For 10 no's of 2.550 m cutting length we need 3 no's of full 12m length bar and after we get a balance cut piece of 1.8 m x 2 no's and 9.45 m x 1 no's for 1 footing , you should add one more colum in your Excel sheet as balance cut piece and utilize these cut piece bars in another footings, plz think once about this, for 1 footing we are wasting 3 pieces for 5 footing 15 pieces ,. This is not acceptable on site , we will get over estimate to order the steel.
@@ReinforceInstitute Ok it's my Bad I wasn't aware about your trainer Akshay Kamat..I watch some of his Videos which I thought might be a copyright because he have its own yt channel
Superb video brother 😊
Cleared all doubt 😊
One of the best youtube channel Reinforce Civil Engineers Training Institute
Thank you sir...... सर इतनी बखूबी से समझाए अपने वह ,,, सर बीम का भी बनाइए plz
Best Way to learning from there...
Awesome explanation Sir...
Thanks For Your Support and Comments !!
VERYVERY FINE & NEAT EXPLANATION. I ENJOYED IT.
very good sir ,aapne bahut accha samjhaya, sir i want this exel sheet .
Appreciated 👍👍
Best
thank you sir
and your teaching quality is excellent
Super sir
Very Informative Video sir.
I loved it ❤️❤️❤️
Thank you so much sir
Nice information
Thank you sir
Sir main Steel minus nahi kiya 10mm from bottom side karna tha na .....
Distribution Steel ki cutting length nikalete wakt....
Bilkul minus hoga
Appreciate
Perfect
Very very good.
i guess we add bend deduction instead of subtracting so that bar will not get shorter
Bhayi jo Ld nikla h both side se uspar bhi to binder ayega na
Nice sir
Nice video
सर beam और column का प्लीज बनाइए
Very soon
@@ReinforceInstitute सुक्रिया सर, हम आपका आभारी रहेंगे हम सब आपसे बहत कुछ सीख रहे हैं.
Footing me length ki along main steel provide karte hai .
For 10 no's of 2.550 m cutting length we need 3 no's of full 12m length bar and after we get a balance cut piece of 1.8 m x 2 no's and 9.45 m x 1 no's for 1 footing , you should add one more colum in your Excel sheet as balance cut piece and utilize these cut piece bars in another footings, plz think once about this, for 1 footing we are wasting 3 pieces for 5 footing 15 pieces ,. This is not acceptable on site , we will get over estimate to order the steel.
Excel। Sheet milega kya
Sir circular tank ka bbs ki video bna do
last me confusion h sir....1 footing k lie total weight of steel kitni hogi
D2/162 weight formula for steel
Not added Wastage of cutting in calculation for requirements of reinforcement.
Sir how to download your bbs footing excel sheet
Exceo sheet link milega kya sir...
Baia. Video ki andar always hindi me bat kariye ga..,,, please,,,, humko jaldi samaj me atahe
Ye wala Excel sheet kese banaye?
sir steel wastege kyu nhi add kie?
Advantage of BBS :-BBS avoid wastege of steel rainforcement thus save project cost
Sir could you plz share the excel sheet with us
i also need
L 150 hai to 300 kaise aaya ek side
L+2 =300mm
L+2 =300
i am also thinking same..bemd lenth is 6inch=150mm so 2 bends means 300mm,why extra 300 mm is added
It's a copyright video
Proof it it's copyright video ..and claim it ..
Its a video by our trainer Akshay kamat who was working with us year ago..
Thanks
@@ReinforceInstitute Ok it's my Bad I wasn't aware about your trainer Akshay Kamat..I watch some of his Videos which I thought might be a copyright because he have its own yt channel
..bend lenth is 6inch=150mm so 2 bends means 300mm,why extra 300 mm is added.can you please clarify ?
@@ReinforceInstitute ..bend lenth is 6inch=150mm so 2 bends means 300mm,why extra 300 mm is added.can you please clarify ?
@@khansamser1same doubt , please explain
Appreciated 👍