Excellent sir 👏
India's no 1 land surveyors training institutes
Awesome sir ❤❤
Thanks
Thank you so much for great content.
Thanks for watching!
❤❤❤nice ❤❤❤
Nice
Sir please labour output and mechanical output kase nikale ek video bana dijiye na
Ok as soon as possible
Sir ex for, exvetion rl. Ke jagh exvetion depth diya rhega almost 1.3m ya 2m to kese kre ge rl ke thru
Ok is per bhi video bana denge
Cutting ka IS JO LIYE HE NGL PR LIYE HE YA BED LEVEL PR LIYE HE. ?
Apka training institute kaha par hai
Jamshedpur Jharkhand me hai
Which place
Sir aapke pas cource karne me kitna samay lagega
One year Diploma Land Surveyor ka Course hai but Regular Theory with Practical Class karakar 3 month me bhi aap complete kar sakte hai more information 7250754216
Sir pcc ka level with autolevel batiye
Ok video zaldi aayega
Sir tik sei samaj main nahi aya clear nahi huya
Sir is drawing reading ka video banana
Ok sure
Simple LevellingRoad Reading : 1.075Cutting Reading : 3.2751.075 - 3.275 = - 2.2 meter2.2 × 3.28 = 7.216 FeetAccording to Reduce LevelTBM = 100BS = 0.450HI = 100.450 ( TBM+BS)Road RL = 99.375Excavation RL = 97.175HI - Excavation RL100.450 - 97.175 = 3.275HI - Road RL100.450 - 99.375 = 1.075
Calculation mistake kiye hai aapke trainee engineer's Sir
Excellent sir 👏
India's no 1 land surveyors training institutes
Awesome sir ❤❤
Thanks
Thank you so much for great content.
Thanks for watching!
❤❤❤nice ❤❤❤
Nice
Thanks
Sir please labour output and mechanical output kase nikale ek video bana dijiye na
Ok as soon as possible
Sir ex for, exvetion rl. Ke jagh exvetion depth diya rhega almost 1.3m ya 2m to kese kre ge rl ke thru
Ok is per bhi video bana denge
Cutting ka IS JO LIYE HE NGL PR LIYE HE YA BED LEVEL PR LIYE HE. ?
Apka training institute kaha par hai
Jamshedpur Jharkhand me hai
Which place
Jamshedpur Jharkhand me hai
Sir aapke pas cource karne me kitna samay lagega
One year Diploma Land Surveyor ka Course hai but Regular Theory with Practical Class karakar 3 month me bhi aap complete kar sakte hai more information 7250754216
Sir pcc ka level with autolevel batiye
Ok video zaldi aayega
Sir tik sei samaj main nahi aya clear nahi huya
Sir is drawing reading ka video banana
Ok sure
Simple Levelling
Road Reading : 1.075
Cutting Reading : 3.275
1.075 - 3.275 = - 2.2 meter
2.2 × 3.28 = 7.216 Feet
According to Reduce Level
TBM = 100
BS = 0.450
HI = 100.450 ( TBM+BS)
Road RL = 99.375
Excavation RL = 97.175
HI - Excavation RL
100.450 - 97.175 = 3.275
HI - Road RL
100.450 - 99.375 = 1.075
Calculation mistake kiye hai aapke trainee engineer's Sir