    This is an officetel completed in February 1992.
    [Introduction to the elevator]
    The 1992 Goldstar Elevator CGL was driven out and modernization was completed with Sigma DS-4 in 2019.
    The design was changed once, and the options were generally ordinary. However, the exterior of Unit 2 was preserved in the B1 floor and lower.
    The speed was appropriate at 180 m/min for an administrative distance of 25 floors.
    Before Modernization: • 대전광역시 유성구 봉명동 홍인타워 금성 ... (Shot by Channel LXVF1)
    [Digression]
    The main section of this building was originally a 1992 Goldstar CGL, but unit 2 in the middle was modernized first in 2014, unit 3 was modernized in 2018, and unit 1, which you see now, was the last to be modernized.
    Please note that the observation section and Unit 2 are not in operation on weekends.