Connection gas in English | IWCF | Well control | Drilling | trip gas | background gas | BHP | APL

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ส.ค. 2024

ความคิดเห็น • 12

  • @sandeepgusain4468
    @sandeepgusain4468 ปีที่แล้ว +1

    Sir good information

  • @muhammadzahran3738
    @muhammadzahran3738 ปีที่แล้ว +1

    Really appreciate🙏😊

  • @zeeshankhan-mb1jg
    @zeeshankhan-mb1jg 3 ปีที่แล้ว +3

    Sir appreciate your work and way to teach people we are waiting for your complete lectures about iwcf

  • @krishechuri7405
    @krishechuri7405 2 ปีที่แล้ว +1

    It is very easy to understand by this scenario sir. Thank you

  • @falahalhajri5067
    @falahalhajri5067 ปีที่แล้ว +1

    How about pumping from backside thru the annulus while making connect ? This will force the influx to stay at it is level and preventing getting more influx

  • @vladimirvasquez203
    @vladimirvasquez203 ปีที่แล้ว +1

    thanks for sharing!! How to estimate the swab pressure?

  • @MrX3room
    @MrX3room 2 ปีที่แล้ว +1

    Thanks so much sir!

  • @habibakid1432
    @habibakid1432 3 ปีที่แล้ว +1

    Thank you.Still waiting for Ram Closing Ratio presentation.

  • @harshithshettys9012
    @harshithshettys9012 2 ปีที่แล้ว +3

    How about we continue our pumping until we space out and set the slip. And break tds for new connection which will not allow a swab below the bit. Will this not be a good practice to develop

    • @fahmietalife
      @fahmietalife 2 ปีที่แล้ว

      If you are flowing with high flow rate and having high pressure in the string while you set in slip, you might damage the pipe.
      But usually i suggest driller to drop down the rate to 100gpm with standpipe pressure around 100 to 200 psi and set in slip to reduce the swab effect.

    • @harshithshettys9012
      @harshithshettys9012 2 ปีที่แล้ว

      @@fahmietalife how/why will it damage the string if it set on slip?

  • @panchalshlok92
    @panchalshlok92 2 ปีที่แล้ว +1

    sir how do we get idea about bottoms up time