna speed badhaani hogi

  • @rksreepansh
    @rksreepansh ปีที่แล้ว

    Kb tak sare metro line start honge and jitni jldi hogi utna accha❤

    • @gameking855
      @gameking855 ปีที่แล้ว +1

      Jab taiyar hogi bheed 5x bhadh gyi hogi. Finally it will be of no use.

  • @10swapnilchikane52
    @10swapnilchikane52 ปีที่แล้ว +8

    #askpt what do you think about development in diva junction?

    • @abhishekcpadwal1989
      @abhishekcpadwal1989 10 หลายเดือนก่อน

      Soon a diva local will be started is wat I have heard as also platform 1 is being built. Escalators are being installed at the stations. East-west fly over bridge is being built. A half at Diva for express trains is required as most people have to travel to Thane!

  • @abhishhk.
    @abhishhk. 11 หลายเดือนก่อน

    thane - kalyan - bhiwandi
    natural growth he
    bewaja south side push kr rhe he growth navi mumbai me

  • @nikhilgawade5657
    @nikhilgawade5657 หลายเดือนก่อน

    Kanjurmarg badalapur line ka kam kab chalu hoga?

  • @ShubhamYadav-ph6fu
    @ShubhamYadav-ph6fu ปีที่แล้ว +9

    Bhai Mumbai k alawa or bhi new diya karo

    • @raykk6409
      @raykk6409 ปีที่แล้ว +1

      its BOMBAI NEWS

    • @AsperK.22
      @AsperK.22 ปีที่แล้ว +3

      Woh deta hai bhai magar news rehna bhi toh chahiye 😂

  • @kapilughade164
    @kapilughade164 ปีที่แล้ว +1

    Arya construction that was all video for😂

  • @raghunathwaradkar4523
    @raghunathwaradkar4523 ปีที่แล้ว

    Hearing from dombivli ❤❤

  • @Nazim786
    @Nazim786 ปีที่แล้ว +1

    Bro plz make video on Bhiwandi city & metro line 5 phase-1(Thane to Bhiwandi) update.😊

  • @pulkit4286
    @pulkit4286 ปีที่แล้ว +1

    Pls make a video on mumbai metro line. 3

  • @AngryResidenceOfficial13
    @AngryResidenceOfficial13 ปีที่แล้ว +1

    Lagta hai ab mumbai mein bhid kam hogi north indians ab phir se chale jayenge (auto,tax,private drivers,watchman) after bmc election illegal stalls on footpath) up cm yogi should now do fast development in up because all will come back in 2/3 years

  • @TrueIndian17
    @TrueIndian17 ปีที่แล้ว

    Manpada Dombivli ❤❤

  • @akshaykulkarni5691
    @akshaykulkarni5691 9 หลายเดือนก่อน

    When will this Manpada line start?

  • @nareshpurushottam3203
    @nareshpurushottam3203 4 หลายเดือนก่อน

    Bhayander se virar line 14 kab hoga kya problem hai

  • @DILIPBPALSU-TubeChannel
    @DILIPBPALSU-TubeChannel ปีที่แล้ว

    What about metro 8 goldline

  • @Ampt83
    @Ampt83 8 หลายเดือนก่อน

    Can you please update on Metro line no 10.

  • @deshmukhrock
    @deshmukhrock ปีที่แล้ว

    Metro 5 any update

  • @jatin_31206
    @jatin_31206 ปีที่แล้ว +1

    Tax toh sabhi Indians dete hai. toh government sirf mumbai par hi focus kyu karti hai. humara city ko bhi develope karna chahiye aur agar nahi karna toh humse tax phir na le. hum kyu mumbai ke development ke liye apne paise de.

    • @At_sk
      @At_sk ปีที่แล้ว

      Mumbai easily generates enough output to fund it's own development. Please don't spread confusion. Your city probably doesn't generate anything and if you're from South, your tax must be going to North, not Mumbai. Plus over past many years, Bangalore/NCR/Hyderabad/Pune have seen considerable growth overtaking Mumbai in many aspects. Example: 390km delhi metro vs less than 60km Mumbai metro.

  • @SrinivasRao-ry9cm
    @SrinivasRao-ry9cm 3 หลายเดือนก่อน

    Project will be completed post end of kaliyug

    • @tvssajet
      @tvssajet 3 หลายเดือนก่อน

      😂😂😂

  • @spandy9392
    @spandy9392 ปีที่แล้ว

    Great content 😊
    Do make more videos about mmr region

  • @shahealamshaikh5072
    @shahealamshaikh5072 11 หลายเดือนก่อน

    Bhai mumbra ke liye kya hoga

  • @kashu0.156
    @kashu0.156 ปีที่แล้ว

    Taloja metro kab chalo hoga bhai

  • @omkar2810sarvajanik
    @omkar2810sarvajanik ปีที่แล้ว +1

    Mumbai ke hi do yaha ke sab mumbaikar hai

  • @KKN7000
    @KKN7000 ปีที่แล้ว +1

    2-4 youtubers hai jo ache the, various topics pe video banate the but ab wo 1 chiz k piche obsessed ho gaye
    Like Adam something is obsessed over removing cars from road, Atlas Pro over biogeography and now Power Train over, well "Trains"

  • @asishpadhy801
    @asishpadhy801 ปีที่แล้ว +3

    Mumbai mumbai mumbai and mumbai...Unsubscribe kar raha hun bhai...daal jitna dalna hai mumbai ka video

  • @shivamsingh-nb6rw
    @shivamsingh-nb6rw ปีที่แล้ว +3

    Bro I like your video but please make more videos on railway projects

  • @jaydeep85
    @jaydeep85 3 หลายเดือนก่อน

    Badlapur, Karjat are green areas where people go for weekend getaways. Development in these areas will destroy the nature and importance of these areas.

  • @gk_B
    @gk_B ปีที่แล้ว

    Can you make a video on legalized corruption🙏

  • @jaydeep85
    @jaydeep85 3 หลายเดือนก่อน

    Growth (no) - Ecological Destruction (yes)

  • @raykk6409
    @raykk6409 ปีที่แล้ว +2

    Bombai news

  • @selmonbhoi6091
    @selmonbhoi6091 ปีที่แล้ว

    Jab tak Maharashtra ka CM Eknath Shinde rahega, tab tak Thane district ka development hota rahega

  • @vikramm939
    @vikramm939 ปีที่แล้ว

    Road infrastructure is poorest over here.. KDMC will never come to the standards

  • @niraj2020
    @niraj2020 ปีที่แล้ว

    Mumbai open ground, footpath, widened road, encroachment free footpath, uniform line of shops. Residence on roadside, encroachment free railway land encroachment. Mumbai biggest problem is lack of parking area.
    If you look at China from any city, plenty of free parking available across China. In India filthy road, footpath and surrounding, no better garbage and waste management. Poor public transportation, cleanliness affecting india's image.

  • @ProphetJagtap
    @ProphetJagtap 10 หลายเดือนก่อน +1

    Mumbai already has many travel options so metro will not give any profit
    Metro at badlapur will give lot of revenue to government than in main city

    • @atharvatar
      @atharvatar 7 หลายเดือนก่อน

      metro till badlapur will take around 1.5 hrs to reach central mumbai so it will be faster with local trains

  • @sunilmohandas912
    @sunilmohandas912 10 หลายเดือนก่อน

    MTHL landing area in Ulwe is barren, no modern infra

  • @obitoxic04
    @obitoxic04 ปีที่แล้ว

    Pls keep channel name "power mumbai"

    • @At_sk
      @At_sk ปีที่แล้ว

      Or you could hope someone from your city could take responsibility to cover the developments there instead of venting anger here.

    • @obitoxic04
      @obitoxic04 ปีที่แล้ว

      @@At_sk dude he litreally makes every special video about mumbai i myself from mumbai now more about mumbai than anything 🫠

    • @At_sk
      @At_sk ปีที่แล้ว +1

      @@obitoxic04 you confused him with a govt funded entity that is required to make videos on every city🤔. He's literally and independent youtuber who can chose what videos to make. He, his team might too be from Mumbai and have limitations how much they can explore with whatever sponsorship/ money they can get.
      Like this video for example...total bs in terms of made up model upcoming junction that will turn very important in future. Must be sponsered by some builders in that faraway area😂

  • @23jun-qj2sm
    @23jun-qj2sm ปีที่แล้ว

    You cannot commit suicide under Mumbai metro. Bank pensioners please note

  • @surbxd
    @surbxd 8 หลายเดือนก่อน

    Thanks lord shivsena disolved!

  • @Advait2424
    @Advait2424 ปีที่แล้ว

  • @Bhushan2602
    @Bhushan2602 ปีที่แล้ว

    Advertising bhi ho gayi

    • @magikarp1666
      @magikarp1666 4 หลายเดือนก่อน

      Yaha koi public service nahi ho rahi hai ki free mai video upload kare. TH-cam zyada Paisa nahi deti

  • @maheshgavaskar8093
    @maheshgavaskar8093 ปีที่แล้ว

    👍

  • @prazbhat
    @prazbhat ปีที่แล้ว

    A fake advertisement video

  • @ronakraut9909
    @ronakraut9909 ปีที่แล้ว +3

    Power train TH-cam channel is bjp baised

  • @tukaidas1272
    @tukaidas1272 ปีที่แล้ว +1

    Mumbai metro 46 km
    Shanghai metro 831 km
    We are way way way behind 😂😂

    • @silentdevil311
      @silentdevil311 ปีที่แล้ว

      Muh mei lega kya behind se

    • @bhabak.2oot
      @bhabak.2oot ปีที่แล้ว +1

      Delhi metro dekh Hyderabad metro dekh

    • @silentdevil311
      @silentdevil311 ปีที่แล้ว +2

      @@bhabak.2oot isko apna kanpur metro aur Lucknow metro ki construction speed batao iska pura china andar jayega 😂

    • @tukaidas1272
      @tukaidas1272 ปีที่แล้ว

      @@bhabak.2ootchutiya i only say about mumbai not other city idiot

  • @tukaidas1272
    @tukaidas1272 ปีที่แล้ว

    Mumbai metro third class metro only 46 km 😂😂😂

  • @tukaidas1272
    @tukaidas1272 ปีที่แล้ว

    Mumbai metro is third class only 46 km

  • @siddeffects
    @siddeffects 4 หลายเดือนก่อน

    Need Thane-Kalyan-Dombivali-Karjat Mega Expressway 16 lanes minimum

  • @rahulmishra4150
    @rahulmishra4150 25 วันที่ผ่านมา

    Awaiting for Metro 14

  • @sachinpawar7069
    @sachinpawar7069 10 หลายเดือนก่อน

    Irrts good for long distance. Metro line 14 better use irrts😊

  • @niteshvishwakarma7759
    @niteshvishwakarma7759 ปีที่แล้ว

    Aap aisehi mumbai ka news Diya kriye letest ❤